Fire Suppression System at MCF Stillwater
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract pertains to the installation of a fire suppression system at the Minnesota Correctional Facility in Stillwater, designated as Project Number 78SW0074. The work will be executed under a single prime contract encompassing general construction, fire sprinkler installation, fire alarm system upgrades, and electrical work. The scope includes painting cells within Cell Blocks A, B, C, and D, as well as installing fire sprinkler protection throughout these cell blocks and the attic above Cell Block D. Additionally, the project involves implementing fire alarm systems necessary to support the new sprinkler infrastructure. The plans and specifications for the project were developed by KFI Engineers, based in St. Paul, Minnesota. The solicitation was posted on July 17, 2024, with a response deadline of August 13, 2024, and the project is estimated to be valued between $500,000 and $1.5 million. The Minnesota Department of Administration is overseeing the project, with primary contact being Mandy Flum. Interested parties can find further details and access project documents through the provided online link.
General Info
Agency
Place of Performance
MN, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
A. The work will be done under one prime contract that includes: General, Fire Sprinkler, Fire Alarm, and Electrical construction.
B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract.
1. Painting of Cells in Cell Blocks B, C, D, and half of A
2. Fire sprinkler protection of Cell Blocks A, B, C, and D
3. Fire sprinkler protection of the attic above Cell Block D
4. Required fire alarm work to support the new fire sprinkler systems
Plans and Specifications were prepared by KFI Engineers. Address: 970 County Road B West, St. Paul, MN 55113; Contact: Reed Roisum. Email: contact@example.gov, Phone +1 (555) 000-0000
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS