Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Force Main Pipe Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 2026-10-06.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Clark Street Pump Station Main Replacement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
ContactsNo contacts available
OfficeN/A
Organization / AgencyConnecticut → DAS Procurement
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs removal of existing piping and installation of new force main for prime contractors on South Windsor Pollution Control projects. Removes 320 linear feet of 16-inch PCCP force main and installs 18-inch fused HDPE pipe upstream of the doghouse manhole on Clark Street. Utilizes HDPE fusion welding equipment per EJCDC® C-111 standards. Delivers the installed and tested 18-inch fused HDPE force main.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
TOWN OF BENNINGTON BENNINGTON, VERMONT WATER RESOURCES DIVISION MONUMENT AVENUE EXTENSION DWSRF RF3-559
Solicitation # DWSRF RF3-559
Solicitation DWSRF RF3-559, issued by the Town of Bennington, Vermont, seeks bids for the general construction of a water main line extension. The project scope encompasses work along Meadowbrook Drive, Southshire Drive, North Terrace Drive, South Terrace Drive, and Hickory Hill Road. Key activities include trenching, removal of asphalt and subbase, installation of water mains, directional drilling, and the placement of thrust blocks, hydrants, curb stops, and service lines. Additionally, the contractor will be responsible for interior residential plumbing connections, well abandonment, and the restoration of roadway base and pavement. Funded in part through the Vermont Drinking and/or Clean Water State Revolving Fund, the project is subject to several federal mandates. These include the Build America, Buy America Act (BABAA) and American Iron and Steel (AIS) provisions, requiring the use of U.S.-produced materials. Labor must comply with Federal Wage Rates under the Davis-Bacon Act. Bidders must provide bid security and, upon award, furnish performance and payment bonds each equal to 100 percent of the contract price. Bids are due by November 19, 2026, at 2:00 pm local time, and must be submitted to the Town of Bennington Department of Public Works.
Department of Economic Development

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline, two soil cement lined dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified disadvantaged, minority, and woman-owned business enterprises across a wide range of NAICS codes related to heavy and specialty construction. Interested parties must submit their responses by October 21, 2026. Primary coordination for this opportunity is handled by Christina Pauls at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

about 7 hours ago

DEADLINE

in 14 days
View Details

More opportunities from Connecticut → DAS Procurement

Same awarding agency

NAICS: 238910
New
SLED
RFP 1175 Wintonbury Hill Golf Course - Bunker, Green & Tee Renovations
Solicitation # RFP #1175
The Town of Bloomfield is soliciting proposals under RFP #1175 for the renovation of bunkers, greens, and tees at the Wintonbury Hills Golf Course in Bloomfield, Connecticut. The scope of work includes the reconstruction of 19,940 square feet of existing sand bunkers and the construction of 4,265 square feet of new bunkers, utilizing Capillary Flow and JM Evalith liners. Additional requirements involve the renovation of the putting green on Hole #16, the expansion of tees on Holes #15 and #18, tree clearing on Hole #15, and comprehensive site work including grading, irrigation adjustments, and the installation of certified weed-free sod. The contractor is required to provide GPS as-built drawings in hard copy and AutoCAD formats upon completion. Proposals must be submitted in one original and two copies, along with a read-only thumb drive, to Purchasing Manager Joseph Muraca by 1:00 pm on November 5, 2026. Evaluation will be based on technical compliance, cost, administrative completeness, and specialized experience with golf course drainage and liner systems, including a requirement for three references from similar projects completed within the last five years. The contract includes a one-year warranty on materials and workmanship, with payments issued as monthly progress payments subject to a 5 percent retainage and 45-day terms. Selected contractors must maintain comprehensive insurance coverage, including a 2 million dollar professional liability limit and a 2 million dollar general aggregate limit.
Site Preparation Contractors

POSTED

about 18 hours ago

DEADLINE

in 30 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS