Euclid Avenue Bridge Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Euclid Avenue Bridge Project in Chino, California, is a major infrastructure initiative aimed at elevating Euclid Avenue and replacing the existing Chino Creek Bridge 54-1248 with a new viaduct structure to raise the roadway above the 50-year inundation level of the Prado Basin, estimated at 543 feet above mean sea level. The project will construct a four-lane viaduct spanning Chino Creek and Pomona Rincon Road, designed to a maximum height of approximately 28 feet above ground level, while also incorporating dedicated bicycle and pedestrian lanes to enhance multimodal mobility. The work includes installing retaining walls and importing fill soils to support the new alignment, with construction scheduled to begin in April 2027 and extend over a 24-month period. The primary objectives are to prevent storm-related closures, mitigate flood risks, improve public safety, and ensure uninterrupted transportation circulation during rainy seasons. The project site covers approximately 24.2 acres along Euclid Avenue between Pine Avenue and State Route 71 in San Bernardino County, with all construction activities occurring within this corridor. The project is governed by California environmental regulations, primarily the California Environmental Quality Act (CEQA), and must comply with the California Endangered Species Act, Clean Air Act, and applicable state and local codes, including the Chino Municipal Code and California Code of Regulations. Compliance measures include implementing mitigation strategies to address potential environmental impacts such as air quality degradation, noise, biological resource disruption, and light pollution, all of which were evaluated in alignment with CEQA thresholds of significance. Contract administration and acceptance authority reside with the City of Chino, acting as the Lead Agency, with oversight involvement from the California Department of Fish and Wildlife, the U.S. Army Corps of Engineers, and other regulatory bodies. The estimated contract value exceeds $12.7 billion, driven largely by fuel cost projections for construction equipment over the two-year build timeline, with detailed pricing provided for gasoline, diesel, and natural gas across 2027 and 2028, including potential option quantities. While the solicitation and contract form do not specify a formal contract type, delivery location, or payment terms, the procurement is handled directly by the City of Chino through its Public Works Department, with the Senior Engineer as the primary point of contact. Packaging and marking must adhere to California state mandates under SB 54 and AB 1201, requiring all materials to be recyclable, compostable,

General Info

Raise Euclid Avenue bridge above flood level, add four lanes and bike-pedestrian paths to improve safety and resilience.

Agency

California → City of Chino

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Euclid Avenue, Pine Avenue, Pomona Rincon Road, CA, 91710

Set-Aside

NONE

Documents

(17)

Euclid Avenue Bridge Project Notice of Completion

PDFnotice-of-completion

Euclid Avenue Bridge Project Draft Environmental Impact Report June 2026

PDFdeir

Euclid Avenue Bridge Project Summary Form for Document Submittal

PDFenvironmental-summary

Appendix G - Noise Assessment for Chino Euclid Bridge Project

PDFnoise-assessment

Appendix C - Biological Technical Report for Euclid Avenue Bridge Project

PDFbiological-technical-report

Appendix H - Traffic Analysis for Euclid Avenue Bridge Project

PDFtraffic-analysis

CDFW Comment on Euclid Avenue Bridge Project NOP 2026010287

PDFcomment

R2401 CEQA Notice of Completion for Euclid Avenue Bridge Project

PDFceqa-notice-of-completion

Preliminary Geotechnical Report for Euclid Avenue Bridge Replacement

PDFpreliminary-geotechnical-report

Euclid Avenue Bridge Project Environmental Summary

PDFenvironmental-summary

Appendix D - Cultural Resources Assessment for Euclid Avenue Bridge Project

PDFcultural-resources-assessment

2026010287 NAHC Comment on Euclid Avenue Bridge Project

PDFcomment

NOP for Euclid Avenue Bridge Project EIR

PDFpresolicitation

Appendix F - Hydrology and Hydraulics Report for Euclid Bridge Replacement Project

PDFreport

Appendix B - Air Quality, GHG, & Energy Assessment for City of Chino Euclid Avenue Bridge

PDFenvironmental-assessment

Notice of Availability - Draft Environmental Impact Report for Euclid Avenue Bridge Project

PDFspecial-notice

Appendix A - NOP Comment Letters and Outreach for Euclid Avenue Bridge Project

PDFnop-comment-letters-outreach

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Chino
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Chino
Office AddressN/A
Contacts
Michele HindersinnSenior Engineer
Sonya HookerDirector of Environmental Services

Interested Companies (2)

Show more
RVA
Rancho Cucamonga, CA
RVA
Rancho Cucamonga, CA

Full Description

Show more
The Project site is approximately 24.2 acres in area and primarily consists of the paved Euclid Avenue roadway and the Chino Creek Bridge 54-1248, where Euclid Avenue crosses the Prado Basin. The Project would raise Euclid Avenue above the Prado Basin 50-year inundation pool elevation (543 feet above mean sea level) over the existing paved Euclid Avenue. The Project would include construction of a new viaduct structure (i.e., “Euclid Avenue Viaduct”) that would cross over Chino Creek and Pomona Rincon Road within the Prado Basin. The Project would widen the new bridge to four lanes to match the existing roadway capacity and add bicycle and pedestrian lanes, facilitating traffic circulation. The Project would also install retaining walls and imported fill soils. The maximum height of the viaduct is not anticipated to exceed approximately 28 feet above ground level. The Project would prevent future closures during storm events, reduce the possibility of encountering flood waters, thereby improving safety for motorists and pedestrians, and enhancing mobility and circulation for the community during the rainy season.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 18 hours ago

DEADLINE

in 24 days
View Details