Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Fort Hood Solar Wind Energy Supply Agreement

Active
SPE600-14-R-0426Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

DLA Energy plans to solicit offers for a renewable energy contract on behalf of the US Army Garrison Fort Hood, requiring a minimum annual supply of 250 GWh of renewable energy along with all associated Environmental Attributes. The contract will involve two key components: at least 30 GWh of electricity generated from an on-site solar photovoltaic system owned and operated by the contractor, and additional electricity from a wind energy system located on private property and delivered to Fort Hood via the ERCOT grid. The total renewable energy supply meets or exceeds the specified annual requirement, with any shortfall supplemented by conventionally generated electricity from the contractor. The contract will be a firm-fixed price, requirements-type agreement with a performance period not exceeding 30 years. The solicitation seeks to secure a long-term renewable energy supply that supports the Army’s sustainability goals at Fort Hood. Primary contacts for this opportunity include Christopher Archer, Brandee Hynson, and Andrea Kincaid, all reachable via provided phone numbers and email addresses. The solicitation operates under NAICS code 221114 and is based in Killeen, Texas.

General Info

Supply 250 GWh renewable energy annually to Fort Hood via solar, wind, 30-year fixed contract.

Agency

N/A

NAICS

221114 - Solar Electric Power Generation

Place of Performance

US Army Garrison Fort Hood, KILLEEN, TX, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

13 updates
PhasePresolicitation
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Chris ArcherContract Specialist
Brandee HynsonContract Specialist

Full Description

Show more
This synopsis is prepared in accordance with FAR 5.2. DLA Energy anticipates soliciting offers for renewable energy on behalf of US army Garrison Fort Hood. The minimum annual requirement will be for 250 GWh of renewable energy and all associated Environmental Attributes consisting of a combination of (1) a minimum of 30 GWh of electricity generated from a solar photovoltaic renewable energy generation system located on US Army Garrison Fort Hood, connected behind the meter, and owned and operated by the Contractor; and (2) electricity generated from a wind renewable energy generation system that is constructed for the purpose of this solicitation on private property and delivered to Fort Hood meters through ERCOT . The period of performance will not exceed 30 years. The awarded contract will be a firm-fixed price requirements-type contract and the balance of any energy requirements above the offered renewable level will be conventionally generated and supplied electricity from the Contractor. Points of Contact Christopher Archer, Lead Buyer, Phone (703) 767-9334, Fax (703) 767-8757, Email Christopher.Archer@dla.mil Brandee Hynson, Contract Specialist, Phone (703) 767-1965, (703) 767-8757,Email Brandee.hynson@dla.mil Andrea Kincaid, Contracting Officer, Phone (703) 767-8669, Fax (703) 767-8757, Email andrea.kincaid@dla.mil

Similar Contracts

Same NAICS industry code

NAICS: 221114
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is seeking to establish a pool of prequalified energy service providers to design, install, operate, and maintain clean energy systems, including solar, wind, battery storage, and microgrids, on state-owned properties. This initiative utilizes a third-party financing model where selected vendors finance, own, and operate the systems with no upfront capital required from state agencies. Projects will be managed under long-term Site Lease Agreements and Power Purchase Agreements spanning twenty to twenty-five years, with electricity sold to host facilities at a fixed price per kilowatt hour. Systems are categorized by size into Class 1 (under 0.50 MW), Class 2 (0.51 MW to 10.0 MW), and Class 3 (over 10.0 MW). To qualify for the vendor pool, respondents must pass a comprehensive evaluation of their technical qualifications, financial strength, and regulatory compliance. Mandatory requirements include providing a California Secretary of State Certificate of Status, a Darfur Contracting Act Certification, and a veracity statement. Vendors must hold appropriate licensing, such as C-10 Electrical or C-46 Solar certifications, and provide evidence of adequate bonding capacity and creditworthiness from recognized rating agencies. Additionally, a commitment letter from financing partners is required. Qualified vendors will then be eligible to bid on specific future projects through subsequent Requests for Proposals. Responses are due by December 23, 2026, and must be submitted in both hard copy and electronic formats.
California Department of General Services

POSTED

14 days ago

DEADLINE

in 2 months
View Details
NAICS: 221114
SLED
Operations Yard and Employee Parking Lot PV Solar and Battery Project (JN 225005)
Solicitation # JN 225005
The Operations Yard and Employee Parking Lot PV Solar and Battery Project, identified by JN 225005, is an initiative by the Padre Dam Municipal Water District located in Santee, California. The project involves the design and installation of a photovoltaic solar panel array, a battery storage system, and Level 2 EV charging stations. Solar panels will be mounted on existing canopy roofs or on newly constructed carport structures within the existing employee parking lot. The scope of work also includes minor alterations to existing structures and mechanical equipment, as well as necessary ADA upgrades. All construction and operational activities will take place within existing District property at active operations facilities and previously developed or disturbed areas. The primary objectives of this project are to improve energy efficiency, stabilize long-term energy costs, and reduce the environmental impacts associated with the District's energy consumption. All work must comply with all applicable codes, regulations, and standards. Regarding environmental regulatory compliance, the project has been granted a Notice of Exemption under CEQA Guidelines Sections 15301, 15303, and 15311, as the work constitutes minor alterations and the construction of new small structures without an expansion of use. The project is managed by the Director of Engineering and Planning, Lewis Clapp, and is situated at 9120 Carlton Oaks Drive in San Diego County.
Padre Dam Municipal Water District

POSTED

26 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Conditional Use Permit No. PA-2500420
Solicitation # PA-2500420
Conditional Use Permit No. PA-2500420, managed by the San Joaquin County Community Development Department, authorizes the establishment of the North Locust Tree Road Solar Project in Lodi, California. Proposed by RPCA Solar 25, LLC, this utility-scale solar energy system will occupy approximately 18.5 acres of a 20-acre parcel classified as Prime Farmland. The project is designed to generate up to 4 megawatts of alternating current energy, which will be sold to Pacific Gas and Electric Company via an interconnection to their existing electrical distribution system located along the northwest boundary of the site. Construction is expected to take place over a three-year period. To mitigate the impact on agricultural land, the project utilizes driven steel piers for equipment mounting instead of traditional slab foundations, a method intended to prevent soil compaction and allow for the full restoration of agricultural use once the project's operational life concludes. Environmental management strategies include the use of drought-tolerant, pollinator-friendly seed mixes under and between solar rows to maintain soil health, promote stability, and reduce erosion. The project has undergone environmental assessments, including a Mitigated Negative Declaration and an Initial Study, to address impacts on biological resources, air quality, water quality, aesthetics, and greenhouse gas emissions, while ensuring coordination with the San Joaquin Council of Governments regarding habitat conservation and open space plans.
San Joaquin County

POSTED

26 days ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS