Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on July 29, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FY22 Brunswick Inner Harbor Maintenance Dredging

Awarded
W912HN22C5005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The FY22 Brunswick Inner Harbor Maintenance Dredging contract, solicitation W912HN22C5005, is a total small business set-aside awarded by the Department of Defense through the Endist Savannah office. The project involves providing all personnel, equipment, and materials necessary to perform maintenance dredging in the Brunswick Harbor deep draft navigation projects in Glynn County, Georgia. Utilizing a hydraulic cutterhead dredge, the contractor is expected to remove up to 500,000 cubic yards of material over a three-month period, with a primary focus on the East River, South Brunswick River, and Lower Turtle River to maintain a project depth of 36 feet. All removed material must be placed in the Andrews Island Dredged Material Containment Area, which serves as the sole confined upland disposal site for the harbor. Operations are subject to strict environmental windows, specifically prohibiting the placement of dredged material at Andrews Island from mid-April through mid-August to protect Least Tern nesting. The work is typically executed in late summer or fall, with the East River receiving the bulk of the annual dredging efforts.

General Info

Contract Value

$2,371,005.04

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Savannah, GA, 31401, USA

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Savannah
Contacts2 people available
OfficeSAVANNAH, GA, 31401-3604, USA
Office AddressSAVANNAH, GA, 31401-3604, USA

Full Description

Show more
The Brunswick Inner Harbor Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be three months from time of award. Up to 500 thousand cubic yards of maintenance material is expected to be removed from the inner harbors. The work is located in Brunswick Harbor Georgia deep draft navigation projects. Brunswick Harbor is located 70 statute miles south of the Savannah Harbor, Georgia, and 25 statute miles north of Fernandina Harbor, Florida (FL), in Glynn County, Georgia. Brunswick Harbor Inner Harbor channel is 36 ft. deep MLLW and 400 ft. wide through St. Simon Sound, Brunswick River, Turtle River, South Brunswick River, and East River. Brunswick Harbor Inner Harbor is generally dredged in late summer or fall and takes approximately two months to complete. The dredging in the Brunswick Inner Harbor primarily takes place annually in the East River which includes the East River Turning Basin and the Transition Areas (stations 0+000 to 12+000) leading up to the turning basin and immediately upriver of the basin. The South Brunswick River (stations 0+000 to 7+000) in the Brunswick Inner Harbor is the other area that may requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. The Lower Turtle River (station 35+000 to 36+000) in the Brunswick Inner Harbor is another area that may requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. Approximately 295,000 cubic yards of material is removed from the East River annually, approximately 20,000 cubic yards of material is removed from the South Brunswick River and approximately 300 cubic yards from Lower Turtle River when dredged. The maintenance material removed from the Brunswick Inner Harbor is placed in the Andrews Island Dredged Material Containment Area located adjacent to both the East River and the South Brunswick River. Andrews Island is the only confined upland containment area in the Brunswick Inner Harbor. Advanced maintenance depths and locations for Brunswick Inner Harbor is as follows: East River, 0+000 to 2+500 project depth is 36 with 1 of advanced maintenance East River, 2+500 to 4+500 project depth is 36 with 5 of advanced maintenance East River, 4+500 to 6+250 project depth is 36 with 1 of advanced maintenance East River, Turning Basin project depth is 36 with 1 of advanced maintenance Environmental windows limit the timing of dredging in the Brunswick Inner Harbors. Environmental restrictions on the Brunswick Inner Harbor include a Least Tern nesting window to where dredged material must not be placed in the Andrews Island confined upland disposal area between the middle of April through the middle of August.

More opportunities from Department Of Defense → W074 Endist Savannah

Same awarding agency

NAICS: 236220
New
Federal
Market Intelligence Notice – Child Development Centers (CDC) - Volumetric modular housing, Kit-of-Parts facilities, 3-D Printed
Solicitation # W912HN26MICDC
The U.S. Army Corps of Engineers, Savannah District, is conducting a market intelligence effort to identify industry capabilities for the construction of permanent Child Development Centers (CDC) across multiple military installations. The government is specifically seeking information on modern industrialized construction methods, including volumetric modular housing, Kit-of-Parts facilities, 3-D printing, and hybrid solutions, to improve project schedules, costs, and lifecycle outcomes. All facilities must comply with Department of Defense Unified Facilities Criteria 1-200-01. Forecasted projects include several facilities at Fort Bragg, North Carolina, ranging from a 26,900 square foot center for older children to large centers up to 54,000 square feet, as well as a 41,000 square foot facility at Robins Air Force Base, Georgia. These centers will require comprehensive supporting infrastructure, including outdoor play areas with safety surfacing, commercial kitchens, administrative spaces, and advanced security and energy monitoring systems. This request for information is for planning purposes and does not constitute a formal solicitation. Interested parties must submit a capability statement in PDF format and complete an online survey by November 20, 2026. The government is requesting detailed information on corporate experience, commercial best practices, supply chain logistics for long-lead items, and the ability to integrate complex structural and utility designs across different construction types.
Commercial and Institutional Building Construction

POSTED

about 19 hours ago

DEADLINE

in 23 days
View Details
NAICS: 236220
New
Federal
Market Intelligence: JDWC Progressive Design-Build OTA
Solicitation # W912HN27SA001
The U.S. Army Corps of Engineers Savannah District is seeking market intelligence for the design and construction of the Joint Deployment Warfighting Complex (JDWC) at Fort Bragg, North Carolina. This project will be executed using a Progressive Design-Build delivery method under 10 U.S.C. 2808a Other Transaction authority, with an estimated construction budget of 350 million dollars. The scope involves creating a high-security facility for approximately 750 personnel, featuring secure administrative areas, an operations center, a network operations center, and Sensitive Compartmented Information Facility spaces meeting ICD 705 requirements with RF shielding. Critical infrastructure requirements include advanced wired and wireless networks and fully redundant electrical and mechanical systems capable of providing 14 days of backup power generation. Additionally, the project includes major civil site modifications, such as secure vehicle parking, an antenna pad, and a 0.65-mile extension of the All-American Parkway. The acquisition strategy will utilize a streamlined two-step Qualifications-Based Selection process, beginning with the submission of white papers to shortlist up to three firms, followed by pitch meetings to select the most qualified design-builder. This current notice is for informational and planning purposes only and is not a formal Request for Proposal. Interested parties must submit a capability statement of no more than five pages detailing their bonding capacity and experience with Progressive Design-Build and secure SCIF construction. Electronic submissions in PDF format are due by October 29, 2026, at 4:00 PM Eastern Standard Time to the designated points of contact.
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in about 13 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS