This Solicitation opportunity from Georgia was posted on March 28, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract involves providing general contractor services for the construction of a capital improvement project at Clarkston High School, managed by the DeKalb County School District in Georgia. The project is solicited under RFP 24-752-022 Addendum 4, with a response deadline set for May 23, 2024. The scope includes overseeing the construction activities necessary to enhance the school's facilities as part of the district’s capital improvement initiatives. The contract is associated with NAICS code 236220, indicating it pertains to commercial and institutional building construction.
Interested contractors are encouraged to review the detailed solicitation and submit their proposals by the specified deadline. The primary point of contact for inquiries is Tijauna Naylor Smith, reachable via email at [email hidden] or by phone at [phone hidden]. The project is located within Georgia, and further details about the solicitation and project requirements can be accessed through the provided online link. This contract aims to ensure the successful completion of the construction project, adhering to the district’s standards and schedules.
PDF, High priority: read this first1 page · specifications
HighAI Summary for AATL180014 - Clarkston High School Renovation & Addition - Sheet A6.01: Door Schedule, Legend, and Details for the Clarkston High School Renovation & Addition (GMC # AATL180014). This document, dated 4/23/2024 as Addendum #1, provides technical specifications for door and frame types, materials (HM, WD, AL), dimensions, and hardware sets, including a detailed door schedule for specific rooms.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 1 - Clarkston HS Modifications: Issued April 25, 2024, this architect's addendum modifies the bid and construction documents for the Clarkston HS Modifications project in DeKalb County, GA. It includes revisions to drawings (sheets G1.01, A4.01, and A6.01) and adds five new specification sections covering masonry, roofing, door hardware, metal building systems, and wheelchair lifts.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 1 for RFP 24-752-022 GC Services Clarkston High School: Addendum No. 1 dated April 15, 2024, modifies the Request for Proposals (RFP No. 24-752-022) for GC Services for Clarkston High School Capital Improvements. It clarifies that the proposal due date remains May 2, 2024, at 2:00 PM local time, but submission must now be electronic via the DCSD IONWAVE portal. The addendum outlines the electronic submission steps and confirms that final questions are due April 17, 2024, with a final addendum expected by April 24, 2024. Attachments include meeting minutes and a site visit sign-in sheet.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Clarkston High School Renovation & Addition - Sheet G1.01: Index of Drawings and Abbreviations (Sheet G1.01) for the Clarkston High School Renovation & Addition project, dated 04/23/2024. The document provides a comprehensive list of architectural, structural, mechanical, plumbing, and electrical drawing sheets and a detailed legend of construction abbreviations.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Clarkston High School Renovation - Sheet A4.01 (Addendum #1): Architectural drawing sheet A4.01 dated 4/23/2024 for the Clarkston High School Renovation & Addition. This document is part of Addendum #1 and includes enlarged floor plans, interior and exterior elevations, and detailed sections for the main entry, secure vestibule, and check-in desks, including material specifications such as glazed CMU block and solid surface countertops.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 24-752-022 Addendum No. 2 - Clarkston High School Capital Improvements: Addendum No. 2 dated April 24, 2024, for RFP 24-752-022 regarding GC Services for Clarkston High School Capital Improvements. This document modifies the proposal due date to May 23, 2024, at 2:00 PM, updates the final question deadline to May 8, 2024, and sets the final addendum date for May 15, 2024. It also provides detailed electronic submission instructions via the IONWAVE portal.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 24-752-022 Addendum No. 3 - Clarkston High School Capital Improvements: Addendum No. 3 dated April 25, 2024, for RFP 24-752-022 regarding GC Services for Clarkston High School Capital Improvements. It confirms the proposal due date of May 23, 2024, and the question deadline of May 8, 2024. Key modifications include the replacement of Attachment I (Fixed Price Proposal), the incorporation of Architect's Addendum No. 1, and the addition of revised architectural sheets and technical specifications for masonry, roofing, hardware, metal building systems, and wheelchair lifts.
PDF
PDF, High priority: read this firstrfp-appendices
HighAI Summary for RFP 24-752-022 Appendices Package - Clarkston High School Capital Improvements: This document is an appendix package for RFP 24-752-022 concerning capital improvements at Clarkston High School under DCSD Project No. 213-35. Dated 3/21/2024, it outlines the owner's criteria and narrative scope of work including new construction tasks such as security vestibule, elevator addition, restroom addition, athletic storage building, and stage lift. It details bidder responsibilities including compliance with laws, coordination with DCSD, permits, site conditions, damage repair, waste disposal, and warranty. The document specifies project timelines with mobilization by September 2, 2024, substantial completion by June 24, 2025, and final completion within 30 days thereafter. It also covers communication protocols, time computation, FF&E coordination, and use of Proliance project management software for documentation and invoicing.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 24-752-022 for General Contractor Services for Clarkston HS Capital Improvements: This Request for Proposals (RFP) No. 24-752-022 issued by DeKalb County School District on March 28, 2024, solicits proposals for General Contractor services for the Clarkston High School Capital Improvement project. The document includes a detailed solicitation timeline with key dates such as the virtual mandatory pre-proposal conference on April 11, 2024, mandatory site visit on April 12, 2024, and proposal due date on May 2, 2024. It outlines the scope of services, instructions for proposers, qualifications, protest process, and includes various owner standard forms and project-specific appendices. Plans and specifications are available upon request. The RFP emphasizes compliance with submission instructions and prohibits communication with the owner outside the specified process until contract award.
PDF
PDF, High priority: read this firstpresolicitation
HighAI Summary for RFP 24-752-022 Mandatory Pre-Submittal Conference Meeting Minutes: This document contains the Mandatory Pre-Proposal Conference Meeting Minutes for RFP 24-752-022 regarding General Contractor Services at Clarkston High School Capital Improvements. Dated April 11, 2024, it outlines proposal submission requirements, contract form, bond requirements, background checks, selection process, Q&A, site visit details, and scope of work. The meeting included introductions, attendance verification, and discussion of key project and submission details to assist prospective contractors in preparing their proposals.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for RFP 24-752-022 Revised Attachment I General Contractor Fixed Price Proposal: Revision 1 of the Bid Form for DeKalb County Board of Education Project No. 213-35 (RFP No. 24-752-022) regarding Clarkston High School Capital Improvements. The document provides a structured template for contractors to submit a fixed-price proposal, including a detailed breakdown of costs by division, a voluntary deduct/add section, and a lump-sum allowance schedule totaling $224,000.00 for relocation, cleaning, and door hardware.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 042000 Unit Masonry Specifications: Technical specifications for unit masonry assemblies, including concrete masonry units, brick, mortar, grout, and reinforcing steel. The document outlines performance requirements for compressive strength, fire-resistance ratings, detailed submittal requirements for product data and shop drawings, and quality assurance standards for testing agencies and source limitations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 074114 Standing-Seam Metal Roof Panels Specifications: Technical specifications for Section 074114 regarding standing-seam metal roof panel systems. The document details performance requirements (wind loads, water penetration, and thermal movement), submittal requirements (shop drawings, structural analysis, and samples), quality assurance standards, and delivery/storage protocols.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 087100 Door Hardware Specifications: Technical specifications for Section 087100 Door Hardware, detailing requirements for fire-rated door hardware, lock cylinders, thresholds, and weatherstripping. The document outlines reference standards (ADA, ASTM, BHMA, NFPA, UL), administrative requirements for preinstallation and keying meetings, and comprehensive submittal requirements including product data, shop drawings, and warranties.
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.