Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on January 8, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ft Harrison, MT Veteran's Affairs Medical Center (VAMC) Seismic Upgrade and Specialty Care Improvements; Phase I - Design-Build Central Utility Plant (CUP) and Parking Garage (PG)

Closed
W9128F23R0042Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 12 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 12 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 12 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Fort Harrison, MT, 59636, USA

Set-Aside

NONE

Documents

3

Pre-Solicitation Notice W9128F23R0042 - Ft Harrison VAMC CUP and Parking Garage

DOCX, Low priority4 pages · presolicitation
Low

Pre-Solicitation Notice W9128F23R0042 - Ft Harrison VAMC Seismic Upgrade

DOCX, Low priority4 pages · presolicitation
Low

W9128F23R0042 - Ft Harrison VAMC Seismic Upgrade and CUP Phase I

PDF, Low prioritypresolicitation
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Oct 1, 2023 to Feb 12, 2024.

Type Changed

Presolicitation → Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Type Changed

Sources Sought → Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts2 people available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
Contacts
Adam L. Beaver Contract Specialist
Robin D. Boyd Contracting Officer

Full Description

Show more
AMENDED REVISED - 08 January 2024 Pre-Solicitation Notice W9128F23R0042 On or about 22 February 2024, the Government intends to issue Phase One of a solicitation for - Ft Harrison, MT Veteran's Affairs Medical Center (VAMC) Seismic Upgrade and Specialty Care Improvements; Phase I - Design-Build Central Utility Plant (CUP) and Parking Garage (PG). This is a Design-Build contract to awarded in accordance with FAR Part 36.3. The Phase One solicitation will close on or about 22 February 2024. The solicitation is Unrestricted and Open to Both Large and Small Business Participation. Site Visits: There will be no scheduled site visits during the Phase One solicitation phase. Phase Two: A Site Visit will be scheduled and additional information regarding the site visit will be provided in the amended solicitation via FAR Clause 52.236-27. The Phase Two site visit is tentatively scheduled for 30-31 May 2024. Project Description: Project Scope. An approximately 15,700 GSF Central Utility Plant (CUP) with utilities distribution system and an approximately 660 space Parking Garage north of the main hospital building, and the demolition/modification of the existing campus heating/hot water system and chilled water system. The existing site is situated near the property line that borders the adjacent National Guard installation to the north, the existing B170 warehouse building to the west, and a potential Outpatient Mental Health Facility (Building 173 - to be constructed by others) to the east. The site is located partially on an existing parking lot, and the rest of the site occupies open undeveloped space with natural vegetation. At various times, there are a fluctuating number of shipping containers that may be located on or near the site. The site slopes generally from the west to the east. Surface water runoff is mostly sheet flow, there are no identifiable concentrated f lows within the project site. Most of the campus has open section roadway (no curb and gutter), apart from the area immediately surrounding the main hospital facility itself. There are some identified utilities that run through the project site, like sanitary sewer, signal / telecom utilities, and some water lines. There are existing light poles along the perimeter of the existing parking lot. Closer to the hospital, there is irrigated turfgrass, but that does not extend to the project area. Service Access Road and Site Civil: Design and build all site prep and site work, utilities relocation, CUP site utilities, and a new access road connecting Devil's Brigade to Middle Road by extending Devil's Brigade Way around the north end of campus to allow for service access to B170 once the existing Devil's Brigade paralleling Patriot's Way is closed for construction. Central Utility Plant: The structural system will be designed such that access to overhead pipe and duct support is possible. Design the building to allow all equipment to be installed and removed in the future. Given the building height (currently assumed to be about 30), and approximate size of the new CUP facility (~15,700 sq. ft.) the building will utilize exterior load bearing concrete masonry unit wall construction with exterior face brick to match brick used elsewhere on the campus. Primary Utilities Distribution System and Building 171 Demolition: The primary distribution system is designed to connect the new CUP to the main hospital complex (building 154) and the existing steam and chilled water systems. The distribution system is primarily routed underground in a new utility corridor (approximately 8'x8), to Building 154, Building 154A, Building 150, The primary connection from the CUP to the Main Hospital Building (154) will be through the primary utilidor. This connection will be made in Mechanical Room B100 located in the basement of Building 154. In addition to steam, steam condensate, and chilled water piping, the utilidors must be provided with lighting, ventilation, and drainage as required by code and VA design manuals. The utilidor design must provide a safe working space as required. Building 171 (operational boiler plant) must remain online until the requirements for commissioning and stable operation of the new CUP are complete. Building 171 is equipped with three (3) Superior fire tube low pressure steam boilers (2012 build) that feature a maximum allowable working pressure (MAWP) of 30 psig and have a rated capacity of 8,625 lb/hr steam. Additionally, the building is equipped with two (2) Superior fire tube high pressure steam boilers (2012 build) that feature a maximum allowable working pressure (MAWP) of 150 psig and have a rated capacity of 5,175 lb/hr steam. Building 171 shall be gutted and left in an environmentally controlled state. The new CUP is to be operational for a period of not less than 10 days prior to decommissioning this plant. Existing fuel tank. The existing ~10,000 gl fuel underground storage tank providing backup fuel to the boilers in 171 will have to be removed in accordance with Montana Department of Environmental Quality standards and the area restored. Existing Oxygen tank. A new Oxygen tank pad will be built near B170, and oxygen connections will be routed underground to the primary utilidor, then to the main hospital. The existing tank pad will be demolished after Oxygen tank removal (to be performed by others). Optional Secondary Utilities Distribution System, System Connection and Demolition: The secondary utilities distribution system is designed to connect the main utilities corridor (and the CUP) to building 169 (Room 180) and building 141B. Two separate secondary utilities corridors will connect to the primary utilidor along it's run to the main hospital. One corridor will run west around the main hospital to building 169 (Room 180)s mechanical room, and the other will run east around building 154 to the mechanical/boiler room at Building 141B. Work within the existing buildings includes connection of the new steam utilities from the CUP to the existing building steam systems and the replacement of the hydronic heating boilers in the Building 141B plant with shell and tube heat exchangers to convert the steam to heating hot water. The existing hydronic heating hot water distribution system within the buildings is to remain. Work within the existing buildings also includes connection of the new chilled water utilities from the CUP to the existing building chilled water systems. The existing chillers and chilled water distribution systems within the buildings are to remain as backup. The new chilled water connections to each chilled water distribution system must include flow metering and temperature monitoring in addition to motorized valving to allow selection of CUP chilled water operation or individual chiller system operation. Building 141B (existing hydronic plant) contains two (2) Superior fire tube hot water boilers installed in 2010 with MAWP of 60 psig and rated at 200 BHP or 6,700 MBH and two (2) Patterson Kelly hot water boilers installed in 2015 with 160 psig MAWP rated at approximately 60 BHP or 2,000 MBH. This equipment is to be replaced by heat exchangers supported by the new CUP with equipment to be salvaged with value recaptured in the project cost. Building 169 (Room 180) (Residential Rehabilitation) contains three (3) unitary boilers that are to be replaced by heat exchangers supported by the new CUP. This equipment is to be salvaged with value recaptured in the project cost. Optional Parking Garage: The parking garage is an approximately 660 space parking structure. The project includes site improvements, rerouting of existing streets, site utilities, and a covered walkway and will be constructed to accommodate a future roof structure and photo-voltaic panels. The facility will also include facility vertical transportation, facility mechanical, electrical, communications, and fire protections systems. The facility shall meet life safety, Physical Security, and accessibility requirements. A connected covered walkway will connect the garage to the northeast entry of building 154. The facility will have vertical transportation lobbies at each level. Construction work time frame: The Contractor will be required to commence work upon receipt of contract award and complete the work 1320 calendar days after receipt of Notice to Proceed, this is subject to change after solicitation issuance. Additional time will be granted if Optional items are awarded. Estimated Construction Costs: The estimated construction cost of this project is between $50,000,000 and $100,000,000. NAICS Code: The Primary North American Industry Classification System (NAICS) code anticipated for solicitation is NAICS Code 236220 - Commercial and Institutional Building Construction, with a size standard for Small Business of $45M. Obtaining Draft Solicitation Documents: Draft solicitation attachments will be available upon request. Please contact the Contract Specialist, Adam Beaver by sending an e-mail to adam.l.beaver@usace.army,mil with - Solicitation - Ft Harrison, MT VAMC Seismic Upgrade and Specialty Care Improvements; Phase I - Design-Build Central Utility Plant (CUP) and Parking Garage, SOLICITATION ATTACHMENT DOCUMENT REQUEST. before 1400 CST on 15 March 2024. Files will be sent to interested parties through Department of Defense (DoD) Secure Access File Exchange (SAFE). Include the following in your request: a.Firm's name, address, point of contact, phone number, e-mail address, CAGE and DUNS number. b. Firm's business category and size: Large Business, Small Business, Small Disadvantaged, 8(a) firm, historically underutilized Business Zones (HUBZone), Economically Disadvantaged Women-Owned Small Business (EDWOSB), and Service-Disabled Veteran-Owned Small business (SDVOSB). Contracting Office Address: USACE Omaha District, 1616 Capital Ave, Omaha, NE 68102-4901 Contact: Submit general questions and RFIs on ProjNet under Bidder Inquiry Key: XB2HIW-WBYQIH. General questions and RFIs should focus on the solicitation, timeline/schedule, scope clarifications, etc. Submit questions by 8 March 2024, to the contract specialist Adam Beaver by sending an e-mail to adam.l.beaver@usace.army.mil with - Solicitation - Ft Harrison, MT VAMC Seismic Upgrade and Specialty Care Improvements; Phase I - Design-Build Central Utility Plant (CUP) and Parking Garage, RESPONSES TO INDUSTRY QUESTIONNAIRE. Place of Performance: Ft Harrison VAMC, Ft Harrison, MT Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be up-dated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov (sam.gov). Registration is required to access solicitation documents. Beta SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The USACE Omaha District intends to award a contract for the Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2, located in Big Bend, Lower Brule, South Dakota. This project is a 100 percent Small Business Set-Aside under NAICS code 237990, with estimated construction costs ranging from 10 million to 25 million dollars. The scope of work involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and the creation of a 200-by-1,500-foot island in Reach 4 of the lake. This island will be planted with cottonwood trees and culturally significant vegetation, protected by a riprap revetment to prevent erosion from wind, waves, and ice. These efforts are expected to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland. The government plans to issue the Invitation for Bid on approximately October 6, 2026, with a closing date around November 10, 2026, and a scheduled site visit on October 28, 2026. The selected contractor must complete the work within 450 days of receiving the Notice to Proceed, and the contract will include provisions for liquidated damages and requirements for both performance and payment bonds. Bids must be submitted through the Procurement Integrated Enterprise Environment Solicitation Module, and all offerors must maintain an active and verified account in the System for Award Management.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

N/A
View Details
NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
Federal
Cooling Water System Repair and Reliability Project
Solicitation # W9128F26XICGB
The U.S. Army Corps of Engineers Omaha District is seeking capability statements for the Cooling Water System Repair and Reliability Project at Cavalier Space Force Station, ND. This project, estimated between 50 million and 70 million dollars, involves the comprehensive rehabilitation and modernization of a large-scale industrial cooling water system. The scope of work includes installing new fluid coolers, pumps, distribution loops, and a redundant heat exchanger arrangement, as well as the demolition and replacement of 24-inch piping. Critical requirements include maintaining full operational continuity of the system throughout construction to support national defense missions, adhering to HEMP requirements, and performing ACM abatement. The government intends to utilize a Progressive Design-Build approach via an Other Transaction Authority agreement under 10 U.S.C. 2808a, which operates outside the Federal Acquisition Regulation. Selection will be based on qualifications rather than price, focusing on team composition and past relevant experience. The anticipated schedule begins with design in the second quarter of fiscal year 2027, followed by construction in the fourth quarter of the same year. Interested firms must be registered in SAM.gov, capable of bonding at least 70 million dollars for a single project, and compliant with Cybersecurity Maturity Model Certification Level 1.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 6 days
View Details
NAICS: 238990
Federal
GARRISON TRASH RACK MODIFICATION CRANE RENTAL
Solicitation # W9128F26QA099
Solicitation W9128F26QA099 is a firm-fixed-price service contract issued by the U.S. Army Corps of Engineers, Omaha District, for the rental of a crane and a qualified operator at the Garrison Dam near Riverdale, North Dakota. The primary objective is to support the modification of intake trash racks to conserve cool waters for fishery missions during drought conditions. The contractor is responsible for providing all equipment, tools, vehicles, and supervision necessary to lift and lower trash racks weighing between 30,000 and 33,000 pounds, with the capacity to overcome friction factors up to 41,000 pounds. The period of performance is scheduled from October 30, 2026, through June 30, 2027. This procurement is a total set-aside for Women-Owned Small Businesses and Economically Disadvantaged Women-Owned Small Businesses under NAICS 238990. Award will be based on the most advantageous offer, evaluating price alongside technical information and past performance, including three project examples from the last two years. Key compliance requirements include adherence to EM 385-1-1 safety standards, the submission of a site-specific Accident Prevention Plan and Lift Plan, and compliance with Service Contract Act wage determinations for North Dakota. Following Amendment 0001, the closing date for the submission of offers has been extended to October 23, 2026, at 2:00 PM.
All Other Specialty Trade Contractors

POSTED

8 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS