Field Painting of Metal Structures
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves the surface preparation and field painting of existing metal bridge components and guardrails under the West Virginia Department of Transportation. The work requires thorough cleaning, rust removal, and application of protective coatings to ensure structural integrity and longevity of the metal infrastructure. All activities must be performed on-site at the specified location in Clay, West Virginia, with strict adherence to industry standards for surface preparation and paint application to meet durability and safety requirements. This subcontract is open for bids with a posted date and response deadline both listed as August 11, 2026, indicating a future solicitation cycle. The North American Industry Classification System code 238290 identifies the work under other heavy and civil engineering construction specialties, emphasizing its placement within specialized infrastructure maintenance. The contract does not include set-aside designations, and no point of contact details are provided, leaving bidders to rely on the published UI link for submission details and further instructions.
General Info
Agency
NAICS
Place of Performance
Clay, WV, USSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
