Generator Load Testing & Major Preventive Maintenance

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract requires the performance of load testing and major preventive maintenance on 5 to 7 emergency generators at intervals of every three years, with all work including the use of load banks for performance verification and comprehensive servicing to ensure operational readiness. This task is critical for maintaining system reliability under emergency conditions and must be completed according to specified technical standards. The solicitation is categorized as a subcontract under NAICS code 811411, issued by the City of Madison in Wisconsin, with responses due by September 3, 2026, at 1:00 PM. The work is expected to be performed onsite at the location of the generators, though the exact address is not specified in the provided data. There is no set-aside classification indicated, and no point of contact details are provided within the contract data.

General Info

Load test and maintain 5–7 emergency generators every three years using load banks for operational readiness.

Documents

This scope was carved out of 15018-0-2026-BP.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Generator Service

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWisconsin → City of Madison
ContactsNo contacts available
OfficeN/A
Organization / AgencyWisconsin → City of Madison
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Conduct load testing and major preventive maintenance every three years on 5–7 emergency generators, including performance verification and servicing using load banks.

More opportunities from Wisconsin → City of Madison

Same awarding agency

NAICS: 237990
New
SLED
9801 - Madison LakeWay - SkyLine Improvements
Solicitation # 9801
The Madison LakeWay – SkyLine Improvements project, managed by the City of Madison Parks Division, involves the construction of a green linear parkway along a half-mile stretch of shoreline adjacent to John Nolen Drive in Madison, Wisconsin. Building upon the John Nolen Drive Reconstruction project, the scope includes the installation of two boardwalks, pedestrian-scale site lighting, solar bollards, specialty concrete paving, wayfinding signage, information kiosks, and extensive landscaping. The contract is structured with a Base Bid for the primary improvements and an Alternate Bid Item specifically for the construction of the SkyLine Pier, which includes thermally modified ash wood decking and associated utility work. This is a Best Value Contracting solicitation awarded to the lowest responsive bidder. Bidders must provide a bid bond equal to at least 5% of the bid and submit a Small Business Enterprise Compliance Report to demonstrate adherence to SBE participation goals. The project mandates strict compliance with the Americans with Disabilities Act for all signage and fabrication, as well as adherence to Madison General Ordinance 33.07(7) regarding active apprentice requirements. Quality assurance is managed through required site mockups and inspections of stone and lumber materials by the Architect, with a professional engineer registered in Wisconsin required to certify precast and connection safety. Awarded contractors must execute all documents by January 28, 2027.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS