EV Charging Infrastructure Supply
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract seeks the supply of electric vehicle charging stations and associated hardware designed to be fully compatible with transit-grade electric vehicles, supporting both depot-based and field operations. The equipment must meet rigorous performance and durability standards suitable for public transit environments, ensuring reliable and scalable charging infrastructure that can sustain high-frequency vehicle use. The solicitation is issued as a subcontract under the Department of Transportation’s North Carolina division, with the North American Industry Classification System code 335912 indicating focus on other electrical equipment and component manufacturing. Responses are due by July 27, 2026, and the opportunity was posted on July 6, 2026. The infrastructure must be capable of integration with existing transit systems and comply with all applicable technical and safety regulations for public transportation applications. While the exact location of performance is not specified, the scope implies delivery and installation across multiple sites within North Carolina to support statewide public transit electrification goals. The contract does not include set-aside provisions, and no point of contact information is provided in the posting.
General Info
Agency
NAICS
Place of Performance
NC, USSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
