Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Texas was posted on December 1, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Flashing Yellow Arrow (FYA) Compliance Integration and Testing

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Malibu Canyon - Las Virgenes Road Pipeline and Pump Station Conceptual Engineering Feasibility and Fatal Flaw Analysis Study
Solicitation # 2026-RFP-051
The Las Virgenes Municipal Water District is soliciting proposals under solicitation 2026-RFP-051 for a Conceptual Engineering Feasibility and Fatal Flaw Analysis Study. The project involves evaluating the technical feasibility, constructability, and permissibility of a treated water transmission pipeline and pump station connecting the Pacific Coast Highway area to Agoura Road via Malibu Canyon and Las Virgenes Road. This infrastructure is intended to potentially support the conveyance of desalinated ocean water or provide an interconnection with Los Angeles County Waterworks District 29. The study must objectively identify fatal flaws that could impair the project, specifically addressing challenges such as shallow hard bedrock, narrow roadways, and high traffic volumes. Key deliverables include draft and final feasibility reports, capital and operational cost estimates, a project schedule, and a risk register, with analysis covering pipeline diameters from 16 to 54 inches. Proposals are due by December 4, 2026, and will be evaluated based on a weighted system: proposal cost (30%), design expertise (15%), personnel experience and qualifications (15%), and project schedule and management (15%). The selected consultant must provide a Project Manager registered as a Professional Engineer in the State of California and maintain 1 million dollars in professional liability insurance. Contractual requirements include compliance with California prevailing wage laws and equal opportunity employment standards. Payment will be made within 45 days of receiving monthly itemized statements. The District will utilize TIFF and PDF files for the study as AutoCAD drawings for the area are unavailable.
Engineering & Facilities

POSTED

about 11 hours ago

DEADLINE

in 30 days

AI Contract Overview

Show more

This subcontract opportunity with the Texas Department of Transportation focuses on the software configuration and functional testing of traffic signal controllers. The primary objective is to ensure that Flashing Yellow Arrow operations are fully compliant with both the national MUTCD and Texas MUTCD requirements. The project is categorized under NAICS code 541330. Interested parties should note the tight response window, as the solicitation was posted on December 1, 2025, with a response deadline of December 4, 2025.

General Info

Agency

Texas Department of Transportation

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 601290000032804.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Econolite Signal Controllers for Post Regional Distribution Center

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas Department of Transportation
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Software configuration and functional testing of traffic signal controllers to ensure Flashing Yellow Arrow (FYA) operation complies with MUTCD and Texas MUTCD requirements.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS