Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Geophysical Logging and Aquifer Testing

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of Q26141311020.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Municipal Groundwater Well Drilling Contractors

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → DOU - Utilities Department of City of Sacramento
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs technical analysis of boreholes and aquifer performance for prime contractors on City of Sacramento Department of Utilities projects. Conducts geophysical logging of the borehole and operates temporary pumping equipment to perform pumping and aquifer tests. Utilizes geophysical logging tools, high-capacity pumps, and data loggers. Professional Geologist (PG) license required for report sign-off. Delivers geophysical logs and aquifer test reports.

Similar Contracts

Same NAICS industry code

More opportunities from California → DOU - Utilities Department of City of Sacramento

Same awarding agency

NAICS: 237110
New
SLED
Municipal Groundwater Well Drilling Contractors
Solicitation # Q26141311020
The City of Sacramento Department of Utilities is seeking to establish a pool of prequalified general contractors through a qualification-based selection process to drill and construct municipal groundwater production, test, and monitoring wells over a five-year period. The City anticipates constructing up to five of each well type, with specifications typically involving casing diameters of 20 inches or less, borehole diameters of 48 inches or less, and depths ranging from 500 to 1,500 feet. Individual project estimates are expected to range from 100,000 to 3,000,000 dollars, with performance periods between 90 and 180 working days. Qualified firms must hold an active C-57 Water Well Drilling Contractor license and demonstrate experience with wells at least 18 inches in diameter and 800 feet deep. The selection process evaluates firms based on project experience, technical capabilities, project management systems, and key personnel qualifications. While cost information must be uploaded via PlanetBids, it is not used for the initial ranking. Responsive submissions must include a signed submittal signature page and LBE verification, with a 5 percent LBE preference applied during evaluation. Awarded contracts will require 100 percent performance and payment bonds, as well as comprehensive insurance including commercial general liability, automobile, workers compensation, and professional liability. Payments are issued at 95 percent of approved amounts following verification by the Engineer and labor compliance officer.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 21 days
View Details
NAICS: 541330
SLED
Electrical Studies for DOU Facilities
Solicitation # P26141363019
The City of Sacramento Department of Utilities is seeking a professional engineering firm to conduct comprehensive electrical studies for an initial 31 facilities, with a long-term goal of updating approximately 200 facilities over a five-year term. The scope of work includes Short Circuit, Load Flow, Equipment Evaluation, Coordination, and Protective Relaying Device Analysis, as well as Arc Flash Hazard Analysis and Mitigation Reports. Depending on the facility, the contractor will perform either a Full Electrical Study, which includes data collection and file creation, or a Five-Year Review Study using existing City-provided data. All analysis must be performed using the latest version of SKM Systems Analysis, Inc., Power Tools for Windows software, and final deliverables must be reviewed, stamped, and signed by a Registered Electrical Engineer in the state of California. The project has a proposed budget of 1,320,000 dollars and will be awarded based on best value, considering written proposals and potential interviews. Key requirements include the production and installation of machine-printed arc flash labels compliant with NFPA 70E and NEC standards, as well as the submission of a performance bond within ten days of the intent to award. Proposers must provide a detailed work plan and timeline, and those qualifying as Local Business Enterprises may receive a 5 percent preference. All final reports and electronic SKM files must be submitted via USB or shared drive following approval from the City Engineer.
Engineering Services

POSTED

16 days ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS