Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

FY26-DDOT-IPMA-DC PLUG Feeder 14007 - Construction

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the undergrounding of PEPCO’s power lines and the installation of new infrastructure to support electrical service for residents across the District of Columbia. This initiative is part of a broader effort to modernize the city’s utility network by relocating overhead power lines beneath the surface, improving both safety and aesthetics in public spaces. The work will involve significant civil and electrical construction activities including trenching, conduit installation, vault construction, and the integration of new distribution facilities to ensure reliable power delivery. The project is forecasted under the District Department of Transportation’s (DDOT) jurisdiction for fiscal year 2026 and will likely require coordination with utility providers, city agencies, and local communities to minimize disruption during construction. The scope implies extensive planning for traffic management, environmental compliance, and public outreach, especially in densely populated neighborhoods. Although formal solicitation details are not yet available, the project is positioned as a strategic infrastructure investment aimed at enhancing resilience, reducing outages, and aligning with the District’s long-term goals for urban development and utility modernization.

General Info

Underground power lines and new infrastructure to modernize DC’s utility network by 2026.

Agency

District of Columbia → Transportation (DDOT)

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDistrict of Columbia → Transportation (DDOT)
ContactsNo contacts available
OfficeN/A
Organization / Agency
District of Columbia → Transportation (DDOT)
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construction undergrounding of PEPCO's power lines and installation of new facilities to service District Residents

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
SLED
FY26-DDOT-IPMA-DC PLUG Feeder 15021- ConstructionThe District of Columbia Department of Transportation is forecasting a construction project aimed at undergrounding PEPCO’s power lines and installing new infrastructure to serve residents across the District. The project, designated as FY26-DDOT-IPMA-DC PLUG Feeder 15021, is scheduled to be posted on July 23, 2026, and represents a broader initiative to modernize the city’s utility network by relocating above-ground electrical facilities underground. This effort is intended to enhance public safety, improve urban aesthetics, and increase the resilience of the power grid against weather-related disruptions. The work will involve significant civil and electrical construction activities, including trenching, conduit installation, transformer placement, and coordination with existing underground utilities, all within publicly accessible areas serviced by PEPCO. The project falls under the jurisdiction of DDOT, with performance expected to occur throughout the District of Columbia, though specific locations have not been detailed. It is classified as a forecasted opportunity, indicating it is in the early planning stages and may be subject to changes in scope, budget, or timeline before formal solicitation. There is no current information regarding set-aside provisions, NAICS code classification, or designated point of contact, suggesting that further details will be released in subsequent updates. Stakeholders and potential contractors should monitor the official DDOT contracts portal for official solicitations, which will include requirements for qualifications, bonding, insurance, and compliance with local and federal construction regulations.
Transportation (DDOT)

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237130
New
SLED
FY26-CI0-TecknomicThe contract titled FY26-CI0-Tecknomic is a forecasted solicitation under the Cable Television, Film, Music and Entertainment office of the District of Columbia, indicating a planned procurement for cable installation support services in the fiscal year 2026. It is positioned as a forecast posting with no solicitation number assigned yet, suggesting it is an early-stage announcement aimed at providing market insight rather than an active bidding opportunity. The posting date is July 23, 2026, and there is no information provided regarding the NAICS code, set aside status, organization type, or specific place of performance, which limits details on eligibility or geographic scope. The agency name indicates the work is related to cable infrastructure within the entertainment and media sector under District of Columbia oversight, but no point of contact details are listed, nor are there any location specifics such as city, state, or zip code for performance. Potential vendors should interpret this as a preparatory notice for anticipated contractual activity, with further details expected to be released in a formal solicitation at a later date. The associated UI link provides the only official reference point for updates, and interested parties should monitor it for future notifications regarding deadlines, requirements, and submission procedures.
Cable Television, Film, Music and Entertainment (OFTE)

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237130
New
Federal
Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety RehabThis solicitation, numbered 1240LU26Q0068, is a combined synopsis and request for quotation under FAR Part 12 for the Seed Orchard Disconnect and Electrical Life Safety Rehab project at the Salmon River Seed Orchard Pump Station in Idaho. The project involves relocating overhead power to underground service, installing a new 400A, 480V, three-phase Type 4 electrical disconnect and mounting post, replacing existing pump controls, and removing outdated electrical infrastructure to resolve hazardous conditions and recurring equipment failures. Work must comply with NFPA 70-2020 (NEC), NESC, NECA standards, and UL requirements, with all materials and equipment meeting applicable codes. The acquisition is a total small business set-aside under NAICS code 237130 with a size standard of $45 million, and only responsible small business concerns may submit quotations. The contract will be awarded on a firm-fixed-price basis, with evaluation based on experience, past performance, and fair and reasonable pricing, with a pass/fail gate requiring pricing for all base items. Performance bonds and payment protection are required at 100% of the contract value if exceeding $150,000, with an irrevocable letter of credit permitted for contracts between $35,000 and $150,000. The period of performance has been revised to run from August 15, 2026, to October 15, 2026, with all work required to be completed by that date. A mandatory site visit is scheduled for July 7, 2026, and contractors are expected to conduct independent site investigations as per FAR 52.236-3. Quotations must include the completed SF-1442, Schedule of Items, Experience Questionnaire (Attachment 7), and acknowledgment of amendments, and must be submitted via email to Daniel Franco at USDA-FS CSA Intermountain 9 no later than July 27, 2026, at 12:00 p.m. Mountain Time. Proposals must comply with all FAR clauses including those related to labor standards, warranties, payment by electronic funds transfer, subcontracting, whistleblower rights, and prohibition on inverted domestic corporations. The contractor is responsible for securing permits, providing third-party inspections, ensuring OSHA compliance, supplying safety equipment including fire extinguishers and first
Csa Intermountain 9 Usda-Fs

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 237130
New
SLED
Pastoria Solar Project by Pastoria Solar Energy, LLCThe Pastoria Solar Project by Pastoria Solar Energy, LLC involves the construction and operation of a solar generation tie line connecting the proposed solar facility to the existing Pastoria Energy Facility Lebec switchyard east of the project site. The project is anticipated to result in incidental take of the blunt-nosed leopard lizard, a fully protected and state-endangered species under California law, with permanent impacts to 0.14 acres and temporary impacts to 1.49 acres of its habitat. All impacts are confined to previously disturbed areas such as established dirt roads, minimizing new disturbances. To comply with state conservation requirements, the permittee will purchase 1.91 acres of Covered Species credits from a California Department of Fish and Wildlife–approved mitigation or conservation bank, ensuring full compensation for habitat loss in accordance with Fish and Game Code section 2081.15. A Minor Amendment No. 1 has been issued to adjust key conditions of approval, including extending the term of the Incidental Take Permit, delaying the deadline for purchasing mitigation credits, and providing additional clarity regarding the procurement and use of bank credits. The project is administered by Kern County as the lead agency, with oversight coordinated through the California Department of Fish and Wildlife, and all environmental compliance measures are designed to align with the California Endangered Species Act and applicable state statutes. The project remains on track to proceed under these adjusted timelines and enhanced mitigation assurances.
Kern County

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 237130
New
SLED
Arastradero Creek Restoration and Pipeline RelocationIn March 2023, the City of Palo Alto responded to an emergency situation involving an exposed eight-inch steel gas pipeline in Arastradero Creek within the Pearson-Arastradero Preserve, triggered by erosion that threatened infrastructure integrity. Under an emergency permit from the U.S. Army Corps of Engineers, the City implemented temporary stabilization measures using cobbles and boulders to shield the gas line and prevent exposure of upstream potable water and sewer pipelines. However, the San Francisco Bay Regional Water Quality Control Board has mandated the removal of all temporary fill and remediation of a six-foot headcut that contributed to the initial damage. To comply with these requirements, the City is now undertaking a comprehensive restoration project that includes relocating the water, wastewater, and gas utilities to safer, deeper positions beneath the creek, thereby eliminating ongoing vulnerability. The project also introduces woody debris downstream to promote natural sediment deposition, widen incised creek sections, and reduce the likelihood of future headcuts forming. Complementing the creek restoration, minor grading work is planned along Arastradero Trail, which runs parallel to the creek’s left bank, to restore proper function to an existing culvert and reduce sediment runoff into the waterway. These improvements aim to enhance trail conditions and long-term infrastructure resilience while aligning with environmental restoration goals. The overall effort is designed not only to meet regulatory obligations set by the Water Quality Control Board but also to reestablish natural hydrologic processes and protect vital utilities from future storm-related damage. The project, forecasted for July 2026, is being coordinated by the City of Palo Alto with support from environmental planning professionals and is focused on achieving sustainable, lasting outcomes for both ecological and public utility infrastructure within the preserve.
City of Palo Alto

POSTED

1 day ago

DEADLINE

N/A
View Details