Fiber Optic Spring Hill Drive - 112251

Active
26-C01376State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of Public Works for the State of Florida has issued solicitation 26-C01376 for the Fiber Optic Spring Hill Drive project. The selected contractor will be responsible for providing all necessary labor, materials, equipment, and supervision to replace the fiber optic infrastructure from Coronado Drive west to Barclay Avenue. The scope of work encompasses the removal, installation, testing, documentation, and restoration of the fiber optic systems. This project is managed by the Florida SLED organization with the primary point of contact being Signal Project Manager Jon Sanchez. Interested parties must submit their responses by the deadline of September 14, 2026. The performance of the contract will take place within the state of Florida, specifically associated with the office located in Brooksville.

General Info

Florida DPW solicitation 26-C01376 for Spring Hill Drive fiber optic replacement by September 14, 2026.

Agency

Florida → Department of Public WorksView Agency

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

(6)

Hernando County 2026 Holiday Schedule

PDFholiday-schedule

Sample_Construction_Contract_26-C01376.pdf

PDF

SHD_FO_Replacement_Map.pdf

PDF

Fiber Optic Spring Hill Drive - 112251.pdf

PDF

Performance and Payment Bond and Construction Coordination Documents - Hernando County

PDFcontract-document

Tabualtion_Scope.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Department of Public Works
Contacts2 people available
OfficeBrooksville, FL, 34604, USA
Organization / Agency
Florida → Department of Public Works
View Agency Profile
Office AddressBrooksville, FL, 34604, USA
Contacts
Jon SanchezSignal Project Manager
Joe GoulartContracting Agent II

Interested Companies (17)

Show more
X Fiber Infrastructure
Wcdel
Stuart, FL
Bear Environmental Consulting
Inglis, FL

See All 17 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Contractor shall furnish all labor, materials, equipment, supervision, and incidentals required to complete the Spring Hill Dr fiber optic (FO) Replacement from Coronado Dr west to Barclay Ave., project as identified in the budgetary tabulations. Work shall include the removal, installation, testing, documentation, and restoration associated with the fiber optic infrastructure improvements.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Federal
Feeder 7 Repair
Solicitation # W50S8526BA007
The U.S. Air Force, through the W7NF Uspfo Activity Miang 127, is preparing to issue an Invitation for Bids under solicitation number W50S85-26-B-A007 for the construction of Electrical Repair Feeder 7 at Selfridge Air National Guard Base in Michigan. This is a firm fixed-price contract entirely set aside for small businesses under FAR 19.5, with the NAICS code 237130 for Power and Communication Line and Related Structures, and a size standard of $45 million. The project requires the contractor to furnish all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary to complete approximately 5,706 feet of new underground and overhead conductors, demolition of existing cables, full-depth pavement repairs, mill/overlay, crack repairs, and associated site restoration work along Perimeter Road and Jefferson Ave. All work must strictly adhere to Drawings VGLZ262005 Repair Feeder #7, the Statement of Work, and project specifications, with any conflicts resolved in favor of the more stringent or higher-quality requirement. A Macomb County Soil Erosion Permit is mandatory and the responsibility of the contractor to obtain and pay for. The contract period is 240 calendar days from notice to proceed, inclusive of inspection and punch list items. The solicitation is being issued under FAR Part 14 procedures, with award determined solely on price and price-related factors. The prime contractor must comply with limitations on subcontracting, prohibiting payments exceeding 85 percent of the contract value (excluding materials) to non-similarly situated subcontractors under FAR clause 52.219-14(e)(3) with deviation 2021-O0008. All bidders must be registered in SAM.gov, and inquiries must be submitted in writing via email to TSgt Jack Garrettson. The formal solicitation is tentatively scheduled for release on July 13, 2026, with a pre-bid conference on July 22, 2026, and bid opening anticipated on or about August 31, 2026. The estimated contract value ranges between $1 million and $5 million, with the final amount to be determined upon bid submission.
W7NF Uspfo Activity Miang 127

POSTED

1 day ago

DEADLINE

in 23 days
View Details
NAICS: 237130
New
Federal
Request for Information - Sentinel Utility Infrastructure, Malmstrom Air Force Base, MT
Solicitation # W912DW26S1CE0
The U.S. Army Corps of Engineers, Seattle District, is issuing this Request for Information to gather market intelligence for the Sentinel Utility Infrastructure Project at Malmstrom Air Force Base, Montana. This critical enabling project supports the modernization of the land-based intercontinental ballistic missile force by constructing a comprehensive utilities distribution system, including electrical distribution and substation expansion, water and wastewater systems, natural gas service, and a fiber-optic telecommunications backbone. The scope also includes associated site work such as grading, drainage, and access paving. The project is estimated to cost between 160 million and 200 million dollars with an anticipated period of performance of approximately 1,278 calendar days. Because this infrastructure is on the critical path for the overall Sentinel beddown, any schedule delays will impact all subsequent facility construction. The government intends to utilize Other Transaction Authority under 10 U.S.C. section 2808a, meaning the agreement will not be subject to the Federal Acquisition Regulation or standard small-business set-aside rules. The proposed acquisition strategy employs a Construction Management at Risk approach divided into two phases: a preconstruction collaborative phase for constructability reviews and cost development, followed by an at-risk construction phase based on a negotiated Guaranteed Maximum Price. Design is nearly complete and is being managed by Jacobs Engineering, who will remain the Designer of Record. Interested parties must respond via an online questionnaire and may submit a supplemental capabilities statement of no more than five pages to Kyla Couch by 10:00 AM Pacific Time on August 28, 2026. Selection will be based on a trade-off process evaluating qualifications, past performance, proposed approach, commercial terms, and price.
W071 Endist Seattle

POSTED

2 days ago

DEADLINE

in 12 days
View Details

More opportunities from Florida → Department of Public Works

Same awarding agency