Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on July 13, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

General Instruction Building (GIB) Carlisle Barracks, PA

Closed
W912DR22R0PN2Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 14 hours ago

DEADLINE

in 14 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

Carlisle, PA, 17013, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist Baltimore
Contacts1 person available
OfficeBALTIMORE, MD, 21201-2526, USA
Office AddressBALTIMORE, MD, 21201-2526, USA

Full Description

Show more
This Notice is being published in accordance with Federal Acquisition Regulation (FAR) requiring the dissemination of information on proposed contract actions. This is a notice of intent to award a sole-source contract. The statutory authority for this sole-source procurement is 10 United States Code 2304(c)(1) as implemented in Federal Acquisition Regulation 6.302-1(a)(2)(iii)(B), - Only one responsible source and no other supplies or services will satisfy agency requirements. The United States Army Corps of Engineers (USACE) Baltimore District (NAB) intends to solicit and award a Firm-Fixed-Price Sole Source Contract to Wiley & Wilson, Inc to design and construct a General Instruction Building (GIB) to support the (USAWC) at Carlisle Barracks, Pennsylvania. The new academic facility will meet all Army Standards and GIB Standard Design Criteria. The A-E shall provide all necessary services required to continue support to the construction field office during the currently ongoing construction period. Construction Phase Services: The A-E shall provide 2,000 hours of technical assistance to the Area/Resident Engineer and their staff, as requested by them in writing for the duration of the construction period. These requests will not come from the COR but rather the USACE Construction Division staff. This assistance will include, but not be limited to, the following tasks: Review of submittals; Site visits during construction; Attendance at meetings, which may include the pre-work conference and design progress meetings with the contractor; Responses to requests for information (RFIs) to assist Baltimore District; For projects with stormwater management construction, attend SWM preconstruction meeting and provide on site inspections during SWM installation. Review the contractor's interim and final SWM as-built certification submittals prior to their submission to the permitting authority. Provide comments and/or recommendations to the Area/Resident Engineer for approval or disapproval of these submittals. Reviews of special construction techniques, methods, and procedures and annotate available documentation to provide recommendations for approval or disapproval; Additional design-related services for User-requested changes. Note: The A-E will not be compensated for construction phase support required to correct errors or omissions in the design documents. Technical Assistance shall be task-specific and rendered only after receipt of a written request from the Area/Resident Engineer and their staff. The A-E shall document the effort expended for each Technical Assistance task in the summary of work included with their invoices. Construction Phase Services OPTION I (OPTION): The A-E shall provide 1,000 hours of technical assistance to the Area/Resident Engineer and their staff, as requested by them in writing for the duration of the construction period. These requests will not come from the COR but rather the USACE Construction Division staff. This assistance will include, but not be limited to, the following tasks: Review of submittals; Site visits during construction; Attendance at meetings, which may include the pre-work conference and design progress meetings with the contractor; Responses to requests for information (RFIs) to assist Baltimore District; For projects with stormwater management construction, attend SWM preconstruction meeting and provide on site inspections during SWM installation. Review the contractor's interim and final SWM as-built certification submittals prior to their submission to the permitting authority. Provide comments and/or recommendations to the Area/Resident Engineer for approval or disapproval of these submittals. Reviews of special construction techniques, methods, and procedures and annotate available documentation to provide recommendations for approval or disapproval; Additional design-related services for Use-requested changes. Note: The A-E will not be compensated for construction phase support required to correct errors or omissions in the design documents. Technical Assistance shall be task specific and rendered only after receipt of a written request from the Area/Resident Engineer and their staff. The A-E shall document the effort expended for each Technical Assistance task in the summary of work included with their invoices. Construction Phase Services OPTION II (OPTION): The A-E shall provide 1,000 hours of technical assistance to the Area/Resident Engineer and their staff, as requested by them in writing for the duration of the construction period. These requests will not come from the COR but rather the USACE Construction Division staff. This assistance will include, but not be limited to, the following tasks: Review of submittals; Site visits during construction; Attendance at meetings, which may include the pre-work conference and design progress meetings with the contractor; Responses to requests for information (RFIs) to assist Baltimore District; For projects with stormwater management construction, attend SWM preconstruction meeting and provide on site inspections during SWM installation. Review the contractor's interim and final SWM as-built certification submittals prior to their submission to the permitting authority. Provide comments and/or recommendations to the Area/Resident Engineer for approval or disapproval of these submittals. Reviews of special construction techniques, methods, and procedures and annotate available documentation to provide recommendations for approval or disapproval; Additional design-related services for Use-requested changes. Note: The A-E will not be compensated for construction phase support required to correct errors or omissions in the design documents. Technical Assistance shall be task specific and rendered only after receipt of a written request from the Area/Resident Engineer and their staff. The A-E shall document the effort expended for each Technical Assistance task in the summary of work included with their invoices.

More opportunities from Department Of Defense → W2SD Endist Baltimore

Same awarding agency

NAICS: 531120
New
Federal
U.S. Corps Marine Career Center- Huntington, WV
Solicitation # W912QR-27-Huntington-WV
The Baltimore District of the U.S. Army Corps of Engineers is soliciting lease proposals for approximately 1,271 usable square feet of commercial retail space for the U.S. Corps Marine Career Center. The desired location is within a one-mile radius of 901 4th Avenue, Huntington, West Virginia. Requirements for the space include a secondary egress and adequate parking for two government vehicles for both day and overnight use. Proposals must include the proposed rental amount, encompassing common area maintenance, taxes, and insurance, and are due by 5:00 pm on October 30, 2026. The selected lessor will be responsible for initial alterations, including the removal of abandoned cabling and fixtures, and must ensure the premises comply with the Architectural Barriers Act Accessibility Standard and applicable life safety codes such as NFPA 101 or the International Building Code. The lessor is required to maintain public liability and property damage insurance with a combined limit of at least 1,000,000 dollars, as well as fire and extended coverage insurance for the full replacement value of the building. Acceptance of the space is contingent upon a final inspection and the issuance of a valid Certificate of Occupancy. All prospective contractors must be registered in the System for Award Management with a Unique Entity Identifier and a notarized letter appointing an authorized Entity Administrator to ensure eligibility for award and electronic funds transfer payments.
Lessors of Nonresidential Buildings (except Miniwarehouses)

POSTED

6 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS