This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on June 12, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fort Peck Unwatering Pump Replacement

Awarded
W9128F25QA057Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333996
New
DIBBS
PUMP, HYDRAULIC RAM, HAN
Solicitation # SPE7M2-27-T-0508
This solicitation, issued by the DLA Weapons Support Nuclear Reactor Program under solicitation number SPE7M2-27-T-0508, is for the procurement of 66 hand-driven hydraulic ram pumps (NSN 4320-01-460-3685). The requirement is designated as a critical application item and is a restricted source item requiring engineering source approval by the government design control activity. The procurement is a total small business set-aside under NAICS code 333996, with a required delivery date of June 29, 2027, and a delivery lead time of 220 days after receipt of order. Shipping is established as FOB Origin, with the final destination being the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The contract mandates strict adherence to technical and quality requirements, including DLA packaging requirements (RP001), MIL-STD-2073-1E for packaging data, and MIL-STD-129 for marking. A specific restriction is placed on the use of mercury or mercury-containing compounds, except where functionally required. Inspection and acceptance will occur at the destination. Administrative requirements include electronic invoicing via the Wide Area WorkFlow (WAWF) system and compliance with the Buy American Act and Berry Amendment. All quotations must be submitted through the DLA Internet Bid Board System (DIBBS) by November 9, 2026.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

about 17 hours ago

DEADLINE

in 11 days
NAICS: 333996
New
SLED
Wastewater Collection System – Suction Lift Pump Station Equipment Preselection
Solicitation # 77267
The City of Montpelier, through its Department of Public Works, is seeking proposals for the prequalification and vendor selection of wastewater collection suction lift pump systems. The objective is to establish a standard manufacturer and supplier to provide the basis of design for the procurement of equipment, including pump skids and appurtenances, for the replacement, rehabilitation, and retrofit of the city's eight sewer pump stations. Proposals must be submitted electronically to [email hidden] by 3:00 PM local time on December 3, 2026, with any requests for clarification submitted by November 20, 2026. The selection process involves evaluating technical performance specifications and may include manufacturing site visits. The City reserves the right to modify its selection if pricing or service levels fail to meet industry standards. Proposed initial capital purchase costs must remain valid for 60 days following the RFP closing date. Compliance is required with the Build America Buy America Act, US EAP State Revolving Fund American Iron and Steel requirements, and 2 CFR 200.216 regarding prohibited telecommunications and video surveillance equipment. Future contracts may be structured using EJCDC 2013, 2018, or 2020 documents, amended to meet Vermont CWSRF or USDA Rural Development funding program requirements.
Department of Economic Development

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Omaha District, is soliciting quotes for the Fort Peck Unwatering Pump Replacement project at Fort Peck Power Plant 1 in McCone County, Montana. This total small business set-aside contract, under NAICS code 333996, requires the removal and disposal of two existing 3000 GPM unwatering pump assemblies and an automatic greasing system. The contractor must supply, install, and commission two new dual or single stage turbine unwatering pump assemblies with motors, a new automatic greasing system with electronic controls, and associated system components. The scope of work includes lead-based paint piping mitigation and removal, with a performance period of 240 days from award, specifically running from June 13, 2025, to February 17, 2026, and noting a blackout window from March 9 to May 23, 2026. The solicitation is structured around four Contract Line Item Numbers covering parts and materials, installation and commissioning, lead-based paint mitigation, and remaining work. Offerors must be registered in the System for Award Management and adhere to strict submission guidelines, including a 25-page proposal limit and a 90-day offer validity period. Following several amendments and question-and-answer sessions to clarify technical specifications such as ASME B31.1 weld stamps and SCADA integration, the final response deadline has been extended to June 20, 2025, at 2:00 PM CT. All work must comply with Montana wage determinations and stringent Antiterrorism and Operations Security protocols for USACE installations.

General Info

Contract Value

$1,403,505.62

NAICS

333996 - Fluid Power Pump and Motor Manufacturing

Place of Performance

Fort Peck, MT, 59223, USA

Set-Aside

SBA

Award Issued Date

Documents

12

Addendum: Instructions to Offerors—Commercial Items

PDF, High priority: read this firstrfp
High

Amendment 0002 - Solicitation W91Z8F25QA057

PDF, High priority: read this firstamendment
High

Amendment W9128F25QA0570001 - Fort Peck Unwatering Pump Replacement

PDF, High priority: read this first2 pages · amendment
High

AT-OPSEC Standard Contract Language FORM 6055

PDF, High priority: read this first2 pages · specifications
High

Fort Peck Dam Unwatering Pump Replacement Drawings

PDF, High priority: read this first16 pages · specifications
High

Fort Peck Power Plant 1 Unwatering Pump Replacement PWS

PDF, High priority: read this first13 pages · sow
High

Fort Peck Unwatering Pump Question and Answers

PDF, High priority: read this first3 pages · q-and-a
High

FP Power Plant 1 Unwatering Pump Replacement Pricing Schedule

PDF, High priority: read this firstpricing-schedule
High

Solicitation W9128F25QA057 - Fort Peck PH1 Unwatering Pump Replacement

PDF, High priority: read this first28 pages · rfp
High

Wage Determination No. 20155395 - Montana

PDF, High priority: read this first11 pages · wage-determination
High

Fort Peck PP1 Unwatering Pump Site Visit Attended List

PDF, Low prioritysite-visit-log
Low

FP Unwatering Pump Question Set #2

PDF, Low priority8 pages · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 6, 2025 to Jun 20, 2025. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts2 people available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
Contacts

Full Description

Show more
QUESTION AND ANSWER SET #2 HAS BEEN POSTED IN THE ATTACHMENTS SECTION. **** NOTE: QUESTIONS DUE DATE IS 13 JUNE 2025 BY 12:00 CST. =========================================================== AMENDMENT 0002 AND THE QUESTION AND ANSWER DOCUMENTS ARE POSTED IN THE ATTACHMENT SECTION BELOW. ============================================================ AMENDMENT 0002 - TO EXTEND THE SOLICITATION DUE DATE IS POSTED IN THE ATTACHMENT SECTION ALONG WITH THE QUESTIONS AND ANSWERS. ANY FURTHER QUESTIONS, MUST BE PROVIDED TO MS. LYNNE REED AT contact@example.gov ON OR BEFORE 10 JUNE 2025 BY NOON (1200) CST. ============================================================= POSTING - AN AMENDMENT WILL BE FORTHCOMING BY COB THURSDAY TO EXTEND THE SOLICITATION DUE TO DATE TO 20 JUNE 2025 BY 2:00 PM CT AND WILL INCLUDE ALL OF THE ANSWERS TO THE QUESTIONS. ============================================================= POSTING OF THE SITE VISIT SIGN-IN SHEET; SEE ATTACHMENTS ============================================================= AMENDMENT 0001 HAS BEEN POSTED IN THE ATTACHMENT SECTION. AMENDMENT 0001 IS TO ADD THE SITE VISIT INFORMATION. PLEASE REACH OUT TO MR. THOMAS GRANT TO SECURE YOU PLACE FOR THE SITE VISIT. ============================================================= Site Visit will be conducted for this requirement on 29 May 2025 at 0900 MST at Fort Peck Montanas. This will NOT be a virtual site visit. If you attedn to attend the site visit please contact Thomas Grant at contact@example.gov. Once registered to attend Mr. Grant will provide details concerning the location of the Site VIsit. ============================================================= *An Amendment will be issued to clarify this information as soon as possible. This is a COMBINED SYNOPSIS and SOLICITATION is for W9128F25QA057. On 20 May 2025, the U.S. Army Corps of Engineers, Omaha District intends to issue a Request for Quote solicitation for - Fort Peck Unwatering Pump Replacement. The solicitation will close on or about 6 June 2025 by 2:00 PM CT. DESCRIPTION OF WORK: The Fort Peck PP1 Unwatering Pumps have reached the end of their design life and one pump has failed. This is a supply contract with incidental services to remove and dispose of the existing two (2) 3000GPM unwatering pump assemblies and automatic greasing system. To supply, install, and commission two (2) new complete dual or single stage turbine unwatering pump assemblies with motors, one (1) automatic greasing system for the new pump assemblies (including electronic controls for the grease system), and the following system components at Fort Peck Power Plant 1. NAICS Code: The Primary North American Industry Classification System (NAICS) code anticipated for solicitation is 333996 - Fluid Power Pump and Motors Manufacturing, with a size standard of 1,250 Employees. Place of Performance: Fort Peck Dam, McConeCounty, Montana Contracting Office Address: USACE Omaha District 1616 Capital Ave, Omaha, NE 68102-4901 Point Of Contact: All questions regarding this pre-solicitation should be made to the Contract Specialist, Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database (https://sam.gov) exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov. Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendment current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update. Lynne Reed, who can be reached by email: contact@example.gov.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 541330
New
Federal
USACE Omaha District - $249M Unrestricted Sentinel Construction Management Services (CMS) MATOC
Solicitation # W9128F26RA124
The USACE Omaha District is soliciting proposals for the Sentinel Construction Management Services (CMS) Multiple Award Task Order Contract (MATOC) under NAICS 541330. This unrestricted effort has a total estimated capacity of 249 million dollars, with the government intending to award four firm-fixed price Indefinite Delivery Contracts (IDCs). The contract supports the U.S. Air Force across the Northwestern Division, covering 15 states including Washington, Oregon, Idaho, Nevada, Utah, Montana, Wyoming, Colorado, North Dakota, South Dakota, Nebraska, Kansas, Iowa, Missouri, Minnesota, and Wisconsin. The performance period consists of a five-year base period with options extending the total duration up to seven years and six months. The scope of work involves providing professional, administrative, and management staff augmentation to oversee construction projects. Key responsibilities include performing Quality Assurance inspections per ER 1180-1-6, monitoring safety compliance according to EM 385-1-1, and managing project documentation through the Resident Management System or Construction Management Platform. Awards will be based on a best-value tradeoff process evaluating past performance, technical and management approach, key personnel resumes, small business participation, and cost. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 10, 2026.
Engineering Services

POSTED

2 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2 project is a construction effort located along the left descending bank of Lake Sharpe near Big Bend, South Dakota. Managed by the USACE Omaha District, the project focuses on Reach 4 of the lake and involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and a 200-by-1,500-foot island in water up to three feet deep. Key technical requirements include the installation of a riprap revetment to protect against erosion and the planting of cottonwood trees and other culturally significant vegetation. These efforts are designed to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland through tasks such as earth moving, grading, bank shaping, and topsoil placement. This procurement is a 100 percent Small Business Set-Aside under NAICS code 237990, with an estimated construction value between 10 million and 25 million dollars. The project is being solicited as a single-step sealed bidding process via an Invitation for Bid, with a required period of performance of 550 days following the Notice to Proceed. Bidders must be registered in the System for Award Management and submit their offers through the PIEE Solicitation Module. Additional requirements include the provision of performance and payment bonds and adherence to South Dakota Heavy and Highway wage determinations, with a specific note regarding a 4.5 percent Tribal Employment Rights Ordinance tax.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541990
New
Federal
Vandenberg SFB Tank Inspection
Solicitation # W9128F27QA002
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract for the inspection of Department of Defense fuel tanks at Vandenberg SFB, California. This 100 percent Service-Disabled Veteran-Owned Small Business set-aside under NAICS 541990 requires the contractor to perform API 653 internal inspections on aboveground storage tanks, specifically focusing on Tank 1702, a welded steel vertical Jet A storage tank. The scope of work includes fuel removal, disposal, tank cleaning, and the replacement of wiper seals. Contractors must provide a certified API 653 inspector and a project manager to ensure compliance with API 650, API 653, NFPA 30, and various Unified Facilities Criteria and military standards. The government will award the contract based on best value, evaluating technical capability, relevant experience in fuel tank draining and cleaning, and price reasonableness. Proposals are limited to five pages and must be submitted electronically by November 13, 2026. Key deliverables include draft and final inspection reports featuring non-destructive testing summaries, engineering calculations, and categorized repair recommendations. Due to the location on a military installation, all personnel must adhere to strict security vetting and base access requirements. The contract also includes an option for the removal and disposal of excess fuel up to 2,000 gallons per purchase order.
All Other Professional, Scientific, and Technical Services

POSTED

3 days ago

DEADLINE

in 15 days
View Details
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
Oil and Gas Pipeline and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS