Euclid Avenue Bridge Project

Forecast
2026010287State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Euclid Avenue Bridge Project, managed by the City of Chino Public Works Department, involves the construction of a new multi-span viaduct structure approximately 2,400 to 2,500 feet long. The project aims to raise Euclid Avenue above the Prado Basin 50-year inundation pool elevation to prevent flooding and improve safety for motorists and pedestrians. The scope includes widening the roadway to four lanes to match existing capacity and adding bicycle and pedestrian lanes in compliance with ADA standards. The project site covers approximately 24.2 acres, including the paved Euclid Avenue roadway and the Chino Creek Bridge 54-1248. Environmental compliance is a primary focus, with a Draft Environmental Impact Report evaluating air quality, biological resources, noise, and cultural impacts. Key requirements include mitigating effects on endangered bird habitats, adhering to South Coast Air Quality Management District standards, and ensuring full-time on-site archaeological and tribal monitoring during ground-disturbing activities. Construction is anticipated to begin in March 2027, with a development duration of 18 to 24 months and an estimated total project value of 150 million dollars. Work hours are restricted to weekdays between 7:00 a.m. and 8:00 p.m. per local municipal codes.

General Info

City of Chino bridge project, 150 million dollars, starting March 2027 for flood prevention.

Place of Performance

Euclid Avenue, Pine Avenue, Pomona Rincon Road, CA, 91710

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Chino
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → City of Chino
Office AddressN/A
Contacts
Michele HindersinnSenior Engineer
Sonya HookerDirector of Environmental Services

Interested Companies (2)

RVARancho Cucamonga, CA
RVARancho Cucamonga, CA

Full Description

Show more
The Project site is approximately 24.2 acres in area and primarily consists of the paved Euclid Avenue roadway and the Chino Creek Bridge 54-1248, where Euclid Avenue crosses the Prado Basin. The Project would raise Euclid Avenue above the Prado Basin 50-year inundation pool elevation (543 feet above mean sea level) over the existing paved Euclid Avenue. The Project would include construction of a new viaduct structure (i.e., “Euclid Avenue Viaduct”) that would cross over Chino Creek and Pomona Rincon Road within the Prado Basin. The Project would widen the new bridge to four lanes to match the existing roadway capacity and add bicycle and pedestrian lanes, facilitating traffic circulation. The Project would also install retaining walls and imported fill soils. The maximum height of the viaduct is not anticipated to exceed approximately 28 feet above ground level. The Project would prevent future closures during storm events, reduce the possibility of encountering flood waters, thereby improving safety for motorists and pedestrians, and enhancing mobility and circulation for the community during the rainy season.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including SWPPP and quality control. Kiewit is specifically seeking qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Furthermore, Kiewit prioritizes bidders who can demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid through the Building Connected electronic system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
RFB-PARKS-MISSISSIPPI RIVER BLVD RETAINING WALLS REBID
Solicitation # 1777
The City of Saint Paul Parks Department is soliciting bids for the Mississippi River Blvd Trail Improvement Project, which involves the removal and reconstruction of retaining walls, trails, and fencing near Princeton Avenue. The scope of work includes the removal of existing Loffelstein walls and bituminous walks, the installation of soldier pile walls with galvanized steel bridge plank lagging, and the paving of a new bituminous trail. The base bid must include an ADA trail transition to connect to the existing trail. Key deliverables include site protection, erosion control, and the installation of concrete pile caps and structural backfill. The contract will be awarded to the lowest responsible base bidder based on an evaluation of their experience, financial resources, and technical capabilities. Bidders must submit their responses via the City of Saint Paul Supplier Portal by December 9, 2026, using the required Excel bid form. Mandatory compliance requirements include adhering to the City of Saint Paul Little Davis-Bacon prevailing wage standards and Affirmative Action/Equal Employment Opportunity specifications. Upon award, the successful contractor must provide performance and payment bonds, certificates of insurance, and human rights compliance documentation. The work is subject to a one-year guarantee from the date of substantial completion.
City of Saint Paul

POSTED

about 11 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237310
New
SLED
RFB-PW-SAINT ANTHONY MILL&VERLAY 2026
Solicitation # 1785
The City of Saint Paul Parks Department is soliciting bids for the 2026 Saint Anthony Mill and Overlay project, located along Saint Anthony Avenue and Rondo Avenue between Snelling Avenue and Marion Street. The scope of work focuses on pavement resurfacing via a standard 2-inch mill and overlay, as well as significant pedestrian and safety enhancements. Key deliverables include the construction of curb extensions, ADA-compliant pedestrian ramps, concrete curb replacement, storm sewer installation, and the paving of off-street bike paths. All work must adhere to the City of Saint Paul Department of Public Works governing specifications and the 2026 MnDOT Schedule of Materials Control. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit all documentation through the City of Saint Paul Supplier Portal by December 7, 2026, at 2:00 PM CST. Required financial protections include a performance bond and a payment bond, each equal to 100% of the contract amount, and general liability insurance with a $1,500,000 per occurrence limit. The project is subject to the Little Davis-Bacon Ordinance regarding prevailing wages and includes a Vendor Outreach Program to encourage the participation of local small, woman-owned, and minority-owned businesses. Contractors must also provide a signed statement under oath verifying compliance with minimum criteria per Minnesota Statutes.
City of Saint Paul

POSTED

about 11 hours ago

DEADLINE

in 26 days
View Details

More opportunities from California → City of Chino

Same awarding agency

NAICS: 925120
SLED
Chino 2045 General Plan Update
Solicitation # 2024090833
The City of Chino has undertaken a comprehensive update to Title 20 of its Municipal Code to align zoning regulations with the adopted 2045 General Plan, which was certified under CEQA on September 2, 2025. This amendment reorganizes and revises multiple zoning chapters to implement new land use designations including Regional Mixed Use, Boulevard Mixed Use, Downtown, and Employment Mixed Use, while eliminating outdated specific plans such as Central Avenue, Eucalyptus Business Park, and Spectrum Center, integrating their standards directly into the Zoning Code. The changes are designed to promote economic development, streamline regulations, and ensure consistency with the General Plan’s vision for mixed-use, walkable communities, enhanced multi-modal transportation, and environmental justice. All zoning map amendments involve reclassifications from one existing district to another and are fully compliant with Measure M, the city’s residential growth control measure. The City Council formally adopted Ordinance No. 2026-008 and Ordinance No. 2026-009 on July 21, 2026, to enact these updates. Environmental review was completed under CEQA through the certification of the 2045 General Plan Environmental Impact Report, which adequately covered the scope of these zoning amendments. No new significant impacts were identified, and therefore no additional environmental review is required. The project area spans approximately 20,626 acres across the City of Chino, with key implementation sites including Riverside Drive, the Pine Avenue Connector, and various industrial and employment corridors. Performance standards such as good neighbor policies for industrial uses, pedestrian and bicycle safety enhancements, truck traffic management, and streetscape improvements are integral to the plan. The City of Chino serves as the lead agency and project applicant, with Michael Hitz, Principal Planner, designated as the primary point of contact. No formal contract clauses, pricing, delivery schedules, or procurement-specific requirements such as FAR sections, COR/COTR assignments, or invoicing protocols are specified, as this is a municipal planning and regulatory update rather than a traditional procurement contract. The project’s environmental compliance documents, including a Negative Declaration and CDFW determinations, were filed with the State Clearinghouse under number 2024090833.
Administration of Urban Planning and Community and Rural Development

POSTED

15 days ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS