This Government Contract opportunity from Texas was posted on July 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Erosion Control and Stormwater Management
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract requires the installation of both temporary and permanent erosion control measures to ensure compliance with environmental regulations during bridge construction activities. Key components include silt fences, sediment basins, and riprap, all designed to prevent soil displacement and manage stormwater runoff to protect nearby waterways and ecosystems. These measures must be implemented in accordance with applicable state and federal environmental standards and maintained throughout the construction phase. This is a subcontract issued by the Texas Department of Transportation with a response deadline of August 5, 2026, and was posted on July 13, 2026. The North American Industry Classification System code 562910 indicates it falls under other support activities for waste management, specifically related to environmental remediation and control services. The project is located within Texas, though specific city or jurisdictional details are not provided. Interested parties must submit proposals through the Texas SmartBuy portal by the stated deadline to be considered for award.
General Info
Agency
NAICS
Place of Performance
TX, USSet-Aside
Documents
This scope was carved out of 6496-31-001_0826.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
STATE LET MAINTENANCE CONTRACT, BELL CO, BRIDGE REPAIR
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
