Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Gavins Point Crane Rail Replacement

Active
W9128F26RA023Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → W071 Endist OmahaView Agency

NAICS

238120 - Structural Steel and Precast Concrete ContractorsView NAICS

Place of Performance

NE, 68730

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts1 person available
OfficeOMAHA, NE, 68102-4901, USA
Organization / Agency
Department Of Defense → W071 Endist Omaha
View Agency Profile
Office AddressOMAHA, NE, 68102-4901, USA

Full Description

Show more
On or about 10 August 2026, the Government intends to issue a solicitation for Gavins Point Crane Rail Replacement. The solicitation will close on or about 29 September 2026. The solicitation is Unrestricted and Open to Both Large and Small Business Participation. A Site Visit will be scheduled and additional information regarding the site visit will be provided in the solicitation via FAR Clause 52.236-27. The site visit is tentatively scheduled for 26 August 2026.This project will involve removal and replacement of the Gavins Point Powerhouse Intake crane runway rail located near Yankton, South Dakota. The 80-ton Gavins Point Intake Gantry Crane rail shall be installed and aligned to Crane Manufacturers Association of America, CMAA 70 standards.The total length of the rails is 328 ft x 2 centerline of rail to the powerhouse wall. The work will include an initial survey of the rail alignment, existing grout pocket condition, demolition and removal of existing intake crane rail and components, rail clips, asphalt, base plates, and non-shrink grout. Demolition and removal of the existing concrete anchors will be based on the concrete imaging reports, and the grout pocket condition assessment between each anchor pair along the deck. For bidding purposes, it is assumed 80 percent of the existing anchors will be replaced and all concrete anchors at joint bars will be replaced. The contractor will provide anchors suitable for use in cracked concrete and under seismic loading. Once the rail and hardware are replaced and aligned to the required standards the grout pockets will be filled with two-component aliphatic polyurethane elastomer grout along the full length of the intake crane runway as shown on the drawings. The sequencing of demolition and installation of the crane rails must minimize project time without an operational intake crane and typically progress from one side of the dam to the other with the transfer of the crane from old to new rail during completion of the final rail segment. The Contractor will be required to commence work upon receipt of contract award and complete the work 360 calendar days after receipt of Notice to Proceed, this is subject to change after solicitation issuance. The estimated construction cost of this project is between $1,000,000 and $5,000,000. The Primary North American Industry Classification System (NAICS) code anticipated for solicitation is 238120 ? Structural Steel and Precast Concrete Contractors, with a size standard for Small Business of $19M. All questions shall be submitted on ProjNet (ProjNet access, and additional guidance, will be given at time of solicitation issuance). The Contracting Office is USACE Omaha District, 1616 Capital Ave, Omaha, NE 68102. The Place of Performance is Gavins Point Project, Crofton, NE 68730.

Similar Contracts

Same NAICS industry code

NAICS: 238120
New
SLED
Park City Ice Arena Rooftop Mechanical Support ImprovementsPark City Municipal Corporation is soliciting bids for structural steel support upgrades and related mechanical disconnect and reconnect services for rooftop equipment at the Park City Ice Arena. The project requires qualified bidders to assess, modify, and reinforce the existing structural framework to safely support mechanical units, ensuring compliance with safety and operational standards. All work must be performed with minimal disruption to facility operations, and bidders are expected to coordinate closely with existing systems during disconnect and reconnection phases. Attendance at the mandatory pre-bid meeting on August 14, 2026, at 9:00 a.m. at 600 Gillmor Way, Park City, UT, is strongly encouraged to clarify scope, site conditions, and expectations. Reasonable accommodations for the meeting must be requested at least 48 hours in advance. The solicitation, designated PCMC27010 - ICE, was posted on July 23, 2026, and bids are due by 9:00 p.m. Mountain Time on August 20, 2026. The contract is open to all qualified contractors without specific set-aside classifications and is being managed by the Utah agency. Proposals must demonstrate technical capability, experience with similar structural and mechanical retrofit projects, and adherence to local building and safety codes. All work will be performed on-site at the Park City Ice Arena, and bidders are strongly advised to conduct a thorough site inspection prior to submission. The full solicitation details and submission instructions are available through the provided online portal.
Utah

POSTED

about 22 hours ago

DEADLINE

in 27 days
View Details

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 238220
New
Federal
Gavins Point Powerhouse Drain RehabThe U.S. Army Corps of Engineers, Omaha District, is soliciting bids for the Gavins Point Powerhouse Drain Rehab project under solicitation number W9128F26QA054, which is restricted entirely to small businesses as a total set-aside under FAR 19.5 and NAICS code 238220, with a size standard of $19 million. The project involves the rehabilitation of 3-inch, 4-inch, and 6-inch diameter drain lines located on the B-Floor of the Gavins Point Dam powerhouse in Crofton, Nebraska, including the removal of a lodged pipe snake cutter head, mechanical cleaning, CCTV inspections, and installation of Cured-In-Place Pipe (CIPP) lining. The estimated total length of piping to be rehabilitated is 430 feet, with work to be completed within 120 calendar days after receipt of the Notice to Proceed. The estimated cost of the project falls between $100,000 and $250,000, and all pricing must be submitted as firm fixed price for four distinct CLINs covering site setup, inspection and cleaning, liner installation and quality control, and restoration and demobilization. Offers must be submitted electronically as a single PDF document not exceeding 25 pages, excluding the price worksheet, and are due by 7:00 PM Eastern Time on July 28, 2026, following multiple amendments that extended the deadline from June 19 to July 1, and ultimately to July 28. All proposals must be emailed to Brianna Wohlers at Brianna.N.Wohlers@usace.army.mil, and must include full compliance with FAR clauses including 52.212-1 and 52.212-2, which now permit the inclusion of past performance data from subcontractors under binding agreements. Offerors must maintain an active SAM registration with up-to-date electronic representations and certifications, and must comply with stringent requirements including security protocols, identity verification for unescorted site access with a seven-year criminal background check, adherence to USACE EM 385-1-1 safety standards, and submission of a detailed Quality Control Plan and daily CQC reports. Additional obligations include maintaining $1 million in general liability insurance, providing either a payment bond or irrevocable letter of credit, managing wastewater and hazardous materials in sealed containers per environmental regulations
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 237310
New
Federal
Repair/Replace Mass Parking Apron Section V at Minot AFB North DakotaThe Government plans to issue a solicitation on or about June 25, 2026, for the repair and replacement of Section V of the Mass Parking Apron at Minot Air Force Base in North Dakota, with the solicitation closing 30 days after issuance. This project is exclusively reserved for small businesses under a total small business set-aside, classified under NAICS code 237310. The work will follow a design-bid-build delivery method and involves removing and replacing a section of the existing Mass Parking Apron to achieve a uniform width of 340 feet south of the centerline taxiway, correcting an existing discrepancy where the eastern half is five feet narrower than the western half. New temporary asphalt concrete transitions will be constructed to seamlessly connect the newly poured Portland cement concrete pavement with the remaining existing pavement, accommodating minor grade differences. Adjacent turf areas will undergo limited grading to enhance drainage, ensuring a 1.5-inch drop-off at the paved shoulder edges in compliance with UFC 3-260-01. Existing asphalt shoulders slated for removal will be milled by the contractor and stockpiled for future reuse by Minot AFB. The estimated cost of construction falls between $25 million and $35 million. The solicitation, identified as W9128F26RA107, is managed by the U.S. Army Corps of Engineers Omaha District, with Shayna Zeleznik listed as the primary point of contact.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 27 days
View Details