Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Energy was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fermilab-Mu2e Asphalt Pad- 379050_DG

Closed
379050_DGFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The subcontractor is required to construct an asphalt pad at Fermilab in Batavia, Illinois, as detailed in Exhibit A, encompassing the removal of existing gravel, installation of a new electrical grounding loop, and full pavement construction. All work must adhere to project drawings, specifications including Section 010010, 013100, and 013300, and industry standards such as NFPA 70E, OSHA 29 CFR, ANSI, and ASME, while ensuring protection of adjacent site features. Performance is to be completed within 60 calendar days from receipt of the Notice to Proceed, with inspections and final acceptance occurring on-site by the FFDG Construction Coordinator after resolution of all punch list items documented via Attachment B and submission of as-built drawings, test reports, and warranties. The contract is firm fixed price under a lowest price technically acceptable evaluation, with proposals judged on corporate capabilities, past experience with similar projects, and key personnel qualifications using binary acceptable/unacceptable ratings; any single unacceptable sub-factor disqualifies the proposal. Compliance with labor standards is mandatory, including Davis-Bacon wage requirements as specified in the applicable wage determination, and adherence to FAR clauses covering payroll records, apprenticeships, convict labor, paid sick leave, and subcontractor labor standards. The subcontractor must provide a 100% payment bond, maintain an approved safety and health program, comply with radiological safety protocols including dosimetry and pre-approval of radioactive equipment, and prohibit foreign nationals from designated countries without prior DOE approval. Cybersecurity obligations under FAR 52.204-21 apply if federal contract information is handled, and prohibited vendors such as Kaspersky Lab are excluded. All personnel require personal identity verification, and government property may not be removed without approval. Proposals must be emailed by 3:00 PM CDT on May 28, 2026, and include technical documentation on capabilities and experience, key personnel resumes, safety and quality plans, and completed certifications through the SARC and PUR-466 forms, with active SAM registration and UEI required but not provided in the submission. No contract value is specified, but pricing is subject to evaluation under LPTA criteria, and failure to submit complete, timely, and fully compliant documentation will result in rejection.

General Info

Subcontractor must complete Mu2e Asphalt Pad project in Batavia with safety, quality, and full responsibilities.

Agency

Department Of Energy → Fermilab - DOE ContractorView Agency

NAICS

324121 - Asphalt Paving Mixture and Block ManufacturingView NAICS

Place of Performance

Batavia, IL, 60510, USA

Set-Aside

NONE

Documents

(17)

Exhibit C 010010 General Requirements Mu2e Asphalt Pad

PDFsow

Fermilab Subcontractor Safety Information Questionnaire

PDFsafety-questionnaire

Exhibit L - Subcontractor Annual Representations & Certifications Rev 7

PDFsarc

Exhibit F 014100 Quality Requirements - QC Plan Not Required

PDFquality-requirements

RFP ISD_379050 Price Proposal Form for Mu2e Asphalt Pad

PDFprice-proposal-form

Exhibit H 2025 Construction Insurance Requirements

PDFinsurance-requirements

Exhibit+N_Bid+Bond+FL-41.pdf

PDF

Exhibit+O_+Payment+BondFL-42.pdf

PDF

RFP 379050 Mu2e Asphalt Pad

PDFrfp

FFD General Terms and Conditions for Construction (08.2025)

PDFcontract-document

Illinois DBA Wage Determination IL20260008 Mod 1

PDFwage-determination

Mu2e Asphalt Pad Construction Statement of Work Revision 0

PDFsow

Drawing No. 6-10-35 C-2 Rev. 0 - Mu2e Asphalt Pad Existing Photos

PDFdrawings

Exhibit+I_SF1413-23a+%281%29.pdf

PDF

013100 Environment, Safety, and Health Requirements April 2025

PDFsow

PUR-466 Proposal Certifications Revision 5 10/14/2025

PDFproposal-certifications

Exhibit E 013300 Submittals FermiForward

PDFsow

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
Contacts1 person available
OfficeBatavia, IL, 60510, USA
Organization / Agency
Department Of Energy → Fermilab - DOE Contractor
View Agency Profile
Office AddressBatavia, IL, 60510, USA

Full Description

Show more

The Subcontractor shall perform all work as described in the Statement of Work for the Mu2e Asphalt Pad included as Exhibit A.  All work shall include transportation, overhead, bonding costs, insurance, safety oversight, quality control oversight, and supervision as required to construct the project described in the scope of work, and the detailed description contained herein.

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 236220
New
Federal
MINOS High Bay Roof Replacement & Masonry Wall Repair
Solicitation # ISD_384202_DA
Fermi Forward Discovery Group, LLC is soliciting proposals for a firm fixed price subcontract to perform the removal and replacement of one high bay roof and masonry wall repairs at the MINOS Service Building located at the Fermi National Accelerator Laboratory in Batavia, Illinois. The scope of work is divided into two phases, featuring the installation of a Sika Sarnafil adhered PVC roofing system meeting FM RoofNav requirements and extensive masonry repairs including tuckpointing, brick replacement, and coping stone restoration. This is a total small business set-aside under NAICS code 236220. Proposals are due by 5:00 PM CT on October 6, 2026, and must be submitted in two separate volumes: a technical proposal and a business management and price proposal. The award will be based on a competitive best value with tradeoffs, prioritizing technical criteria over price. Evaluation factors include project approach, safety compliance, past performance—specifically requiring three Sarnafil adhered PVC projects within the last five years—and organizational structure. Key requirements for the selected subcontractor include providing performance and payment bonds, adhering to Davis-Bacon wage standards, and maintaining specific insurance coverages. Additionally, the contractor must comply with the Buy American Act and strict site safety protocols, including the submission of OSHA 300 logs and ES&H certifications. Site visits were scheduled for September 9 and September 16, 2026, to facilitate accurate bidding.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 24 days
View Details
NAICS: 541380
New
Federal
RFP For PORTABLE PHASED ARRAY ULTRASONIC FLAW DETECTOR FOR NDT INSPECTION
Solicitation # RFP386950
Fermi Forward Discovery Group, LLC (FFDG) has issued Request for Proposal RFP 386950 for the procurement of one portable phased array ultrasonic flaw detector for non-destructive testing (NDT) inspection of welds at the Fermi National Accelerator Laboratory (Fermilab). This is a firm-fixed-price subcontract opportunity with a submission deadline of September 21, 2026. The award will be based on a best value source selection, specifically the lowest price from technically acceptable and responsible offerors. The equipment must be genuine, new, and unused, with delivery terms specified as F.O.B. Fermilab to the Receiving Warehouse 2 in Batavia, Illinois, including all freight charges in the quotation. The subcontract is governed by the FFDG General Terms and Conditions for Commercial Products and Commercial Services (08.2025) and incorporates various Federal Acquisition Regulation (FAR) and Department of Energy Acquisition Regulation (DEAR) clauses. Key requirements include compliance with the Buy American Act, whistleblower protections, and workplace substance abuse programs. Offerors must submit a completed RFP page along with the Subcontractor Annual Representations and Certifications (SARC) and the PUR-466 Proposal Certifications. All contractual inquiries and submissions are directed to Procurement Specialist Patrick Tarpey.
Testing Laboratories and Services

POSTED

3 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS