Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

FY26-DDOT-IPMA-Metropolitan Branch Trail - Blair Rd to Piney Branch Rd NW

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract encompasses the comprehensive engineering design for a multi-use trail extending from Blair Road and Aspen Street NW at its southern terminus to the intersection of Piney Branch Road and Eastern Avenue NW at its northern end, reconnecting two previously segmented sections of the Metropolitan Branch Trail along its western alignment as outlined in the Concept Plan. The scope is extensive, covering all phases of project development including project management, coordination with multiple agencies, and active public engagement to ensure community input is integrated. Technical services include surveying and mapping, right-of-way acquisition support, traffic and utility analyses, geotechnical investigations, and detailed trail and structural design. The project also requires complete stormwater management and sediment control systems, traffic control plans, signing and pavement markings, lighting, and full landscaping integration to meet environmental and aesthetic standards. Cost estimation, construction specifications, and rigorous quality assurance and quality control protocols are mandated to ensure regulatory compliance and long-term durability. The effort is part of a broader initiative by the District Department of Transportation to enhance connectivity, accessibility, and active transportation infrastructure in the city.

General Info

Design and build multi-use trail connecting Blair Road to Eastern Avenue NW with full engineering, environmental, and public engagement services.

Agency

District of Columbia → Transportation (DDOT)

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDistrict of Columbia → Transportation (DDOT)
ContactsNo contacts available
OfficeN/A
Organization / Agency
District of Columbia → Transportation (DDOT)
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Work under this too consists of the construction engineering design of a multi-use trail from Blair Rd and Aspen St, NW, at the southern end of the study area, to the intersection of Piney Branch Road and Eastern Avenue, NW, at the northern end of the study area. The project connects two sections of the Metropolitan Branch Trail that follow the western alignment in the Metropolitan Branch Trail Concept Plan. The scope of work includes project management, agency coordination, public involvement, survey and mapping, right of way services, traffic studies, utility mapping, geotechnical services, trail design, structural engineering, storm drainage, stormwater management, sediment control, traffic control (MOT), signing and pavement markings, lighting, traffic engineering, landscaping, cost estimates for construction, specifications and QA/QC.

Similar Contracts

Same NAICS industry code