Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on November 14, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fuel Tank, Pumps and Dispensers Testing and Repair

Closed
05A2796State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
Federal
STA Sand Key Repair Fuel Lines and Tank
Solicitation # 30321PR270000001
The Department of Homeland Security, United States Coast Guard, is soliciting a single Firm-Fixed-Price contract for the repair, remediation, testing, and coating of fuel lines, storage tanks, and associated infrastructure at Station Sand Key in Clearwater, Florida. This total small business set-aside under NAICS 237120 involves comprehensive work including treating corrosion on diesel and regular unleaded spill containment units and tanks, applying environmentally safe paint, and calibrating clock gauges for 90 percent high-level warning alarms. The scope also includes repairing dispensers to correct flow rates, performing integrity tests on under dispenser containment and transition sumps, and replacing non-compliant copper fuel piping for the emergency generator tank. The contract will be awarded based on a best value tradeoff, evaluating technical capability, past performance, and price reasonableness. Performance is subject to strict military installation regulations, including a 15 mph speed limit, prohibition of firearms, and a requirement that only U.S. citizens or permanent resident aliens be permitted on site. The contractor must adhere to OSHA 29 CFR Part 1926 safety standards and provide a written safety plan. All work must be coordinated with the Contracting Officer’s Representative to ensure the facility maintains its capability to fuel operational vessels. A pre-proposal site visit is scheduled for November 4, 2026.
Base Miami Beach

POSTED

about 5 hours ago

DEADLINE

in 15 days
NAICS: 237120
New
SLED
Rebid of WCTA Fuel System Installation - WCTA PA 2026-1.1GC – General Construction
Solicitation # WCTA PA 2026-1.1GC
Washington County Transportation Authority dba Freedom Transit is soliciting bids for contract WCTA PA 2026-1.1GC to construct a new fuel system at the WCTA Operations Facility located at 375 Berry Road, Washington, PA. The scope of work includes the construction of a concrete fuel tank pad with protective bollards, the installation of one 12,000-gallon gasoline aboveground storage tank and one 6,000-gallon diesel aboveground storage tank, two combo gas/diesel dispensers, two fuel management units, and a metal canopy. The project also requires the installation of all necessary electrical power and control wiring. Bids must be submitted electronically via the PennBid portal by 2:00 PM EST on November 18, 2026. The contract will be awarded to the lowest responsible proposer, with a strong emphasis on the use of Disadvantaged Business Enterprises (DBE). Compliance with Federal Davis-Bacon prevailing wage rates, Buy America requirements, and FTA Circular 4220.1 is mandatory. Bidders must provide a bid guarantee equal to 5 percent of the bid price, and the successful contractor must provide performance and payment bonds for 100 percent of the contract price. Project administration will be handled by a Construction Manager, and payments will be processed using AIA Documents G702/CMa and G703. The contractor is responsible for all quality control testing and inspections, and the project includes a 60-day warranty period from the date of installation.
Washington County

POSTED

1 day ago

DEADLINE

in 20 days
NAICS: 237120
New
International
EXCAVATION AND BACKFILLING OR JOINTS REPAIR WORK OF KWSC PIPELINE
Solicitation # Doc342127147
Pakistan Refinery Limited is seeking sources for the excavation and backfilling or joints repair work of the KWSC pipeline in Pakistan. The scope of work involves excavation across various surfaces including concrete, soil, rock, or roads, with an estimated total quantity of 24,000 square feet. Key technical requirements include backfilling in layers not exceeding 6 inches in depth, compacting to 95 percent ASHTO dry density, and performing dewatering as needed. The contractor is responsible for all barricading and shoring using planks and scaffolding in accordance with HSEQ and area standards. Payment for excavation will be based on actual work performed, subject to the satisfaction of the Engineer or Client Representative. Potential contractors are evaluated based on their company profile, legal status, and registration with local authorities such as FBR, SRB, EOBI, and SESSI. Critical evaluation criteria include a proven track record in the oil and gas industry, supported by a client list and official work orders. Applicants must demonstrate the availability of experienced staff and necessary equipment, provide their annual turnover and income tax return acknowledgments, and submit a comprehensive HSEQ competence policy. The solicitation, identified as Doc342127147, was posted on October 23, 2026, with a response deadline of November 4, 2026.
Pakistan Refinery Limited

POSTED

6 days ago

DEADLINE

in 6 days
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
W071 Endist Omaha

POSTED

6 days ago

DEADLINE

in 22 days

Documents

1

IFB # 05A2796 - Fuel Tank, Pumps and Dispensers Testing and Repair Service

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Contractor shall provide all labor, tools, vehicles, parts, equipment, travel, and incidentals and pay all costs, disposal fees, necessary to perform fuel tank, pumps and dispenser inspections, service, repair, and testing certification for 30 fuel tanks and 32 dispensers

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Modify the existing traffic control signals.
Solicitation # 07-381404
The California Department of Transportation is soliciting bids for Contract 07-381404 to modify existing traffic control signals on State Highway Route 213 at Del Amo Boulevard in the City of Torrance, Los Angeles County. The project has an estimated cost of 780,000 dollars and requires bids to be submitted on a unit price basis by November 17, 2026. The scope of work includes modifying signal and lighting systems, implementing temporary signal systems and pedestrian access routes, and installing thermoplastic crosswalks and pavement markings with enhanced wet night visibility. Contractors must also submit a Lead Compliance Plan and adhere to specific technical standards for electrical systems and roadside signs. Performance must begin within 180 days of contract approval, with a 72-hour notice required before starting job site activities. The contract mandates compliance with Buy America requirements for certain department-furnished materials, such as traffic controller cabinets and camera assemblies, and requires adherence to California prevailing wage rates. Quality assurance involves source inspections for equipment enclosures and functional testing of cameras in the presence of an Engineer. Administrative requirements include submitting payment information through the department's prompt payment monitoring system, with strict payment timelines for subcontractors and material suppliers.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 19 days
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Los Angeles County At Various Locations On Route 10 From 0.2 Mile West Of Francisquito Avenue Undercrossing To Fairplex Drive Overcrossing And On Route 57 From 0.3 Mile South Of Brea Canyon Road Undercrossing To Gladstone
Solicitation # 07-379904
Solicitation 07-379904 is a unit price construction contract issued by the California Department of Transportation for highway improvements in Los Angeles County. The project scope involves construction on State Highway Route 10, from 0.2 mile west of the Francisquito Avenue undercrossing to the Fairplex Drive overcrossing, and on Route 57, from 0.3 mile south of the Brea Canyon Road undercrossing to Gladstone. With an estimated project cost of 7.4 million dollars, the work encompasses roadway excavation, concrete removal, clearing and grubbing, and the implementation of drainage, utilities, and electrical systems. Key deliverables include pavement structural work and comprehensive traffic management, requiring the use of special portable freeway detour signs and changeable message signs to ensure the traveled way remains open when construction is not active. The contract mandates strict adherence to 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Bidders must submit responses by December 8, 2026. Compliance requirements include following Buy America/Build America standards for manufactured products, providing environmental product declarations for concrete and asphalt, and adhering to prevailing wage rates as determined by the California Department of Industrial Relations or the U.S. Secretary of Labor, whichever is higher. Quality control is emphasized through mandatory ACI Concrete Field-Testing Technician Grade 1 certification for personnel and rigorous testing of materials at METS. Additionally, the project requires a lead compliance plan and specific marking and labeling standards for steel barriers, connection bolts, and pavement markings.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS