Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

FY26-DDOT-IPMA-Metropolitan Branch Trail - Blair Rd to Piney Branch Rd NW

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The District of Columbia Department of Transportation is forecasting a construction engineering design project for a multi-use trail connecting Blair Road and Aspen Street NW to the intersection of Piney Branch Road and Eastern Avenue NW. This initiative aims to link two existing sections of the Metropolitan Branch Trail in accordance with the western alignment outlined in the Metropolitan Branch Trail Concept Plan. The comprehensive scope of work encompasses all phases of design and planning, including project management, agency coordination, public involvement, and right of way services. Technical requirements include survey and mapping, geotechnical services, utility mapping, structural engineering, and storm drainage and management. Additionally, the contract covers traffic engineering, lighting, landscaping, signing, pavement markings, and the development of construction cost estimates and specifications.

General Info

DDOT design project for a multi-use trail connecting Metropolitan Branch Trail sections.

Agency

District of Columbia → Transportation (DDOT)

Place of Performance

DC, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDistrict of Columbia → Transportation (DDOT)
ContactsNo contacts available
OfficeDC
Organization / Agency
District of Columbia → Transportation (DDOT)
Office AddressDC
ContactsNo contact information available

Full Description

Show more
Work under this too consists of the construction engineering design of a multi-use trail from Blair Rd and Aspen St, NW, at the southern end of the study area, to the intersection of Piney Branch Road and Eastern Avenue, NW, at the northern end of the study area. The project connects two sections of the Metropolitan Branch Trail that follow the western alignment in the Metropolitan Branch Trail Concept Plan. The scope of work includes project management, agency coordination, public involvement, survey and mapping, right of way services, traffic studies, utility mapping, geotechnical services, trail design, structural engineering, storm drainage, stormwater management, sediment control, traffic control (MOT), signing and pavement markings, lighting, traffic engineering, landscaping, cost estimates for construction, specifications and QA/QC.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS