This Solicitation opportunity from Georgia was posted on August 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
FVSU-Vet Tech Boiler Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the construction of the FVSU Vet Tech Boiler Replacement project at Fort Valley State University, Georgia, with bids due by 2:00 PM on September 23, 2025, at the Wilson Roberts Building Conference Room. The project involves removing the existing boiler system and installing a new, fully operational boiler, including all mechanical, electrical, and control systems, within a 90-day schedule. Bidders must submit sealed, notarized bids on the official form, accompanied by a bid bond of at least 5%, and ensure all blanks are filled. The project will be awarded on a lump sum basis to the lowest responsive and responsible bidder, with the Owner reserving the right to reject all bids or negotiate if bids exceed the budget. The procurement process emphasizes compliance with Georgia statutes, safety, financial capacity, past performance, and adherence to specified standards, notably Georgia laws governing ethics, immigration, and preferences for Georgia-made products. The contractual framework is a design-bid-build arrangement governed by state regulations rather than federal FAR clauses. It incorporates detailed provisions for bonds, insurance, responsibility, and legal compliance, including requirements for minority and female business participation, safety standards, and environmental considerations. The contract emphasizes strict quality control, with the contractor responsible for ongoing inspections, certifications, and documentation, including shop drawings, manuals, test reports, and warranties, all to be reviewed and approved at the project site. Payment procedures involve periodic applications supported by detailed cost breakdowns, with final certification contingent upon full completion, documentation submission, and resolution of punchlist items. The contract also includes special clauses on security, personnel qualifications, change management, and organizational conflict of interest, ensuring comprehensive oversight and adherence to Georgia’s legal and safety standards throughout the project lifecycle.
General Info
Place of Performance
GA, USASet-Aside
Documents
3AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Install Pier D High Pressure Air System, NSBREM-724-AOpen now, due in 15 days
- Water Pump ReplacementOpen now, due in 13 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
