Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Extension of Time (PA26-0266)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Planning Application PA26-0266 is a sixth extension of time request for a two-year extension to the previously approved development plan PA17-0854. The project involves the construction of a four-story hotel with underground parking located at 41950 4th Street in Temecula, California, covering Assessor Parcel Numbers 922-034-019 through 922-034-024. This administrative action does not propose any new construction or additional square footage beyond the original approvals. The City of Temecula has filed a Notice of Exemption for this request, stating that the project is exempt from further environmental review under CEQA Guidelines Section 15061(b)(3), as well as Public Resources Code Section 21152 and 14 California Code Regulations 1507. The filing was processed with a 50 dollar fee and is managed by Assistant Planner Yannin Marquez. The project is classified under NAICS code 236220.

General Info

City of Temecula grants two-year extension for four-story hotel construction at 41950 4th Street.

Agency

California → City of Temecula

Place of Performance

Front Street, Temecula, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Temecula
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Temecula
Office AddressN/A
Contacts
Yannin MarquezAssistant Planner

Full Description

Show more
A sixth Extension of Time for a two-year extension of time to the previously approved development plan (PA17-0854) for a four-story hotel with underground parking located at 41950 4th Street

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 70Z04726RPCNI0018
Solicitation 70Z04726RPCN0018 is a fixed-price design-build contract for the construction of a full-motion Weapons System Trainer facility for HC-130J aircraft at USCG Base Elizabeth City, North Carolina. The project involves the creation of an approximately 13,000 gross square foot facility designed to house a Government Furnished, Government Installed mobile simulator. Key spaces include classrooms, administrative offices, debriefing areas, and essential support rooms for electrical, mechanical, and telecommunications systems. Site work encompasses the installation of sidewalks and landscaping while utilizing existing parking areas. The project has an estimated value of approximately 16 million dollars and a period of performance of 719 calendar days from the date of award. Technical requirements specify adherence to ASCE 24 Flood Design Class II and the mandatory use of Siemens Building Automation System equipment to ensure compatibility with existing base infrastructure. The award will be based on best value using tradeoff selection procedures, evaluating non-price factors such as planning, organization, communication, and construction approach—with a preference for offerors experienced in military or commercial flight simulators. Compliance mandates include the Davis-Bacon Act for prevailing wages, UFC 4-010-06 for cybersecurity of control systems, and strict security protocols requiring US citizenship for all on-site personnel. Quality control is managed through a rigorous system of preparatory and initial phase checklists, daily production reports, and government quality assurance inspections.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in about 21 hours
View Details
NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside, Design-Bid-Build project for the construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The scope of work includes site preparation, stormwater mitigation via an infiltration pond, the purchase and erection of the steel building, installation of a concrete slab, underground utilities, a dry pipe fire suppression system, and specialized dehumidifying equipment. The project must adhere to strict technical standards, including UFC 3-600-01, NFPA 13, and the 2021 International Building Code, with specific requirements for cybersecurity of control systems and Buy American Act compliance for fire alarm components. This Firm Fixed Price task order has an estimated magnitude between 1 million and 5 million dollars, with a statutory limit of 5 million dollars. The government will award the contract based on a balanced evaluation of technical capability and price. Technical evaluations will focus on the proposed project schedule, which must show completion within 360 days of the Notice to Proceed, and the qualifications of key personnel. The period of performance requires work to commence within 10 calendar days of the Notice to Proceed and be fully completed within 365 calendar days. All invoices are to be processed through Wide Area Workflow, and the project is subject to prevailing wage rates for Pierce County per General Decision Number WA20260111.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 17 days
View Details
NAICS: 236220
New
South Concourse Evolution (SCE) Bid Package 3
Solicitation # south-concourse-evolution-sce-bid-package-3
Hensel Phelps, acting as the General Contractor/Construction Manager, is soliciting bids for Bid Package 3 of the South Concourse Evolution (SCE) project at the Seattle-Tacoma International Airport in Washington. This solicitation is set aside for Small Disadvantaged Businesses under NAICS code 236220. The scope of work is divided into several subsystems, including Phase 1 glass and aluminum systems, vertical transportation for Phase 1 and select Phase 2, and the demolition and installation of passenger loading bridges. Additionally, the package covers the build-out of main electrical rooms, encompassing masonry, drywall, doors, frames, hardware, and miscellaneous metals. Budget ranges for these subsystems vary, with the glass and aluminum systems estimated between 7.5 million and 10 million dollars and passenger loading bridges between 3 million and 4.5 million dollars. The project is governed by a Project Labor Agreement and requires all subcontracts to be executed on standard Hensel Phelps forms. Bidders must submit a bid bond using the provided forms and successful awardees must furnish Small Business Administration Form ID numbers. The solicitation encourages participation from small, disadvantaged, veteran-owned, service-disabled veteran-owned, and HUBZone businesses. All subcontractors are required to provide a workers compensation waiver of subrogation. The response deadline for this solicitation is October 14, 2026.
Hensel Phelps

POSTED

about 5 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation is for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base in Groton, Connecticut. The project involves a comprehensive scope of work over 1828 calendar days, including the construction of six Containerized Long Weapons Storage units, two Box G, and one Box H earth-covered high-explosive magazines. Key construction elements include reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundations utilizing rigid inclusions and load transfer mats. Additionally, the project requires the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two specific buildings. The scope encompasses a wide range of trades, including demolition, abatement, structural steel, electrical utilities, plumbing, and mechanical work. Site preparations involve rock excavation, grading, and wetland mitigation, as well as the installation of access roads and paved loading areas. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must submit their responses by October 31, 2026, and should contact Rahul Maheshwari at J & J Contractors, Inc. for bid invitations and project documents.
J & J Contractors, Inc

POSTED

about 5 hours ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS