This Government Contract opportunity from California was posted on May 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fire Protection System Testing and Certification

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541380
New
Federal
Aeration Blower and Silencer Vibration and Shock Fixture Fabrication
Solicitation # N6660426Q0459
Solicitation N66604-26-Q-0459 is a firm-fixed-price request for quotes from the Naval Undersea Warfare Center Division, Newport, for the fabrication and assembly of two specific test fixtures: one CHT Aeration Blower Fixture Assembly and one Discharge Silencer Fixture Assembly. The contractor is responsible for procuring materials, including copper-nickel piping, and performing welding and assembly to replicate a shipboard environment in accordance with Mil-DTL-901E and Mil-Std-167A. The work will be performed at the contractor's facility and at NUWCDIVNPT, where the contractor must provide on-site technical personnel to support government-executed fitment evaluations. Key deliverables include a Fabrication and Inspection Report due within five business days of assembly completion and a final Summary Report detailing fabrication and fitment testing. The desired delivery date for the assemblies is January 15, 2027, with delivery terms set as FOB Destination, Newport, RI. Award is based on the lowest price technically acceptable, with the government reviewing past performance via the Supplier Performance Risk System. Offerors must be registered in SAM, provide a CAGE code for drawing access, and achieve CMMC Level 2 (Self) certification prior to award. Quotes are due by September 11, 2026, and must include all shipping costs within the unit price.
Nuwc Division Newport

POSTED

about 13 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The contract involves performing hydrostatic and flow testing, commissioning, and certification of the entire fire protection system to ensure it meets the standards set by the National Fire Protection Association (NFPA) as well as local regulations. This comprehensive scope of work aims to achieve final acceptance of the system, confirming its operational readiness and compliance with safety codes. Issued by the City of Oxnard, California, this subcontract opportunity falls under NAICS code 541380, which pertains to testing services. The solicitation was posted on May 19, 2026, with a response deadline of June 10, 2026. While specific location details and points of contact are not provided, interested parties can access further information through the designated public procurement platform. This contract is crucial for verifying the fire protection system's integrity and functionality before its ultimate approval.

General Info

Perform hydrostatic, flow testing, commissioning, certification of fire protection system per NFPA standards.

Agency

California → City of OxnardView Agency

NAICS

541380 - Testing Laboratories and ServicesView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of PW 26-73.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Fire Suppression Repairs at Water Yard Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Oxnard
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Oxnard
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Hydrostatic and flow testing, commissioning, and certification of the entire fire protection system to ensure compliance with NFPA and local codes for final acceptance.

More opportunities from California → City of Oxnard

Same awarding agency

NAICS: 238210
SLED
South Oxnard Center Lighting Project
Solicitation # PW 25-90
The City of Oxnard is soliciting bids for the South Oxnard Center Lighting Project, Specification No. PW 25-90, located at 200 Bard Road, Oxnard, California. The project requires a licensed California Class C-10 Electrical Contractor or Class A General Engineering Contractor to provide all labor, materials, and equipment to remove existing lighting systems and install new fixtures, lamps, poles, foundations, wiring, conduit, and lighting controls, including all associated electrical work and surface restoration. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price. All work must be completed within 120 working days following the issuance of the Notice to Proceed, with liquidated damages set at 250 dollars per day for delays. Bids must be submitted electronically via the PlanetBids portal by 2:00 PM on September 15, 2026. A physical bid security of 10 percent of the total bid price must be delivered to the Oxnard City Clerk's office by the same deadline. Mandatory requirements for bidders include registration with the Department of Industrial Relations to perform public work and the possession of a current City business license at the time of award. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price, with the performance bond including a one-year warranty period. Additionally, the City will withhold five percent of progress payments as retention, and all labor must comply with California prevailing wage laws.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 1 month ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS