Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on July 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

First Article Testing (FAT) Services

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541380
New
Federal
Aeration Blower and Silencer Vibration and Shock Fixture Fabrication
Solicitation # N6660426Q0459
Solicitation N66604-26-Q-0459 is a firm-fixed-price request for quotes from the Naval Undersea Warfare Center Division, Newport, for the fabrication and assembly of two specific test fixtures: one CHT Aeration Blower Fixture Assembly and one Discharge Silencer Fixture Assembly. The contractor is responsible for procuring materials, including copper-nickel piping, and performing welding and assembly to replicate a shipboard environment in accordance with Mil-DTL-901E and Mil-Std-167A. The work will be performed at the contractor's facility and at NUWCDIVNPT, where the contractor must provide on-site technical personnel to support government-executed fitment evaluations. Key deliverables include a Fabrication and Inspection Report due within five business days of assembly completion and a final Summary Report detailing fabrication and fitment testing. The desired delivery date for the assemblies is January 15, 2027, with delivery terms set as FOB Destination, Newport, RI. Award is based on the lowest price technically acceptable, with the government reviewing past performance via the Supplier Performance Risk System. Offerors must be registered in SAM, provide a CAGE code for drawing access, and achieve CMMC Level 2 (Self) certification prior to award. Quotes are due by September 11, 2026, and must include all shipping costs within the unit price.
Nuwc Division Newport

POSTED

about 15 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The contract requires the performance of First Article Testing for a fluid adapter to ensure full compliance with the military specification MIL-DTL-24356B(1). This includes comprehensive dimensional inspections, material verification, and functional evaluations to confirm that the product meets all established technical requirements. The testing must be conducted in accordance with standardized procedures and documented through formal reports submitted to both the prime contractor and the Department of Defense. The work is to be performed at a designated location in San Diego, California, with the delivery of completed test results being a critical deliverable tied to contractual obligations. This is a subcontract under the NAICS code 541380, indicating it falls within the category of engineering services, and is issued by the Fluid Handling Division of the Department of Defense. The solicitation opens on July 13, 2026, and responses are due by July 24, 2026, with no set-aside provisions specified. All testing and reporting activities must align with DoD standards and be executed in a manner that supports traceability, accountability, and quality assurance for defense-related fluid system components. Participation is contingent upon demonstrating technical capability and adherence to the referenced military specification throughout the testing process.

General Info

First Article Testing for fluid adapter per MIL-DTL-24356B in San Diego, due July 24, 2026.

Agency

Department Of Defense → FLUID HANDLING DIVISIONView Agency

NAICS

541380 - Testing Laboratories and ServicesView NAICS

Place of Performance

SAN DIEGO, CA, 92136-3581, USA

Set-Aside

NONE

Documents

This scope was carved out of SPE7M3-26-T-7446.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ADAPTER, STRAIGHT, PIPE

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FLUID HANDLING DIVISION
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FLUID HANDLING DIVISION
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Perform First Article Testing (FAT) for the fluid adapter to verify compliance with MIL-DTL-24356B(1), including dimensional, material, and functional testing, with formal reporting to the prime and DoD.

More opportunities from Department Of Defense → FLUID HANDLING DIVISION

Same awarding agency

NAICS: 332996
New
DIBBS
47--PLUG,TUBE FITTING,T
Solicitation # SPE7M3-26-T-9067
Solicitation SPE7M3-26-T-9067 is a request for quotations issued by the DLA Land and Maritime Fluid Handling Division for the procurement of threaded tube fitting plugs, NSN 4730012140258. The requirement consists of two line items totaling 98 units, with 41 units on line 0001 and 57 units on line 0002. This is a critical application item and a source controlled drawing item, with approved sources identified as RTX Corporation (P/N 169088-1) and Eaton Aerospace LLC (P/N A40). All items must meet the requirements of basic drawing 55820 169088, Revision C. The delivery period is 49 days after the award, with a need ship date of November 10, 2026, and a final required delivery date of January 18, 2027. Delivery is FOB Origin to DLA Distribution Cherry Point. Quality assurance requires the manufacturer's inspection system to comply with ISO 9001:2015, with sampling conducted per MIL-STD-1916 or ASQ H1331. Inspection and acceptance will occur at the origin per FAR 52.246-2. Packaging and marking must adhere to MIL-STD-2073-1E, MIL-STD-129, and RP001 standards. Offerors must submit electronic quotes via the DIBBS system by September 21, 2026. The procurement falls under NAICS code 332996 and requires compliance with the Buy American Act, the Berry Amendment, and CMMC Level 2 certification. Invoicing and receiving reports must be processed through the Wide Area WorkFlow system.
Fabricated Pipe and Pipe Fitting Manufacturing

POSTED

about 15 hours ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS