Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Grant Pool Repairs Fort Leavenworth

Closed
W91QF4IFB2026PoolFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces with new paint and signage. Technical upgrades involve installing raised flooring and electrical distribution, implementing simple dimming controls, replacing ballasts, lamps, and ceiling fans, and replacing variable air volume systems. The project also requires correcting plumbing deficiencies and ensuring all work adheres to ADA accessibility guidelines and seismic-resisting system standards. The performance period is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Award will be determined using a best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to prevailing wage rates. Key administrative requirements include submitting submittals within 14 days of award, providing a comprehensive safety plan, and managing all construction and demolition waste.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 11 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additional requirements include the replacement of electrical distribution, lighting, low-voltage systems, and building automation controls, as well as site improvements such as paving, drainage upgrades, and hazardous materials abatement. The work is divided into two primary pricing line items: building renovation and the removal and replacement of paving. The contract has an estimated value between 10 million and 25 million dollars, with a performance period of 730 days after award. Award will be based on the lowest price. Bidders must submit responses by November 23, 2026, and an optional pre-bid meeting is scheduled for November 2, 2026. The project mandates strict adherence to quality control through a three-phase control process and requires a Contractor Quality Control Plan approved by the Contracting Officer. Bonding requirements are tiered, with proposals over 150,000 dollars requiring bid, payment, and performance bonds. Compliance with the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines is mandatory. Invoicing must be processed through Wide Area Work Flow using NAVFAC Form 4330/54.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 25 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 28, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Efforts (GFE) to secure project financing. Bidders must complete six specific GFEs prior to the bid opening date to avoid being deemed non-responsive. Mandatory requirements include providing proof of public notification via an online publication for 30 consecutive days and a print newspaper for one day, as well as evidence of utilizing the Small Business Administration (SBA) and Minority Business Development Agency (MBDA). While outreach documentation such as call logs and emails may be submitted up to three business days after the closing date, failure to include the required publicity and agency assistance proof within the initial bid package will result in disqualification.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and an underground stormwater retention system. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a water damage restoration project at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, and necessary electrical and vanity/cabinet repairs. All work must comply with NFPA-101 Life Safety Code, ADA, OSHA, EPA, and local Massachusetts building codes. The contract is a small business set-aside and requires a single lump sum bid, though the lowest price does not guarantee an award. Evaluation is based on best value, weighted by price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submissions include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a Massachusetts contractor's license, and wage rate certification. The contract is subject to the Davis-Bacon Act and Executive Orders regarding minimum wage and paid sick leave. Contractors must provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30. Key deliverables include a sequenced construction schedule due within 14 days of the Notice to Proceed and a final punch list to be corrected within 14 days of the substantial completion walk-through.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, including sixteen residential rooms and bathrooms, common areas, and mechanical and utility rooms. The scope of work involves drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring that fire resistance and equipment clearances are maintained throughout the process. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing, a detailed work plan including project phasing and occupied-building protection, and evidence of relevant experience. Award requirements include providing payment and performance bonding for the full project value, along with liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD is contingent upon the successful testing of restored mechanical, plumbing, electrical, and life-safety systems, the removal of all debris, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 22 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and access necessary documentation.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The contract for Grant Pool Repairs at Fort Leavenworth, Kansas, encompasses a comprehensive renovation of the pool facility located in Buildings 155 and 166, aimed at restoring full operational integrity and compliance with modern safety and structural standards. The scope includes replacing the existing pool supply and return plumbing with a new overflow gutter system, sealing all legacy penetrations to ensure watertight integrity, and installing a new in-ground horizontal filtration system in place of the outdated sand filters. Electrical upgrades involve replacing and relocating the main panel and pool pump motor disconnect, along with repairing and upgrading damaged conduit and wiring beneath the deck, adding new conduit and conductors, CPVC piping, and chemical house conduit. Additional work includes installing a new slide water supply line, repairing the telecom line, replacing pool deck drains and the fencing, installing a new chemical house exhaust fan and intake louver, replacing underwater lights, bathhouse windowpanes, the storage room door, building gutters, repairing bathhouse tile, and installing a new trench drain in the mechanical yard. The project culminates in the installation of a commercial-grade exposed aggregate pool liner, subject to strict performance criteria including compressive strength of at least 4,500 psi, flexural strength of 700 psi, water absorption below 6%, and a minimum bond strength of 150 psi to the bond coat, with slip resistance per ASTM C1028 and specific water chemistry parameters during startup. The work must adhere to Unified Facilities Criteria, the National Electric Code (NEC 2023), IBC, IPC, OSHA standards, and the Secretary of the Interior’s Preservation Standards due to the site's location within a National Landmark Historic District. All contractors must comply with special requirements including the submission of detailed shop drawings, as-built drawings in both paper and digital AutoCAD formats, three paper and three digital copies of Operation and Maintenance manuals organized by system, manufacturer warranties for all equipment, material certifications for HDPE, steel frame, and NSF-60 certified sand, and hydrostatic and operational test reports. A Site-Specific Safety Plan must be the first submittal, and compliance with Army Corps EM 385-1-1 and other safety directives is mandatory. Daily inspection reports and continuous quality control programs are required, with full system commissioning to be witnessed by the Government. The contractor must designate a Project Manager as a direct liaison to the Contracting Officer’s Representative within 10 days of award,

General Info

Repair and upgrade Fort Leavenworth pool facility with new plumbing, electrical, filtration, liner, and safety systems per historic and federal standards.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Fort Leavenworth, KS, 66027, USA

Set-Aside

SBA

Documents

4

Construction Wage Determination Building KS20260053

PDF, High priority: read this firstwage-determination
High

Fort Leavenworth New Swimming Pool - Record Drawings 200-158

PDF, High priority: read this firstspecifications
High

IFB W91QF426BA006 Grant Pool Repairs

PDF, High priority: read this firstifb
High

SOW Repair Grant Pool 2026 Fort Leavenworth M.0153731

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc-Ft Leavenworth
Contacts2 people available
OfficeFORT LEAVENWORTH, KS, 66027-0000, USA
Office AddressFORT LEAVENWORTH, KS, 66027-0000, USA

Full Description

Show more

The work includes replacing the existing pool supply and return plumbing with a new overflow gutter system and sealing all legacy penetrations to restore watertight integrity. It also includes replacing damaged electrical conduit and wiring beneath the excavated deck, along with additional conduit, conductors, CPVC piping, and chemical house conduit as required. The existing sand filters will be replaced with a new in-ground horizontal filtration system, and a new chemical house exhaust fan will be installed. Electrical upgrades include replacing and relocating the main panel and the pool pump motor disconnect. Additional work includes installing a new slide water supply line, repairing the telecom line, replacing pool deck drains, and completing required grounding and bonding of pool components. The project also replaces the pool fencing, underwater lights, bathhouse windowpanes, storage room door, and building gutters, along with repairing bathhouse tile and installing a new trench drain in the mechanical yard. A new exposed aggregate pool liner will be installed after all structural, gutter, and penetration repair work is complete.

More opportunities from Department Of Defense → W6QM Micc-Ft Leavenworth

Same awarding agency

NAICS: 484210
New
Federal
Fort Leavenworth LRC Moving BPA
Solicitation # W91QF4QA022
The Department of Defense, through the W6QM Micc-Ft Leavenworth office, is soliciting a Firm Fixed Price Blanket Purchase Agreement (BPA) for moving services at Fort Leavenworth, Kansas. This small business set-aside, specifically targeting women-owned and HUBZone small businesses, requires a local moving company to provide all personnel, equipment, and materials for the preparation, shipment, drayage, and storage of personal property and unaccompanied baggage for DoD personnel. The scope of work includes complete service household goods and intra-city or intra-area moves, with performance measured in hundred pounds (CWT). The period of performance for option line items extends from January 1, 2027, to December 31, 2031. The contract mandates strict adherence to packaging and marking standards, including ASTM and SDDC specifications, and requires the use of heat-treated lumber for wood packaging. Contractors must maintain comprehensive insurance coverages, including workmen's compensation, general liability, and cargo insurance from an underwriter rated A or better by Best's Insurance Guide. Administrative requirements include electronic invoicing via the Wide Area WorkFlow (WAWF) system and compliance with various FAR and DFARS clauses regarding cybersecurity, domestic preference, and labor standards. Award will be granted to the responsible offeror deemed most advantageous to the government based on price and other evaluated factors.
Used Household and Office Goods Moving

POSTED

7 days ago

DEADLINE

in 14 days
View Details
NAICS: 519290
Federal
CAC Library Consortium Authentication Solution
Solicitation # Library-Authentication-RFI
The Department of Defense, specifically the W6QM Micc-Ft Leavenworth, is seeking information for a commercial off-the-shelf, Software as a Service library authentication and electronic resource proxy subscription. This solution will support the U.S. Army Combined Arms Command Library Program, covering one enterprise Program Office instance and eighteen individual library instances. The required system must natively integrate with the Ex Libris Alma and Primo VE environment, support SAML 2.0 and OpenID Connect federation standards, and operate across both commercial internet networks and Army Unified Directory Services. The goal is to provide secure, seamless remote access to licensed electronic resources while maintaining a centralized web-based administrative interface for usage statistics and management. The project is planned for a 2027 implementation, with a specific implementation period from March 1, 2027, to April 14, 2027, followed by a twelve-month base period and six subsequent twelve-month option periods extending through April 14, 2034. Key requirements include a controlled cutover by April 14, 2027, successful User Acceptance Testing, and strict adherence to DoD, Army, and federal standards for cybersecurity, privacy, and Section 508 accessibility. As a fully hosted SaaS solution, no software will be installed on government premises, and technical services will be performed at the contractor's facilities. Interested parties under NAICS 519290 are asked to identify their capabilities and past performance.
Web Search Portals and All Other Information Services

POSTED

27 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS