Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Energy was posted on February 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fabrication of edge-welded bellows

Closed
377904-RKFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332919
New
Federal
48--MANIFOLD ASSEMBLY - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF
Solicitation # N0010426QTB33
Solicitation N00104-26-Q-TB33, issued by NAVSUP Weapon Systems Support Mechanicsburg, is a request for quotations for the teardown, evaluation, and repair of Manifold Assemblies, specifically NIINs 012858164 and 012858172. The government requires a Repair Turnaround Time (RTAT) of 250 days, measured from the physical receipt of the asset to final government acceptance. Failure to meet this RTAT may result in per-unit monthly price reductions. The contract mandates Government Source Inspection (GSI) and requires that all repair work be performed according to original manufacturer specifications and drawings. All freight is FOB Origin and handled by the Navy via the Commercial Asset Visibility system. The government intends to make a single award based on the most advantageous offer, with past performance weighted as more important than price. Evaluation will utilize the Supplier Performance Risk System to assess item, price, and supplier risk. Offerors must be authorized distributors of the original manufacturer and provide signed proof of authorization on company letterhead. Technical requirements include strict adherence to MIL-STD-129 for marking, MIL-STD-130 for unique identification, and a total prohibition of metallic mercury contamination. The final deadline for offer submission is November 20, 2026, at 4:30 PM local time.
Navsup Weapon Systems Support Mech

POSTED

about 15 hours ago

DEADLINE

in 18 days
NAICS: 332919
New
Federal
SEAT-VL URETHANE
Solicitation # N0010426QNE45
Solicitation N0010426QNE45, issued by NAVSUP Weapon Systems Support Mechanicsburg, seeks quotes for the procurement of Seat-VL Urethane (NSN 4820-00-054-3850). This requirement is a total small business set-aside and is subject to Emergency Acquisition Flexibilities and a DO priority rating for national defense. The material is designated as Special Emphasis Level I Scope of Certification material because it is used in crucial shipboard systems where failure could result in catastrophic loss of life or vessel. Consequently, the contract mandates strict quality controls, including a one-year warranty from the date of delivery, adherence to ISO 9001 and ISO 10012 standards, and a prohibition on mercury contamination. The technical specifications require the seats to be manufactured from MD71-GG Mearthane (Graphite Filled Urethane) by Mearthane Products Inc., meeting specific hardness, tensile strength, and water absorption values. Deliverables include a certificate of compliance and material certification test reports submitted via Wide Area Workflow (WAWF). Award will be made to a single responsible offeror based on a determination of the most advantageous offer, with past performance weighted as more important than price. The solicitation close date has been extended to December 7, 2026, and the resulting award will be issued bilaterally, requiring written acceptance from the contractor.
Navsup Weapon Systems Support Mech

POSTED

about 15 hours ago

DEADLINE

in about 1 month
NAICS: 332919
New
DIBBS
DISK, VALVE
Solicitation # SPE7M1-27-T-1837
Solicitation SPE7M1-27-T-1837 is a small business set-aside request for quotation issued by the DLA Weapons Support Maritime Supply Chain for the procurement of two valve disks, identified by NSN 4820-01-573-5942. The items must be manufactured using a metal casting process requiring specific tooling and must adhere to basic drawing 80064 2177917, Revision P. Delivery is required at DLA Dist San Joaquin in Tracy, California, with a need ship date of January 19, 2027, and an original required delivery date of June 16, 2027. The procurement is subject to destination inspection and acceptance per FAR 52.246-2, with invoicing and payment processed through the Wide Area WorkFlow system. This contract contains strict export control requirements under ITAR and EAR, necessitating that contractors possess an approved US/Canada Joint Certification Program certification and complete specific DLA export-control training to access technical data. Compliance with various federal and defense regulations is mandatory, including the Buy American Act, the Berry Amendment, and DFARS 252.204-7012 for safeguarding covered defense information. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, while hazardous materials must be labeled according to the Hazard Communication Standard. A price evaluation preference is available for HUBZone Small Business Concerns, and the solicitation may be eligible for automated award.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN

POSTED

1 day ago

DEADLINE

in 4 days

General Info

NAICS

332919 - Other Metal Valve and Pipe Fitting Manufacturing

Place of Performance

IL, 60510, USA

Set-Aside

NONE

Documents

9
PDF, High priority: read this first4 pages · amendment
High
PDF, High priority: read this first16 pages · procurement-and-fabrication-specification
High
PDF, High priority: read this firstsubcontracting-plan
High
PDF, High priority: read this firstsarc
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this firstproposal-certifications
High
PDF, High priority: read this first12 pages · proposal-certifications
High
DOCX, High priority: read this first1 page · rfp
High
PDF, High priority: read this first11 pages · rfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
Contacts1 person available
OfficeBatavia, IL, 60510, USA

Full Description

Show more

Fermi National Accelerator Laboratory (Fermilab or FNAL), managed and operated by Fermi Forward Discovery Group, LLC (FFDG) under the prime contract with the U.S. Department of Energy (DOE), is seeking to subcontract for the fabrication, assembly, testing, and delivery of PIP-II SSR2 Edge-welded bellows, in accordance with the requirements set forth in this Request for Proposal (RFP), the Statement of Work (SOW), Drawings any and all specifications .

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 23822
New
Federal
PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Solicitation # 378854_MR
Fermi Forward Discovery Group, LLC (FFDG) is soliciting proposals for the fabrication and installation of a Low Conductivity Water (LCW) Piping System in the F-37 Building pump room at the Fermi National Accelerator Laboratory (Fermilab) in Batavia, Illinois. This firm-fixed-price project, part of the Proton Improvement Plan II (PIP-II), involves installing two 50 hp centrifugal pumps, a shell and tube heat exchanger, a 250-gallon expansion reservoir tank, and various process loop equipment including a deionization skid, particulate filter, and dissolved oxygen removal skid. The scope also encompasses the supply and installation of all piping hardware, process instrumentation, structural supports, foundation bases, and electrical components. The work must be completed within 180 calendar days from the Notice-to-Proceed and must adhere to ASME B31.3, B31.9, and FESHM standards. Proposals are due by December 3, 2026, at 2:00 p.m. CDT and must be submitted in two separate volumes: a technical proposal and a business/price proposal. Technical acceptability is based on a lowest price-technically acceptable selection method, requiring offerors to demonstrate at least ten years of business experience or have key personnel with ten years of experience in similar roles. Bidders must provide a bid guarantee of at least 20 percent of the bid price, capped at 3 million dollars, and will be required to furnish performance and payment bonds upon award. Due to the secured nature of the DOE site, all personnel must be U.S. citizens with a REAL ID and submit access requests at least seven days prior to site visits. Compliance with the Davis-Bacon Act, the Buy American Act, and strict Fermilab Environmental, Health, and Safety (FESHM) protocols is mandatory.

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 237130
Federal
KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS
Solicitation # RFP-383167-CD
Fermi Forward Discovery Group, LLC is soliciting proposals for the reconstruction and renovation of the Kautz Road Substation (KRS), designated as UIP subproject SP-2, at the Fermi National Accelerator Laboratory in Batavia, Illinois. This firm-fixed-price subcontract involves comprehensive demolition, building expansion, and the installation of low and medium voltage power systems, including 345kV substation yard equipment and a new prefabricated control house. The project is subject to a critical schedule constraint tied to the Fermilab accelerator shutdown, with on-site construction anticipated to occur between January 1, 2028, and January 1, 2030, with a final project completion deadline of September 30, 2029. The selection process utilizes a best-value tradeoff method where technical factors, including organizational structure, safety compliance, and past performance on high-voltage substation projects, are significantly more important than price. Offerors must meet strict pass/fail thresholds regarding financial capability, such as a current ratio of 1.10 or greater and an aggregate bonding capacity of at least 30 million dollars, as well as rigorous safety performance metrics. The contract mandates compliance with the Davis-Bacon Act for prevailing wages, various FAR and DEAR flow-down provisions, and specific federal anti-discrimination laws. Key milestones include the completion of submittals within 60 days of the Notice to Proceed and the formal issuance of the Authorization for Use and Possession by July 2, 2029.
Power and Communication Line and Related Structures Construction

POSTED

9 days ago

DEADLINE

in about 1 month
View Details
NAICS: 332999
Federal
WFE Solenoid/Corrector Magnet Spares
Solicitation # 389116swk
Fermilab, managed by the Fermi Forward Discovery Group, LLC for the U.S. Department of Energy, is soliciting proposals for the procurement of two solenoid magnets with integrated dipole correctors. This solicitation, number 389116swk, utilizes a best value trade-off source selection process where technical capabilities, infrastructure, and past experience are weighted as significantly more important than price. Proposals are due by 5pm Central on December 9, 2026, with a deadline for questions set for November 30, 2026. The selected subcontractor must provide a detailed Gantt chart, evidence of in-house manufacturing and magnetic testing capabilities, and a history of three similar contracts completed within the last five years. The scope of work requires strict adherence to ASME B31.3 welding and brazing standards and FNAL guidelines. Key deliverables include the hardware and associated material certifications for copper, epoxy, and steel. Acceptance is contingent upon Factory Acceptance Tests conducted at the subcontractor's facility, with specific requirements for field homogeneity and pressure testing. Shipping must be F.O.B. Fermilab in a single batch, utilizing crates equipped with irreversible shock indicators recording loads exceeding 10 G. All units must feature unique serial numbers and specific lead markings to ensure traceability and correct polarity.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

9 days ago

DEADLINE

in 26 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS