Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Energy was posted on May 15, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

General Rigging Services Fermilab

Closed
DS-356544-RKFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238290
New
Centennial JCC Panic Hardware Services (Electrical Room Egress Doors)
Solicitation # Panic Hardware (Electrical Room Egress Doors)
Management & Training Corporation (MTC) is soliciting bids for the installation of commercial-grade panic hardware on electrical room egress doors at the Centennial Job Corps Center in Nampa, Idaho. The scope of work includes conducting site surveys to verify door dimensions and fire ratings, procuring Grade I heavy-duty panic bars, exterior trim, rim cylinders, strikes, and door closers, and performing installation and testing. All work must adhere to NEC 2023 Article 110.26(C)(3), NFPA 101 Life Safety Code, and ADA standards. To ensure fail-safe operation, contractors must perform at least 10 consecutive cycle tests on all installed hardware. This is a fee-for-service subcontracting opportunity open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities under NAICS code 238290. Bidders must be licensed in the State of Idaho and provide three references for similar projects. Required submission documents include a completed bid sheet with lump sum and individual deficiency pricing, a W-9, a self-certification form, and acceptance of terms and conditions. All bids must be submitted via email to Sandra Clore by December 1, 2026, at 3:00pm MST. The contract is subject to various federal regulations, including the Davis-Bacon Act for prevailing wage rates and fringe benefits, as well as FAR clauses regarding Buy American preferences and combating trafficking in persons. Contractors are required to comply with DOL records management, mandatory training, and privacy breach notification requirements. Payment will be issued upon the submission of invoices for materials and services that have been delivered and accepted by MTC. Final inspection and acceptance will occur at the MTC designated point of delivery.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 238290
New
SLED
Pauma Security Gate
Solicitation # 2026-27-06
Solicitation 2026-27-06 for the Valley Center Pauma Unified School District involves the fabrication and installation of automated, keypad-entry hinging steel security swing gates at entry and egress driveways in Valley Center, California. The project requires two powder-coated steel double swing gates, each 18 feet wide by 5 feet tall, and explicitly prohibits the use of chain link options. Key technical components include a mounted Knox switch with Fire Department filing, two entry remotes, gate hold timers, a mounted strobe detector for emergency vehicles, and a keypad similar to the Door King 1506-086. The contract value is capped at 1,000,000 dollars, and the award will be granted to the lowest responsive and responsible bidder. Eligible bidders must hold a California contractor's license C13 or C-61/D28 and comply with prevailing wage requirements and Department of Industrial Relations registration. The project mandates a payment bond for 100 percent of the total bid price and a DVBE participation goal of at least 3 percent. Required submissions include a comprehensive bid packet featuring non-collusion affidavits, Iran Contracting Act certification, and fingerprinting certifications. Performance must be coordinated with the Director of Maintenance and Operations, with work hours restricted to 7:00 am to 5:00 pm, Monday through Friday. Additionally, contractors must adhere to strict hazardous material standards and California Air Resources Board compliance, with the district maintaining the right to terminate the agreement upon 30 calendar days written notice.
Valley Center Pauma USD

POSTED

about 22 hours ago

DEADLINE

in 4 days

General Info

NAICS

238290 - Other Building Equipment Contractors

Place of Performance

Batavia, IL, 60510, USA

Set-Aside

SBA

Documents

20

Amendment 01 - Fermilab Rigging Operations (ISD-356544-RK)

PDF, High priority: read this first2 pages · amendment
High

Amendment No. 02 - Fermilab Rigging Operations (ISD-356544-RK)

PDF, High priority: read this first2 pages · amendment
High

Exhibit B - 2022 Construction Insurance Requirements

PDF, High priority: read this first3 pages · specifications
High

FAR 52.219-9 Small Business Subcontracting Plan

PDF, High priority: read this first18 pages · specifications
High

FRA ES&H Requirements Section 013100 (March 2022)

PDF, High priority: read this first45 pages · specifications
High

FRA General Terms and Conditions for Construction (03.2024)

PDF, High priority: read this first24 pages · contract-document
High

General Rigging Services Statement of Work

PDF, High priority: read this first4 pages · sow
High

Proposal Certifications Form PUR-466 Rev 1

PDF, High priority: read this first9 pages · supporting-documents
High

RFP ISD-356544-RK: Fermilab Rigging Operations

PDF, High priority: read this firstrfp
High

Rigging Equipment Standard Conventions 2024 v2

PDF, High priority: read this firstsow
High

Sample Subcontract - Rigging and Related Services (Project ISD-356544-RK)

PDF, High priority: read this first6 pages · contract-document
High

Section 010010 - General Requirements (Sample)

PDF, High priority: read this first19 pages · specifications
High

Summary of Required Solicitation Documents - General Construction Rigging Management

PDF, High priority: read this first2 pages · specifications
High

Wage Determination IL20240008

PDF, High priority: read this first38 pages · wage-determination
High

Exhibit G - Fermilab Subcontractor Safety Information Questionnaire

PDF, Low prioritypast-performance
Low

Fermi Research Alliance Subcontractor Annual Representations & Certifications (SARC)

PDF, Low prioritypast-performance
Low

FRA Form FL-40 Performance Bond

PDF, Low priority2 pages · performance-bond
Low

FRA Form FL-41 Bid Bond

PDF, Low priority2 pages · bid-bond
Low

FRA Form FL-42 Payment Bond

PDF, Low priority2 pages · payment-bond
Low

Standard Form 1413 - Statement and Acknowledgment

PDF, Low priority1 page · contract-document
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from May 10, 2024 to May 31, 2024.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
Contacts1 person available
OfficeBatavia, IL, 60510, USA
Office AddressBatavia, IL, 60510, USA

Full Description

Show more
The Subcontractor shall furnish all properly qualified management, supervision, personnel, materials, supplies, tools, transportation, and equipment with appropriate accessories (except as provided by FRA) and shall plan, schedule, coordinate and assure effective performance of all services described herein. The Subcontractor shall perform operations, maintenance, installation, testing and certification, connection, disconnection, alteration, renovation, renewal, replacement, improvement or upgrade, demolition and/or removal, component fabrication, testing and/or troubleshooting, setting and alignment and installation of material or experimental equipment, system or component commissioning, loading, unloading, preparation for shipping or receiving materials, and other related services of the Rigging trade covered by the Davis Bacon Act. Requested work may include emergency response and related tasks to operate, repair, restore service, and maintain Fermilab facilities or equipment, or other assistance to provide operational capabilities. The Subcontractor shall furnish materials, supplies, tools, and equipment including accessories, fuels, lubricants, filters, bits, blades, bulbs, and other consumables or disposables. Example of types of General rigging trade service tasks that may be awarded include: - Removal and installation of beamline components, collimators, and other large physics equipment - Removal and installation of shielding blocks, steel, and cement - Utilization of mobile crane (when appropriate) - General machinery moving and machinery moving of unique equipment. - Rigging specialty tanks and containers - Selection appropriate rigging equipment based on weight and dimensions of the scientific equipment. - Lift and transport the equipment to the designated location. Time and materials Task Releases shall not exceed $249,999. Based on historical data, FRA may issue approximately fifteen (15) Releases per year with a potential aggregate annual value in the range of One Hundred Thousand Dollars ($100,000) to Two Hundred Thousand Dollars ($200,000). This estimate is provided for planning purposes only and does not constitute a commitment on the FRA's part. Notwithstanding the foregoing, the successful Offeror is not guaranteed any minimum dollar amount per year under this contract.

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 332323
New
Federal
Bar Grating and Saddle Clips
Solicitation # 388000kmb
Fermi Forward Discovery Group, LLC is soliciting firm-fixed price proposals under RFP 388000kmb for the fabrication and delivery of hot-dipped galvanized carbon steel bar grating and associated saddle clips. These materials are required for the VD Cryostat Roof Decking as part of the LBNF/DUNE project. The scope includes various sizes of bar grating with bearing bars measuring 1.5 inches tall by 3/16 inches thick and 19-W-4 spacing, along with Type W44 and W10 saddle clips. Technical requirements specify a minimum live load of 100 PSF, a minimum concentrated load of 1000 LB, and a maximum deflection of 0.25 inches. Proposals must be submitted via email to Karen Berger by 5:00 PM CT on November 6, 2026. A complete submission package requires a proposal including lead times, a completed first page of the RFP, the Subcontractor Annual Representations and Certifications (SARC), and the PROC-FRM-466 Proposal Certifications. Award will be based on the Lowest Price Technically Acceptable (LPTA) selection process, with a strong emphasis on strict adherence to technical specifications and FFDG terms and conditions to avoid disqualification. Delivery is required FOB Destination to the Dakota Warehouse in Rapid City, South Dakota. All items must be bundled and packaged to comply with the Ross Shaft Load Envelopes and Shipping Expectation guidelines to ensure compatibility with warehouse handling capabilities. Post-award deliverables include a detailed logistics and shipping plan and all applicable operator manuals. The contract is subject to various federal regulations, including Buy American requirements and FAR anti-discrimination laws.
Ornamental and Architectural Metal Work Manufacturing

POSTED

6 days ago

DEADLINE

in 8 days
View Details
NAICS: 332911
New
Federal
PIP-II CM 2K Pressure Safety Device - Rupture Disks
Solicitation # 387878-DSF
Fermi Forward Discovery Group, LLC, operating the Fermi National Accelerator Laboratory (Fermilab), is soliciting firm-fixed price proposals under solicitation 387878-DSF for the procurement of thirty-three cryogenic non-reclosable rupture disk cartridges. These components are required for the Proton Improvement Plan II (PIP-II) Cryomodule relief system and must be designed for sub-atmospheric cryogenic conditions of approximately 2 K and 30 mbar absolute pressure. The requirement includes disks with set pressures of 3.1 barg and 1.75 barg, constructed from Inconel, and equipped with normally closed burst alert sensors on the outlet. All disks must be ASME Section VIII Code NB/UD stamped and meet a helium leak rate specification of 10^-8 atm-cc/sec. Proposals must be submitted via email to Seth Fryar by October 30, 2026, at 2:00 PM Central Time. Submissions must include a technical proposal demonstrating merit and five years of relevant experience, a delivery schedule, and a price proposal using the provided Exhibit F pricing sheet. Award will be granted to the lowest evaluated proposal that meets all technical and past performance acceptability standards. The contract requires strict adherence to various federal regulations, including the Buy American Act, FAR anti-discrimination laws, and DOE site access and safety requirements. Delivery is FOB Destination to Batavia, Illinois, where Fermilab will conduct visual, mechanical, and certification inspections within two weeks of receipt.
Industrial Valve Manufacturing

POSTED

6 days ago

DEADLINE

in 1 day
View Details
NAICS: 331491
Federal
PIP-II Niobium Sheets, Rings, and Disks
Solicitation # 385634-DSF
Fermi National Accelerator Laboratory (FNAL), through the Fermi Forward Discovery Group, LLC, is soliciting firm-fixed price proposals for the manufacturing, testing, certification, and delivery of high-purity Niobium and Niobium-Alloy components. These materials, which include RRR300 Niobium sheets, Nb55Ti rings and disks, and forged Niobium rings, are critical for superconducting radio-frequency cavities used in the Proton Improvement Plan II (PIP-II) project. All deliverables must adhere to strict technical specifications, including a Residual Resistivity Ratio (RRR) value greater than 300 and compliance with ASTM B-391, B-393, and E-8/E-384 standards. Materials must be delivered FOB Destination to Batavia, Illinois, with specific requirements for non-abrasive packaging and permanent product inscription for traceability. Proposals are due by November 10, 2026, and must be submitted in two separate volumes: a technical proposal and a business/price proposal. Evaluation is based on a best-value trade-off where technical merit, quality assurance plans, and past experience are significantly more important than price. Offerors must provide a minimum of three relevant examples of similar work from the past five years and a detailed project schedule. Mandatory submissions include the SARC (PROC-FRM-100) and Proposal Certifications (PROC-FRM-466) forms. The contract incorporates various Federal Acquisition Regulation (FAR) and Department of Energy Acquisition Regulation (DEAR) clauses, including strict prohibitions against racially discriminatory DEI activities under FAR 52.222-90 and compliance with the Buy American Act.
Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, and Extruding

POSTED

10 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS