Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ethel Avenue Road Stabilization

Closed
20260625025State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
ITB # 002-26 Asphalt Road Resurfacing and Milling
Solicitation # PE-62350-NONST-2026-000000015
The City of Fort Oglethorpe is soliciting sealed bids for ITB #002-26, which involves asphalt road resurfacing and milling on various city streets within Fort Oglethorpe, Georgia. The project scope includes traffic control, milling and patching, recycled asphalt concrete leveling, Superpave Type II asphalt, bitumen tack coat, and thermoplastic striping. Work will be performed on specific streets such as Century Station Drive, Outpost Drive, and others, depending on available funding. The project must be completed by June 30, 2027. Bids must be delivered to the City Clerk and Assistant Finance Director by Thursday, December 3, 2026, at 2 p.m. The award will be granted to the lowest responsive and responsible bidder who is a GDOT-approved contractor and adheres to GDOT specifications. A critical requirement is that the awarded company must self-perform at least 70 percent of the work. Bidders must submit a complete package in a specific order, including the Bid Proposal Form, Bid Fee Form, Execution of Bid Form, Exception Sheet, Affidavit of Non-Collusion, Certificate of Insurance, and an E-Verify Compliance Affidavit. Additionally, contractors must provide a Georgia Occupational Tax Certificate and maintain minimum Worker's Compensation and General Liability Insurance. All written inquiries must be submitted by November 20, 2026.
City of Fort Oglethorpe

POSTED

about 1 hour ago

DEADLINE

in about 1 month
NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix and precast concrete. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Qualified bidders must possess a valid California Contractor license and provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must be certified by recognized agencies such as the SBA, MBDA, or CUCP prior to the bid opening. The deadline for responses is November 18, 2025, at 2:00 p.m., with invitations and instructions managed through the Building Connected system. Primary contact for this solicitation is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 20 days
NAICS: 237310
New
Federal
FA8501-27-RAPID-PAVE-OTA
Solicitation # FA8501-27-RAPID-PAVE-OTA
The Department of the Air Force, 78th Civil Engineer Group, is seeking industry solutions to restore, modernize, and sustain critical airfield infrastructure at Robins Air Force Base, Georgia. Executed under the Robins Agile Practices for Infrastructure Development (RAPID) framework and the statutory authority of 10 U.S.C. 2808a, this project utilizes a Build-Only Other Transaction Agreement (OTA) approach. The scope of work involves the repair and replacement of runway 3901 pavement and shoulders, the south runway overrun, Taxiway C (Facility 3931), and drainage and storm-drain disposal systems at Facility 8700. The estimated magnitude of construction for this effort is between 58 million and 108 million dollars, with a total contract period of performance of 1,120 calendar days after the Notice to Proceed. The government is utilizing a two-step, best-value selection process. Step one requires a Phase 1 Solution Brief, due by 3:00 PM EST on October 30, 2026, which must demonstrate at least five years of experience in comparable government runway or taxiway projects. Short-listed firms will advance to step two, consisting of interactive pitch presentations and the submission of a formal price proposal. Evaluation factors focus on past performance in restricted airfield environments, the qualifications of key personnel, technical understanding of the 100 percent government-furnished design, and financial bonding capacity. Special emphasis is placed on managing congested site logistics, mitigating environmental risks related to PFAS-impacted soil, and minimizing disruptions to active aircraft operations.
FA8501 Opl Contracting Afsc/pzio

POSTED

about 2 hours ago

DEADLINE

in 2 days
NAICS: 237310
New
SLED
Traffic Signal Maintenance Throughout The City Of Brea
Solicitation # 26-02
The City of Brea is soliciting proposals under solicitation number 26-02 for the comprehensive maintenance of traffic signal facilities throughout the city. The scope of work encompasses approximately 53 city-owned signalized intersections and five flashing beacon locations, including all associated controllers, cabinets, detection systems, battery backups, and fiber-optic networks. The selected contractor must provide all necessary labor, materials, and equipment, ensuring that all emergency and field responses are performed by or supervised by an IMSA certified Traffic Signal Technician. Key performance requirements include a 24-hour response time for routine service requests and the maintenance of specific spare hardware, including Econolite ASC/3 and Trafficware Scout controllers. The contract will be awarded based on best value rather than the lowest cost, with evaluation weighted across firm qualifications (30%), proposed team and organization (25%), the detailed work plan (25%), and the fee schedule (20%). Proposals must be submitted in hard copy and via flash drive to the City Service Yard by November 12, 2026. The agreement includes a one-year warranty on services and requires compliance with California Labor Code regarding workers' compensation and prevailing wages. Payment is structured on a net 30-day cycle following the receipt of undisputed invoices. Required submission documents include a noncollusion declaration, a declaration of eligibility to contract, and a detailed payment schedule.
CITY OF BREA

POSTED

about 3 hours ago

DEADLINE

in 15 days
NAICS: 237310
New
SLED
HSIP Cycle 11 Pedestrian Crossing Enhancements
Solicitation # 2026-IFB-CIV-0436
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0436 for the HSIP Cycle 11 Pedestrian Crossing Enhancements project. The scope of work involves furnishing and installing rectangular rapid flashing beacons (RRFB) at two specific intersections: Green Street at Michigan Avenue and Green Street at Chester Avenue. Key deliverables include the installation of signal poles, flashing beacons, conduits, conductors, and pull boxes, as well as associated civil works such as curb ramp work, miscellaneous concrete, and traffic striping. The project must adhere to 2024 CalTrans Specifications for concrete testing and City of Pasadena Standard Plan S-414 for embedded federal yellow detectable warning surfaces. The contract will be awarded to the lowest responsive and responsible bidder based on the grand total of the bid. Bidders must submit their responses electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 19, 2026. Required documentation includes a 5 percent electronic surety bid bond, Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a DHS Disclosure Form, and a signed IRS Form W-9. Contractors must be registered with the California Department of Industrial Relations and comply with state prevailing wage laws and equal employment opportunity practices. Performance must begin within 15 calendar days of the Notice to Proceed, with a base bid completion timeline of 60 working days and a bid alternate timeline of 10 working days. The contractor is required to obtain a Pasadena business license and comply with federal-aid contract language, including form FHWA-1273. Invoicing is managed through the City's dedicated online submission website, with checks issued on Tuesdays and Thursdays. All work must be fully accessible in accordance with the California Building Code and Title 24 regulations.
Public Works Department, Engineering

POSTED

about 4 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The Ethel Avenue Road Stabilization project, solicitation PW 25-13, is a construction effort by the City of Mill Valley, California, to repair storm damage caused by a 2021 atmospheric river event. The scope of work involves stabilizing a portion of Ethel Avenue through the improvement of one existing retaining wall and the installation of two new Cast-in-Drilled Hole pile retaining walls with ground anchors and concrete walers. Additional requirements include mobilization, traffic and water pollution control, roadway excavation, structure backfill, guardrail installation, and asphalt pavement restoration featuring a 2-inch overlay and new AC berm. The project also encompasses clearing, grubbing, utility potholing, and crack sealing. The contract is a fixed-price solicitation with an engineer's estimate of $1,028,215. Bids are due by 2:00 p.m. on July 9, 2026, and the award will be granted to the lowest responsible, responsive bidder. Once awarded, the contractor must commence work within ten working days and complete the base bid requirements within 40 working days. Performance must adhere to Caltrans 2023 Standard Specifications and Marin County Uniform Construction Standards. Key compliance mandates include prevailing wage laws, minority and women business enterprise participation, and strict environmental controls to prevent stormwater contamination. Final acceptance is based on on-site inspections conducted by the City Engineer.

General Info

Mill Valley road stabilization project, $1,028,215 fixed-price bid due July 9, 2026.

Place of Performance

Mill Valley, CA, 94941, USA

Set-Aside

NONE

Documents

3

BID Plans - Ethel Ave Retaining Wall Construction Notes

PDF, High priority: read this firstspecifications
High

CIP PW 25-13 Ethel Avenue Road Stabilization Request for Bid Proposals

PDF, High priority: read this firstrfb
High

Geotechnical Investigation Report for 2021 Storm Damage at 389-416 Ethel Avenue

PDF, High priority: read this firstgeotechnical-investigation
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Mill Valley
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Director of Public Works

Full Description

Show more
Bid #PW 25-13: The project consists of stabilizing a portion of Ethel Avenue by improving one existing retaining wall and installing two new CIDH pile retaining walls. The scope includes mobilization, traffic control, water pollution control, construction of the retaining walls with ground anchors and a concrete waler, installation of guard railing, roadway excavation, structure backfill, placing aggregate base, and restoring asphalt pavement with a 2-inch overlay and new AC berm. The work also involves clearing and grubbing, potholing utilities, crack sealing, erosion control, and final cleanup.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS