This Solicitation opportunity from Arizona was posted on October 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Phoenix is soliciting bids for the construction of Fire Station No. 7, a design-bid-build project funded by the 2023 General Obligation Bond Program. Located on a 1.6-acre site at 8907 N. 3rd Street, the project involves the development of a two-story, 18,000 gross square foot facility featuring four apparatus bays, 16 dormitories, a whole station generator, and an above-ground diesel fuel island. The scope includes comprehensive site development, including parking, hardscape, landscape, irrigation, and security lighting, all designed to blend with the surrounding community. The anticipated construction cost is approximately 12 million dollars, with a required completion timeline of 450 calendar days from the Notice to Proceed.
Bids must be submitted as sealed proposals to the Design and Construction Procurement Bid Box at Phoenix City Hall. Key submission requirements include registration in the City's Vendor Management System, a proposal guarantee of at least 10 percent of the bid amount, and the disclosure of all subcontractors providing work equal to or greater than 5 percent of the base bid. The project establishes a Small Business Enterprise goal of 13 percent. Award will typically be granted to the lowest responsive and responsible bidder. The successful contractor must provide performance and labor and material bonds for the full contract amount and adhere to Maricopa Association of Governments' Uniform Standard Specifications and City of Phoenix Supplements.
General Info
City of Phoenix seeks bids for 12 million dollar Fire Station 7 construction.
HighAI Summary for ADDENDUM 1 FS7 DBB: This document is Addendum 1 for procurement FS7 DBB. The provided content is minimal and does not contain specific technical changes, but as an addendum to a solicitation, it serves to modify the original procurement terms.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 4 FS7 DBB Full Size Drawings: This document is Addendum 4, providing full-size technical drawings and specifications for project FS7. It includes general notes referencing ASHRAE standards, floor plan scales for quadrants A through F, and a detailed phone key station outlet list.
PDF
PDF, High priority: read this first2 pages · ifb
HighAI Summary for City of Phoenix Fire Station 7 GO Bond - Design-Bid-Build: Call for Bids (IFB) issued by the City of Phoenix for the construction of Fire Station 7. The project involves a two-story, 18,000 sq ft facility with four apparatus bays and 16 dormitories, funded by the 2023 General Obligation Bond Program with an estimated cost of $12 million. Bids are due October 13, 2026, at 2:00 pm. A Small Business Enterprise goal of 13% is established.
PDF
PDF, High priority: read this firstifb
HighAI Summary for City of Phoenix Fire Station 7 - GO Bond Design-Bid-Build: Invitation for Bids (IFB) for the construction of Fire Station No. 7 in Phoenix, AZ. The project involves a two-story, 18,000 sq ft facility with four apparatus bays, 16 dormitories, and site development. Funded by the 2023 General Obligation Bond Program with an estimated cost of $12,000,000. Bids are due October 27, 2026, at 2:00 pm. Includes a 13% Small Business Enterprise goal.
PDF
PDF, High priority: read this first2 pages · ifb
HighAI Summary for FD57100030 - Fire Station 7 Design-Bid-Build: Invitation for Bids (IFB) issued by the City of Phoenix for the construction of Fire Station No. 7. The project involves a two-story, 18,000 sq ft facility with four apparatus bays, funded by the 2023 General Obligation Bond Program with an estimated cost of $12,000,000. Bids are due October 13, 2026, at 2:00 pm. A Small Business Enterprise goal of 13% is established.
PDF
PDF, High priority: read this first78 pages · ifb
HighAI Summary for FD57100030 - Fire Station 7 – GO Bond: Invitation for Bids (IFB) issued by the City of Phoenix for the construction of Fire Station No. 7. The project involves a two-story, 18,000 sq ft facility with four apparatus bays, dormitories, and site development on a 1.6-acre lot. Bids are due Tuesday, October 13, 2026, at 2:00 P.M. The document includes the call for bids, scope of work, SBE goals (13%), and instructions for bidders.
PDF
PDF, High priority: read this first2 pages · ifb
HighAI Summary for FD57100030 - Fire Station 7 GO Bond Design-Bid-Build: Invitation for Bids (IFB) issued by the City of Phoenix for the construction of Fire Station No. 7. The project involves a two-story, 18,000 sq ft facility with four apparatus bays and 16 dormitories, funded by the 2023 General Obligation Bond Program with an estimated cost of $12,000,000. Bids are due Tuesday, October 13, 2026, at 2:00 pm. A Small Business Enterprise goal of 13% has been established.
PDF
PDF, High priority: read this first78 pages · ifb
HighAI Summary for FD57100030 Fire Station 7 – Go Bond IFB: City of Phoenix Design and Construction Procurement invitation for bids (Open Gov ID FD57100030) for Fire Station 7 – Go Bond, a design-bid-build construction project. The document includes the call for bids, bid due/read dates (October 13, 2026), pre-bid meeting details, scope of work for a two-story fire station, SBE goal of 13%, and general bid packet information. It also contains proposal submittal instructions, questions-and-addendum procedures, substitution requirements, and bid bond requirements, along with references to technical specifications and plan sheets.
PDF
PDF, High priority: read this firstprebid-presentation
HighAI Summary for Fire Station 7 Design-Bid-Build Pre-Bid Meeting (FD57100030): Presentation from the September 15, 2026, pre-bid meeting for the City of Phoenix Fire Station 7 project (FD57100030). The document outlines the project scope for a two-story, 18,000 sq ft facility, SBE participation goals (13%), submittal requirements, a 420-day project schedule, and specific cost allowances totaling $1,035,000.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Fire Station 7 - Go Bond Design-Bid-Build Addendum No. 2: Addendum No. 2 issued on October 1, 2026, for Project No. FD57100030 (Fire Station 7). This document extends the bid due date and bid reading date from October 13, 2026, to October 20, 2026, at 2:00 PM. It also clarifies that addenda addressing Open Gov questions will be posted by October 9, 2026.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Fire Station 7 - GO Bond Design-Bid-Build - Addendum No. 3: Addendum No. 3 issued on October 13, 2026, for Project No. FD57100030 (Fire Station 7). The document extends the bid due date and bid reading date from October 20, 2026, to October 27, 2026. It also includes a Q&A section clarifying the timeline for posting addenda and confirming that the RFI submission deadline remains October 6, 2026.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Fire Station 7 – Go Bond Design-Bid-Build Addendum No. 4: Addendum No. 4 issued on October 16, 2026, for the City of Phoenix Fire Station 7 project (FD57100030). This document provides clarifications and responses to bidder questions regarding energy code compliance for overhead doors, access control and low voltage infrastructure responsibilities, signage specifications, and fire alarm system requirements (Notifier OnyxWorks).
PDF
PDF, High priority: read this firstsow
HighAI Summary for Fire Station No. 7 Technical Specifications: Technical specifications package for City of Phoenix Fire Station No. 7 (GO Bond Program), Project No. FD57100030 / LEA Project No. 250409. Includes the table of contents and detailed divisions covering procurement requirements, general conditions, architectural, structural, MEP, site, and specialty work, plus a substitution request form during procurement. The document functions as the project’s technical specification scope and includes critical bid/contract requirements and section references.
PDF
PDF, Low prioritymeeting-attendance
LowAI Summary for Fire Station 7 - Go Bond Pre-Bid Meeting Attendance (FD57100030): Attendance record for the pre-bid meeting held on September 29, 2026, for the City of Phoenix project 'Fire Station 7 – Go Bond' (Open Gov ID No. FD57100030). The document lists representatives from the City of Phoenix and various construction and engineering firms who attended the meeting via PCH5 West and Microsoft Teams.
PDF
PDF
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
3 updates
PhaseClosed
Posted
Solicitation
Deadline changed
Response deadline changed from Oct 13, 2026 to Oct 20, 2026.
Deadline changed
Response deadline changed from Oct 20, 2026 to Oct 27, 2026.
Notice updated
The notice description changed.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyArizona → Design and Construction Procurement
The City of Phoenix is seeking bids for Project Title . Bids are to be submitted into the Design and Construction Procurement Bid Box located on the first floor of Phoenix City Hall at 200 W. Washington Street, Phoenix, AZ 85003 before Response Submission Time on Response Submission Date . Addendum #1: PLEASE SEE BELOW FOR ADDENDUM 1 Attachments: ADDENDUM_1_FS7_DBB.pdf Official Notice #1: PRE-BID MEETING POWERPOINT PRESENTATION_FD57100030_DBB: Attachments: Pre-Bid_Meeting_PowerPoint_FD57100030_Fire_Station_7_DBB.pdf Official Notice #2: PRE-BID MEETING ATTENDANCE_FD57100030_DBB: Attachments: Pre-Bid_Meeting_Attendance_FD57100030_DBB.pdf Addendum #2: SEE BELOW FOR ADDENDUM 2 Attachments: ADDENDUM_2_FS7_DBB.pdf Addendum #3: PLEASE SEE BELOW FOR ADDENDUM 3 Attachments: ADDENDUM_3_FS7_DBB.pdf Official Notice #3: Here are the full size drawings for the Addendum 4 drawings: FULL SIZE ADDEDUM 4 DRAWINGS Attachments: ADDENDUM_4_FS7_DBB_Full_Size_Drawings.pdf Addendum #4: PLEASE SEE BELOW FOR ADDENDUM 4 Attachments: ADDENDUM_4_FS7_DBB.pdf
More opportunities from Arizona → Design and Construction Procurement