Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on June 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fabrication of Carriage and Weight Components

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves the fabrication of modular carriage and weight components that are specifically designed without lead, ensuring compliance with military-grade standards for durability, safety, and packaging. These components are intended for use in drop tower systems, which require reliable and robust parts to meet stringent operational demands. The work will be performed at Wright Patterson Air Force Base, highlighting its significance within a defense context. Issued by the Department of Defense under NAICS code 332312, the contract is categorized as a subcontract and does not specify any set-aside requirements. The solicitation was posted on June 2, 2026, with a response deadline of July 1, 2026. The contract underscores the emphasis on high-quality manufacturing tailored for military applications, ensuring that the final products meet rigorous standards necessary for integration into advanced testing or operational systems.

General Info

Fabrication of lead-free modular carriage components for military drop tower use at Wright Patterson AFB.

Agency

Department Of Defense → FA9101 Aedc Pkp Procrmnt BranchView Agency

NAICS

332312 - Fabricated Structural Metal ManufacturingView NAICS

Place of Performance

Wright Patterson AFB, OH, USA

Set-Aside

NONE

Documents

This scope was carved out of FA910126RWP_LGTFDropTower.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Request for White Paper_Landing Gear Test Facility (LGTF) Drop Tower Modernization Prototype Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9101 Aedc Pkp Procrmnt Branch
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabrication of modular, non-lead carriage and weight components meeting military-grade durability, safety, and packaging standards for integration into drop tower systems.

More opportunities from Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch

Same awarding agency

NAICS: 541330
New
Federal
Request for Whitepaper - AEDC Facility Digital Twins and Predictive Analytics
Solicitation # FA910126RWP-DigitalTwins
The Department of the Air Force is seeking innovative solutions through a Request for Whitepapers to establish an Other Transaction Agreement under 10 U.S.C. 4022 for the Arnold Engineering Development Complex (AEDC). The primary objective is to modernize facility documentation by creating high-fidelity, as-built 3D digital twins and predictive analytics for critical test infrastructure. The program begins in Fiscal Year 2027 with an initial prototype phase focusing on the Von Karman Gas Dynamics Facility, covering approximately 260,000 square feet of footprint and 1,040,000 square feet of scan area, with plans to eventually scale to over 2.5 million square feet across the complex. Technical requirements specify engineering-grade models with a minimum Level of Detail (LOD) 350, though LOD 400 is highly desired for primary connection points. Deliverables must maintain a dimensional accuracy of +/- 1/4 inch, globally referenced to project survey control, and utilize Autodesk Revit for architectural/structural models and Autodesk Plant PDM for intelligent process models. All work must be performed within the continental United States, and performers must comply with strict cybersecurity standards, including NIST SP 800-171 and CMMC Level 2 self-assessment. The agreement is not a standard procurement contract and is not subject to the Federal Acquisition Regulation. Instead, it utilizes a milestone-based, firm-fixed price structure for the base phase. Evaluation of submissions will be based on technical merit, innovation, program management, and risk. Eligible participants must certify as small businesses or nontraditional defense contractors. The submission deadline for whitepapers is October 8, 2026, and a site visit is scheduled for September 30, 2026.
Engineering Services

POSTED

2 days ago

DEADLINE

in 26 days
View Details
NAICS: 541330
New
Federal
RWP Independent Air Supply
Solicitation # FA9101269IAS
The Arnold Engineering Development Complex at Arnold Air Force Base, Tennessee, is seeking white papers for the Independent Air Supply project under the authority of 10 U.S.C. section 4022. The objective is to establish a secondary, dedicated, and conditioned air supply for an existing test cell. The scope of work includes the demolition of existing equipment and the design, procurement, fabrication, and installation of a system featuring at least four modular compressor units, dryers, heaters, expansion turbines, and a final mixing chamber. The system must integrate with base utilities and utilize a local control network featuring Emerson RX3i PLCs, Proficy Machine Edition programming, and a Simplicity HMI interface capable of supporting simultaneous unclassified and classified operations. The government may award up to two prototype agreements, with a preference for base milestone pricing around 250,000 dollars, though this is not a strict ceiling. All final engineering drawings and analyses must be stamped by a Professional Engineer licensed in Tennessee, and air purity must comply with ISO 8573-1 Class 1P. Evaluation of submissions will involve a go/no-go compliance check followed by a qualitative review of technical capability, schedule feasibility, and cost realism. The submission deadline for white papers has been extended to September 23, 2026. Interested parties must verify their CAGE code, Joint Certification Program, and CMMC status to access export-controlled Distribution D documents.
Engineering Services

POSTED

4 days ago

DEADLINE

in 11 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS