Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Frenchville — Highway Reconstruction with Drainage Improvements Project is located on US Route 1, beginning 0.40 miles north of Church Avenue (Charette Hill Road) and extending northerly 4.64 miles.

Active
022656.00State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Maine Department of Transportation is soliciting bids for solicitation number 022656.00, a highway reconstruction and drainage improvement project on US Route 1 in Frenchville and Fort Kent, Maine. The project spans 4.64 miles, beginning 0.40 miles north of Church Avenue and extending northerly. The scope of work includes reconstructing existing pavement and roadway shoulders to improve geometric alignment and sight distance, applying 5 inches of Hot Mix Asphalt (HMA) meeting PG 64E-28 grading requirements, and installing roadside ditching, cross culverts, driveway culverts, and closed drainage systems. The project also involves utility coordination with the Town of Frenchville sewer department and the installation of precast concrete block gravity walls. Bids are due by 11:00 AM on October 7, 2026, and may be submitted via paper or electronically through Bid Express. Requirements for award include prequalification and a bid bond of 5 percent of the bid amount. Upon award, the contractor must provide performance and payment bonds each totaling 100 percent of the contract amount. The project is subject to Build America, Buy America requirements, the Davis-Bacon Act, and specific labor standards, including a minimum wage of 13.30 dollars per hour for 2025 and mandated paid sick leave. All certified payrolls and payment tracking must be managed through the Elation System. The contractor is expected to complete all work by November 15, 2006, and must adhere to quality assurance provisions and MaineDOT sampling and testing policies.

General Info

MaineDOT seeks bids for US Route 1 highway reconstruction in Frenchville and Fort Kent.

Agency

Maine Department of TransportationView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Frenchville, ME, USA

Set-Aside

NONE

Documents

(6)

STP-2265 (600) - US Route 1 Frenchville-Fort Kent Cross Sections

PDFspecifications

Proposal 022656.00 - Schedule of Items

PDFspecifications

STP-2265(600) Frenchville-Fort Kent Final Plans

PDFspecifications

MaineDOT STP-2265(600) - Highway Reconstruction Frenchville & Fort Kent

PDFitb

Maine DOT Contract Bid Book - Bidding Instructions

PDFrfb

Route 1 Frenchville-Fort Kent Geotechnical Design Report (STP-2265(600))

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMaine Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
Maine Department of Transportation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Highway Reconstruction with Drainage Improvements
Project is located on US Route 1, beginning 0.40 miles north of Church Avenue (Charette Hill Road) and extending northerly 4.64 miles.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Federal
REPAIR Airfield Apron - 126 ARW, Scott AFB, IL
Solicitation # W50S7S26
Solicitation W50S7S26Q0031 is a total small business set-aside for comprehensive airfield repairs at the 126th Air Refueling Wing, Scott Air Force Base, Illinois. The project, with an estimated magnitude between 1 million and 2 million dollars, involves four primary components: concrete apron joint sealant and crack/spall repair, asphalt shoulder milling and overlay of approximately 14,500 square yards, airfield marking removal and replacement of approximately 35,000 linear feet, and POL asphalt road repair of 550 square feet. All work must adhere to Air Force and FAA standards, including UFC 3-260-01 and UFC 3-270-02, and utilize Federal Specification TT-P-1952 approved paint for markings. The contract requires a 90-day period of performance, starting from the issuance of the Notice to Proceed. Award evaluation is based on a combination of technical capability, past performance, and price, with a technical boost provided to vendors who attended the site visit. Submission requirements include a technical narrative, a proposed project schedule, a supervisor resume not exceeding two pages, and a completed pricing sheet. The project is subject to Construction Wage Rate Requirements per Wage Determination IL20260017 and requires performance and payment bonds. While initial documents mentioned bid guarantees, Amendment 2 clarified that no bid bonds are required.
W7M6 Uspfo Activity Ilang 126

POSTED

about 11 hours ago

DEADLINE

in about 19 hours
View Details

More opportunities from Maine Department of Transportation

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS