Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 29, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

F--SEEDING OF PROJECT LANDS DUE TO 2011 FLOODING

Awarded
W9128F-11-Q-G023Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115112
New
SLED
AS27-123 Central Utah Aerial Seeding Project Phase 1 - 2026
Solicitation # AS27-123
The State of Utah Division of Purchasing and the Division of Wildlife Resources are seeking a single contract award for the Central Utah Aerial Seeding Project Phase 1 - 2026. This Invitation for Bids aims to secure a responsive and responsible vendor to perform aerial seeding across three specific project areas: the Widemouth 2 Fire Rehab Project Phase I (3,964 acres), the Watts Mtn Phase II Project (2,210 acres), and the Tower Fire Aerial Seeding Project (206 acres), totaling 6,380 acres. The performance period is strictly scheduled from November 4, 2026, through November 16, 2026. Bids must be submitted on a cost-per-acre basis, and the award will be granted to the lowest total cost responsive and responsible vendor. Technical requirements mandate that aircraft be equipped with GPS for 100% coverage and maintain a maximum 80-foot seeding swath width to prevent stripping. The use of drones is strictly prohibited, and operations must be postponed if wind speeds exceed 10 miles per hour. Upon completion, the contractor must provide electronic coverage documentation in UTM projection North America Datum 1983. The contractor is responsible for securing flight operations from airports in Redmond, Fillmore, or Richfield, Utah. Administrative requirements include maintaining Commercial General Liability insurance with limits of $1 million per occurrence and $3 million aggregate, as well as statutory Workers' Compensation. Vendors must certify compliance with E-Verify, anti-boycott laws regarding the State of Israel, and various non-discrimination statutes. Invoices must be submitted within 30 days of delivery and will be paid within 30 days of receipt of a correct invoice. The State Entity reserves the right to inspect deliverables within 30 days of delivery to ensure conformity with the specified standards before final acceptance.
Utah

POSTED

6 days ago

DEADLINE

in 4 days
NAICS: 115112
New
SLED
Cherry Fire Aerial Seeding
Solicitation # CS27-114
The State of Utah Division of Purchasing, on behalf of the Division of Wildlife Resources, is soliciting quotes for aerial seeding services for the Cherry Fire project in Tooele County. The scope of work involves the application of a seed mix consisting of grasses, shrubs, and forbs across 4,651 total acres at elevations between 5,700 and 6,700 feet. Specifically, the contractor must apply seed at a rate of 12 lbs/acre over 704 acres of TLA lands and 18 lbs/acre over 3,947 acres of private lands. All work must be completed by November 11, 2026. Technical requirements include the use of GPS technology to ensure 100% coverage and a requirement to begin seeding by 8:00 a.m. to minimize drift, with the government reserving the right to postpone operations if wind speeds exceed 10 miles per hour. The contract will be awarded to the responsive and responsible vendor submitting the lowest cost, with bids required on a cost-per-acre basis. Selected vendors must maintain Commercial General Liability insurance of at least $1 million per occurrence and $3 million aggregate, as well as statutory Workers' Compensation insurance. Administrative terms specify that deliveries are F.O.B. Destination Freight Prepaid and Allowed, with a 30-day window for the state to accept or reject deliverables. Invoices must be submitted within 30 days of delivery, and payments are due within 30 days of invoice execution. Contractors must also comply with the Utah Government Data Privacy Act and certify compliance regarding anti-boycott actions, forced labor restrictions, and E-Verify registration for personnel employed in Utah.
Utah

POSTED

6 days ago

DEADLINE

in about 23 hours

AI Contract Overview

Show more

The US Army Corps of Engineers has issued a contract for the grading and seeding of approximately 18 acres of project lands at the Gavins Point Project near Yankton, South Dakota. The scope of work requires the contractor to provide all supervision, labor, equipment, and materials to finish grade and seed specific areas, including the Nebraska Tailwaters Recreation Area, Training Dike Recreation Area, a rock stockpile area, and a section below the southeast side of the Gavins Point Dam. The contractor is responsible for supplying 12-12-12 fertilizer and a specific seed mixture consisting of KY-31 fescue, Fawn fescue, and Perennial Rye grass, applied via drilling. Work was scheduled for completion between August 15 and September 7, 2011, with a final deadline of May 15, 2012, if unforeseen conditions occurred. Key requirements include daily equipment calibration, COR inspection of finished grading prior to seeding, and strict adherence to EM-385-1-1 safety regulations. The contractor is liable for any damage to government or personal property and must restore any damaged turf or facilities. Additionally, the contract includes an optional bid item for irrigation, requiring the contractor to pump water from the Missouri River until the grass reaches a minimum height of four inches.

General Info

Contract Value

$67,726.4

NAICS

115112 - Soil Preparation, Planting, and Cultivating

Place of Performance

NE, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
ContactsNo contacts available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
ContactsNo contact information available

Full Description

Show more
US ARMY CORPS OF ENGINEERS, GAVINS POINT PROJECT LOCATED NEAR YANKTON, SD. POC: GARY LEDBETTER +1 (555) 000-0000 Description / Specifications Grading and Seeding Gavins Point Project 1. GENERAL. 1.1. SCOPE OF WORK. The contractor shall provide all necessary supervision, labor, equipment, tools, fertilizer, grass seed and mulch to finish grade, and seed Gavins Point Project lands. The size of the area in this contract is approximately 18 acres. These lands are managed by the U.S. Army Corps of Engineers, Gavins Point Project, Yankton, South Dakota. The contractor will ensure that all work will meet the requirements and be completed by the time set by the Contracting Officer's Representative ( COR ). 2. LOCATION OF WORK. The location of services covered by this contract will be the Nebraska Tailwaters Recreation Area, Training Dike Recreation Area, rock stockpile area along South Dakota Highway 52 and an area directly below the southeast side of Gavins Point Dam and just north of the fishing wall. Nebraska Tailwaters is located approximately three miles south of Yankton South Dakota and five miles west on Nebraska Highway 121. The Training Dike Recreation Area is located approximately 4 miles west of Yankton, South Dakota and 2 miles south of South Dakota Highway 52. The rock stockpile is located approximately 4 miles west of Yankton South Dakota. 3. CONTRACTOR FURNISHED SUPPLIES. The contractor will furnish all supplies necessary to complete this contract. This includes fertilizer 12-12-12 which is to be applied at a rate of 5 lbs. / 1000 sq. ft., KY-31 fescue and Fawn fescue each to be applied at a rate of 4 lbs. / 1000 sq. ft., and Perennial Rye grass at a rate of 2 lbs. / 1000 sq. ft. 4. PRODUCTS. 4.1. Quality. Weed seed shall be a maximum of 0.5 percent by weight of the total mixture. Seed shall all be of the latest season's crop and bearing the producer's guaranteed analysis for purity, germination, and weed seed content. 4.2. Permanent Seed Species. Grass seed mixture shall be proportioned by weight as follows: Name Pounds Pure Live Seed/ 1,000 Sq. Ft. ____________ _________________________________ KY-31 fescue 4 Fawn fescue 4 Perennial Ryegrass 2 4.3. Seed Species. Seed species may be mixed together by the seed supplier or the contractor on site. 4.4. Substitutions. Substitutions will not be allowed without written request and approval from the Contracting Officer. 4.5. Fertilizer. Fertilizer shall be controlled release commercial grade, free flowing and uniform in composition, and consist of a nitrogen-phosphorus-potassium ratio of 12-12-12. Fertilizer will be applied at a rate of 5 lbs./ 1000 sq. ft. 5. EXECUTION 5.1. Seeding Time. Seeding of these areas shall be completed between August 15 - September 7th 2011. When excessive moisture, or other unsatisfactory conditions prevail, the work shall be stopped when directed. When special conditions warrant a variance to the seeding operations, proposed alternate times shall be submitted for approval. If unforeseen conditions exists the seeding will be completed NLT May 15, 2012. 5.2. Equipment Calibration. Immediately prior to the commencement of seeding operations, calibration tests shall be conducted on the equipment to be used. These tests shall confirm that the equipment is operating within the manufacturer's specifications and will meet the specified criteria. The equipment shall be calibrated a minimum of once each day during seeding. The calibration test results shall be provided within 1 week of testing. 5.3. Site Preparation. Prior to seeding the contractor will ensure the site is properly prepared including grading. The contractor will notify the COR upon completion of finished grading so the finish grading can be inspected by the COR prior to seeding. 5.4. Seeding. The method of seeding in this contract shall be drilling. 5.5. Installation. Prior to seeding, any previously prepared surface compacted or damaged shall be reworked to meet the requirements of paragraph 5.3. Site Preparation. 5.6. Quantity Check. Materials provided in bags, the empty bags shall be retained for recording the amount used. For materials provided in bulk, the weight certificates shall be retained as a record of the amount used. The amount of material used shall be compared with the total area covered to determine the rate of application used. Differences between the quantity applied and the quantity specified shall be adjusted as directed. 5.7. Restoration And Clean Up. Existing turf areas, pavements, and facilities that have been damaged from the seeding operation shall be restored to original condition at the contractor's expense. Excess waste material shall be removed from seeded areas and shall be disposed of offsite. 6. OPTIONAL BID ITEM . IRRIGATION After the seeding is completed, the contractor shall irrigate all seeded areas in this contract until the grass reaches a minimum height of four inches. Water for this irrigation will be pumped by the contractor from the Missouri River which is adjacent to the project areas. 7. Safety. The contractor shall adhere to all pertinent regulations as specified in EM-385-1-1 Safety and Health Requirements Manual which can be obtained at the Gavins Point Project Office. 8. Damage to Government Property. The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of his/her operations. This includes, but is not limited to, electrical boxes, buildings, posts and mulch around vegetation. Mulch will not be disturbed in any mowing or trimming operation. The Contractor shall advise the Contracting Officer's Representative of any damage to government property due to his/her operations, vandals or other cause on the day he/she first notices or is informed of such damage. 9. Damage to Personal Property. The Contractor will be responsible for any damage to private property (electrical cords, camping units, vehicles, etc.) caused by work operations under this contract. The COR shall be notified of any such damage caused within 24 hours of the occurrence of such damage. 10. It is highly recommended that prospective bidders tour the work areas to be seeded. Appointments can be made by contacting Gary Ledbetter, Natural Resource Manager at +1 (555) 000-0000.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 541990
New
Federal
Fort Campbell, KY - API 653 External Tank Inspection
Solicitation # W9128F27QA006
Solicitation W9128F27QA006 is a total small business set-aside for API 653 external above-ground storage tank inspections at Fort Campbell, Kentucky. The project focuses on facilities G7140 and H7140 and is structured as a firm-fixed-price contract with a final delivery deadline of March 20, 2027. The scope of work requires a certified API 653 inspector to conduct external inspections, visual assessments of containment areas, and verification of alarms and Automatic Tank Gauge equipment. Deliverables include a teleconference kick-off meeting, completed API Std 653 checklists, and the submission of draft and final reports that identify any appurtenances not complying with DoD Standard AW 78-24-27. The government will award the contract to the responsible offeror deemed most advantageous based on technical capability, experience, and price reasonableness. Proposals must be submitted as a single PDF not exceeding five pages, excluding the cover page, price worksheet, and certifications. Required submission materials include the inspector's certification, a one-page resume, and past performance references. Due to the work being performed on a closed military installation, all personnel must undergo identity proofing and vetting unless they possess a current government security clearance. Quotes must be submitted electronically to Contracting Specialist Tony Manna and Contracting Officer Brent Bertrand by the response deadline of November 13, 2026.
All Other Professional, Scientific, and Technical Services

POSTED

about 7 hours ago

DEADLINE

in 15 days
View Details
NAICS: 541330
New
Federal
USACE Omaha District - $249M Unrestricted Sentinel Construction Management Services (CMS) MATOC
Solicitation # W9128F26RA124
The USACE Omaha District is soliciting proposals for the Sentinel Construction Management Services (CMS) Multiple Award Task Order Contract (MATOC) under NAICS 541330. This unrestricted effort has a total estimated capacity of 249 million dollars, with the government intending to award four firm-fixed price Indefinite Delivery Contracts (IDCs). The contract supports the U.S. Air Force across the Northwestern Division, covering 15 states including Washington, Oregon, Idaho, Nevada, Utah, Montana, Wyoming, Colorado, North Dakota, South Dakota, Nebraska, Kansas, Iowa, Missouri, Minnesota, and Wisconsin. The performance period consists of a five-year base period with options extending the total duration up to seven years and six months. The scope of work involves providing professional, administrative, and management staff augmentation to oversee construction projects. Key responsibilities include performing Quality Assurance inspections per ER 1180-1-6, monitoring safety compliance according to EM 385-1-1, and managing project documentation through the Resident Management System or Construction Management Platform. Awards will be based on a best-value tradeoff process evaluating past performance, technical and management approach, key personnel resumes, small business participation, and cost. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 10, 2026.
Engineering Services

POSTED

2 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2 project is a construction effort located along the left descending bank of Lake Sharpe near Big Bend, South Dakota. Managed by the USACE Omaha District, the project focuses on Reach 4 of the lake and involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and a 200-by-1,500-foot island in water up to three feet deep. Key technical requirements include the installation of a riprap revetment to protect against erosion and the planting of cottonwood trees and other culturally significant vegetation. These efforts are designed to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland through tasks such as earth moving, grading, bank shaping, and topsoil placement. This procurement is a 100 percent Small Business Set-Aside under NAICS code 237990, with an estimated construction value between 10 million and 25 million dollars. The project is being solicited as a single-step sealed bidding process via an Invitation for Bid, with a required period of performance of 550 days following the Notice to Proceed. Bidders must be registered in the System for Award Management and submit their offers through the PIEE Solicitation Module. Additional requirements include the provision of performance and payment bonds and adherence to South Dakota Heavy and Highway wage determinations, with a specific note regarding a 4.5 percent Tribal Employment Rights Ordinance tax.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541990
New
Federal
Vandenberg SFB Tank Inspection
Solicitation # W9128F27QA002
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract for the inspection of Department of Defense fuel tanks at Vandenberg SFB, California. This 100 percent Service-Disabled Veteran-Owned Small Business set-aside under NAICS 541990 requires the contractor to perform API 653 internal inspections on aboveground storage tanks, specifically focusing on Tank 1702, a welded steel vertical Jet A storage tank. The scope of work includes fuel removal, disposal, tank cleaning, and the replacement of wiper seals. Contractors must provide a certified API 653 inspector and a project manager to ensure compliance with API 650, API 653, NFPA 30, and various Unified Facilities Criteria and military standards. The government will award the contract based on best value, evaluating technical capability, relevant experience in fuel tank draining and cleaning, and price reasonableness. Proposals are limited to five pages and must be submitted electronically by November 13, 2026. Key deliverables include draft and final inspection reports featuring non-destructive testing summaries, engineering calculations, and categorized repair recommendations. Due to the location on a military installation, all personnel must adhere to strict security vetting and base access requirements. The contract also includes an option for the removal and disposal of excess fuel up to 2,000 gallons per purchase order.
All Other Professional, Scientific, and Technical Services

POSTED

3 days ago

DEADLINE

in 15 days
View Details
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
Oil and Gas Pipeline and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS