Gravity and Pressure Sewer Pipeline Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract entails the installation of gravity and pressure sanitary sewer pipelines with diameters ranging from 8 inches to 18 inches, requiring full lifecycle construction activities including trench excavation, proper bedding support, precise pipe laying, secure joint restraint, and thorough backfilling with compaction to meet stringent engineering standards. All work must adhere to ASTM, AWWA, and KDHE regulations to ensure structural integrity, leak prevention, and long-term operational reliability of the sewer system. The project is structured as a subcontract under NAICS code 237110, managed by the Kansas office of MSO - CMED, with a response deadline of July 21, 2026, and a posting date of June 30, 2026. The specific location of performance is not detailed, but the scope implies urban or infrastructure-focused areas requiring compliance with state and national utility construction codes.
General Info
Agency
NAICS
Place of Performance
KS, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
