GBC - Replace Boilers at Great Basin College, Elko Campus
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
All bid submissions for solicitations such as ITBs, RFPs, RFQs, or CMARs must now be made electronically through the designated website, as BCN Purchasing no longer accepts hard copy documents. Vendors are required to register with the NSHE Supplier Registration system to facilitate payments, with a one-time registration process that can be verified or completed via provided links. Bidders can begin preparing responses once solicitations are released, utilizing the system's save feature to ensure timely submission of all required documents before the closing deadline. After the bid deadline, responses are unsealed and publicly posted online, allowing for transparency and review of bid tabulations. The project involves replacing boilers and pumps at the GBC Elko Theater and Health Science Buildings, classified as a prevailing wage project with an estimated cost between $270,000 and $370,000. It is scheduled to commence around May 27, 2024, and must be completed by August 16, 2024, with liquidated damages of $500 per day for delays. Contractors awarded the project are required to carry specific insurance coverages, including builders risk, general liability, automobile liability, and workers’ compensation, in accordance with the detailed limits provided in the contract templates. The project is managed by the University of Nevada, Reno, with Ryan Caddel serving as the primary contact for inquiries.
General Info
Place of Performance
NV, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
**NSHE recently migrated to a new payment system that requires all of our vendors register with the system in order for our Controllers office to allow us to pay you. Please visit the following link for the NSHE Supplier Registration system to sign up for a new account: https://suppliers.nevada.edu/Membership/Secure/CreateUser.aspx. This process only needs to be completed once. If you believe you already have an account set up please confirm by searching for your company at this link: https://suppliers.nevada.edu/FindSupplier.aspx. If your company is listed and shows the Supplier Status as anything other than “Accepted” then there are still steps that must be completed before your registration is approved.
**Once an ITB/RFP/RFQ/CMAR is released for bidding, bidders may begin working on their response and uploading required documents without submitting their bid early. The NGEM system allows for bidders to save their work. Please make use of this capability in order to give your company enough time to review your response and upload any other documents on the day the ITB/RFP/RFQ/CMAR closes so that you do not miss the cut-off time.
**Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be immediately posted online and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there.
Description of Work: This is a prevailing wage project. Replace boilers and pumps at the GBC Elko Theater and Health Science Buildings.
GBC Project#: #23RPR02580 Labor Commissioner #: EL-2024-238 SPWD Project #24-B013 Estimated Cost Range: $270,000 to 370,000 Liquidated Damages: $500/day Required Insurance if Awarded: Builders Risk Insurance, Commercial General Liability, Business Automobile Liability, and Workers' Compensation insurance will be required. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth here: https://www.unr.edu/bcn-nshe/risk/contracts. Completion of Work: Subject to change by Owner, Work is scheduled to begin on "May 27, 2024" and shall be fully complete by "August 16, 2024."
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS