Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Flow Control Facilities Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Flow Control Facilities Rehabilitation Project is a water distribution system initiative managed by the City of Folsom in Sacramento County, California. The primary objective is to address water system deficiencies through the repair, rehabilitation, replacement, and installation of new infrastructure. The scope of work specifically includes the rehabilitation and relocation of four above-ground pressure reducing stations, the abandonment of two existing stations, and the installation of one new pressure reducing station at various locations throughout the city. This project is categorized as a sources-sought opportunity under NAICS code 237110 and is categorically exempt under Class 2: 15302 (c) as it upgrades existing infrastructure without significantly altering the purpose or footprint. Technical requirements for the project mandate that all new pipe joints be fully restrained and that all tubing and gauges be positioned on the street side of the pressure reducing stations. Construction specifications require the top of the slab to be at least two inches above the existing grade, with positive drainage maintained away from the slab and all disturbed areas. Additionally, all exposed piping must be field painted OSHA blue. The project is supported by a comprehensive set of engineering drawings dated July 2025, covering specific sites such as Glenn Drive, Whiting Way, Iron Point Road, Cavitt Drive, Scheidegger Circle, Meredith Way, Levy Road, Sands Way, Persifer Street, and Bridge Street, as well as demolition plans for the Folsom Rodeo Grounds and Vierra Circle. Primary points of contact for the project are Utilities Director Marcus Yasutake and Assistant Civil Engineer Nathan Stites.

General Info

City of Folsom project to rehabilitate and install water pressure reducing stations.

Agency

California → City of Folsom

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

various - see below, Folsom, CA, 95630

Set-Aside

NONE

Documents

(1)

City of Folsom Flow Control Facilities Rehabilitation Project NOE

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Folsom
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Folsom
Office AddressN/A
Contacts
Marcus YasutakeLead Agency Contact: Utilities Director
Nathan StitesDesignated Project Contact; Assistance Civil Engineer

Full Description

Show more
The project is generally described as water distribution system repairs, rehabilitation, replacement, and new infrastructure to improve City of Folsom water system deficiencies. The project consists of rehabilitating and relocating water distribution system pressure reducing stations above ground at four locations, abandoning two existing pressure reducing stations, and installation of one new pressure reducing station at various locations throughout the city.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities, as well as the construction of flow control facility components and site improvements. Additional requirements encompass pavement removal and restoration, traffic control, utility coordination, disinfection, startup, and commissioning to ensure a complete and operational system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for various trades, including steel pipe welding, trenchless construction, electrical and instrumentation, and the supply of aggregates, ready-mix concrete, and steel fittings. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid. Quotes are due by September 18, 2026, at 2:00 PM PT, and should be directed to Alyssa Callaway. This solicitation is open to DBE, MBE, WBE, and SBE set-asides under NAICS code 237110.
Garney Pacific, Inc.

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the targeted retrofit of approximately 343.59 linear feet of roadway to implement green infrastructure. Key deliverables include the installation of approximately 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and the planting of six native trees and approximately 345 native plants or approved equivalents. The project is designed to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area and requires necessary drainage, underdrain, inlet, pipe, and downspout work, as well as ADA-compliant curb, sidewalk, apron, crossing, and traffic-calming improvements. This solicitation specifically seeks MBE, DBE, and WBE subcontractors and suppliers, with a strong emphasis on small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, small businesses are encouraged to form consortiums. Bids must be submitted by September 17, 2026, at 4:00 P.M. Primary points of contact for this opportunity are Jennifer Wilson and Jonah Leith. The project concludes with final stabilization, cleanup, and restoration of the site.
Harbel, Inc.

POSTED

about 11 hours ago

DEADLINE

in about 21 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various contractor-furnished and Metropolitan-furnished valves, 54-inch and 145.5-inch diameter tie-ins, four surge tanks, two valve vaults, and an air compressor yard structure. Additional requirements include drainage improvements, electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids are due by September 29, 2026. The project emphasizes the inclusion of M/W/DBE subcontractors, with James W. Fowler Co. offering assistance in obtaining bonding, insurance, and necessary equipment. Quality control testing is a required component of the subcontract pricing, and the utilization of apprentices is encouraged. All negotiations must be finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 11 hours ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS