Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on September 26, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FIU Fall Commencement Production 2024

Closed
2004737State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221320
New
Sioux City Wastewater Treatment Plant Facility Plan - Phase 1 Improvements Project
Solicitation # sioux-city-wastewater-treatment-plant-facility-plan-phase-1-improvements-project
The Sioux City Wastewater Treatment Plant Facility Plan Phase 1 Improvements Project, managed by Rice Lake Construction Group, involves extensive infrastructure upgrades and modernization of wastewater treatment facilities in Iowa. Key mechanical and process improvements include the replacement of preliminary treatment equipment, primary clarifiers, and the RAS pump station, alongside the rehabilitation of aeration tanks and the conversion of an anaerobic digester for sludge storage. The project also encompasses the construction of a new secondary control building, the installation of plant-wide odor control systems, and critical electrical upgrades including new main switchgear and standby emergency power generators. The scope of work requires comprehensive demolition of unused structures and buildings, as well as significant site and civil improvements to meet NFPA 820 and other safety standards. Requested materials and services span a wide range of disciplines, including hazardous material abatement, concrete and masonry work, HVAC, plumbing, and specialized water and wastewater equipment. The project also includes the implementation of new SCADA system upgrades to enhance operational control and efficiency across the facility.
Rice Lake Construction Group

POSTED

about 1 hour ago

DEADLINE

in about 4 hours
NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Internat Boundary And Water Commission

POSTED

7 days ago

DEADLINE

in 2 months
NAICS: 221320
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. This design-bid-build project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new process systems, administrative and support buildings, and utility connections. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. The project also requires a 12-month operational support period following construction. The estimated magnitude of construction exceeds 100 million dollars, with a period of performance from February 1, 2027, to February 1, 2030, and a revised assumed Notice to Proceed date of April 1, 2027. The government will utilize a multi-factor, best-value tradeoff process for award, evaluating proposals based on technical experience, technical approach, management approach, key personnel experience, and price. Key personnel requirements include a Project Manager, Construction Superintendent, Quality Control Manager, Safety Specialist, and Historic Preservation Treatment Specialist. Contractors must provide performance and payment bonds and adhere to union prevailing wage rates. Technical requirements emphasize strict cybersecurity hygiene for SCADA/MES equipment, granting the government full access to software source code, and compliance with ADA standards. Invoicing is managed electronically through the U.S. Department of the Treasury's Invoice Processing Platform, requiring a draft review by the Contracting Officer's Representative seven days prior to final submission.
Dsc Contracting Services Division

POSTED

11 days ago

DEADLINE

in 22 days

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Oct 7, 2024 to Oct 3, 2024. NAICS code changed from 334310 to 221320.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida International University
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
We are looking for a production partner to provide lighting and sound for our Fall Commencement Ceremonies. Set up would take place July 27th and ceremonies would start from December 16-19. All video is managed internally by our FIU Multimedia Department. The selected provider will be required to complete a building permit application package and will require the following. APPLICATION, APPLICANT/GENERAL CONTRACTOR INFORMATION: □ Provide complete and executed Building Permit Application Package. □ Provide a copy of current license to perform the work (either State of Florida or Miami-Dade County), including license type, number and expiration date. □ Provide Qualifying Agent’s Signature. □ Copy of required Insurance Certificates: General Liability/ Liability, Workers’ Compensation and Employer’s Liability-indicating the policy carries an endorsement, which names the Florida International Board of Trustees, Florida International University, the State of Florida, the Florida Board of Governors, and their respective trustees, directors, officers, employees and agents listed as additional insured. □ Project Name. □ Project FM Number and Project Manager Name (contact the Facilities Management Construction Department). □ Description of Work/Scope of Work. □ Architect/Engineer information; including license type, number and expiration date (if applicable). □ Any other pertinent information (if applicable). REQUIRED SUPPLEMENTAL DOCUMENTS (2 SETS REQUIRED): □ Construction Documents/Shop Drawings (Signed and sealed). □ Site Plan indicating the following: electrical, water/sewer and sanitary services, life safety elements, occupancy loads and general means of egress. Drawings must be signed and notarized by the Contractor. □ Drawings for accessible site elements (i.e. Ramps, handrails/guardrails, parking area, accessible routes, etc.). Drawings must be signed and sealed. □ Electrical drawings indicating temporary electrical connections to temporary structure. Drawings must be signed and notarized by the Electrical Sub-Contractor. □ A Structural Inspection Plan/Report shall be submitted by a State of Florida Professional Engineer who shall inspect all structural components of the temporary structure and submit an affidavit attesting compliance with the Florida Building Code and applicable technical codes prior to occupancy (If Applicable). □ Other pertinent information and/or items deemed necessary by the Building Official. The event days are as follows; Setup - Saturday- December 14, Rehearsal - Saturday- December 14, Dark Day - Sunday- December 15, Commencement - Monday- Thursday (December 16-19) Strike - Thursday Evening - December 19. Equipment and labor should include but not limited to: Audio: (1) 16 channel digital console with digital snake (1) Full range line array sound system to accommodate 3500 people. Coverage for 1500 floor seats set in theater style and 1000 arena seats per side. (4) Stage monitors on tripod stands (2) gooseneck podium microphones (1) 4pack of wireless microphones (1) audio playback system (1) Cable lot, Lighting: (1) Multi universe lighting console (1) LED Spot Moving lighting package for stage wash (Upper Stage: 56’ wide X 18’ deep X 40” high Lower Stage: 32’ wide X 12’ deep X 24” high) (1) LED Wash Moving light package for audience lighting (12) Up lights for on stage scenic palm trees (24) Up lights for drape (2) Follow spotlights (1) Power Distribution (1) Cable lot, Rigging: (1) Rigging Package to include all necessary chain motors, distros, and cables (1) Truss Package (1) 40’ Scissor Lift, Labor: (1) Set & Strike Labor Run of show (estimated 12hr days) (1) Show Producer (1) Audio Engineer (1) Lighting Designer (1) Stage Hand

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS