Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on May 17, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Green Harbor Jetty Repair

Awarded
W912WJ18B0005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 4 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 5 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, New England District, is soliciting bids for the repair of a 150 foot section of the east jetty at Green Harbor in Marshfield, Massachusetts. This project aims to remediate damage caused by Winter Storm Juno and subsequent weather events. The scope of work involves the excavation, removal, and installation of approximately 1,200 tons of new armor stone ranging from 4 to 7 tons, ensuring the repaired area is properly interlocked and meets design tolerances. While work can be performed from land or water, new armor stones must be delivered via a waterborne plant. This procurement is strictly set aside for small businesses under NAICS code 237990, with an estimated construction cost between 1,000,000 and 5,000,000 dollars. To qualify, the successful offeror must meet a Definitive Responsibility Criterion by demonstrating the completion of two projects within the last six years involving the placement and interlocking of 7 ton stones or larger in a tidally influenced marine environment. The contractor is responsible for providing all necessary equipment, personnel, and materials to complete the repairs.

General Info

Contract Value

$1,023,125

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

MA, USA

Set-Aside

NONE

Award Issued Date

Documents

11

Amendment0001.pdf

PDF

Amendment_0002.pdf

PDF

Amendment_0003.pdf

PDF

Amendment_0004..pdf

PDF

BidAbstract.pdf

PDF

BidSummary.pdf

PDF

Drawings.pdf

PDF

GreenHarbor-JettyRepair_NSC_AMND_0004.pdf

PDF

Sketch_1.pdf

PDF

Specifications.pdf

PDF

W912WJ18B0005_Solicitation.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Feb 27, 2018 to Mar 1, 2018.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
Contacts1 person available
OfficeCONCORD, MA, 01742-2751, USA
Office AddressCONCORD, MA, 01742-2751, USA
Contacts

Full Description

Show more
The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids for Maintenance and Repairs of the East Jetty feature of the Federal Navigation Project (FNP) in Green Harbor, Marshfield, MA. This project is set-aside for small business. The NAICS code for this procurement is 237990. The estimated construction cost is expected to range from $1,000,000.00 to $5,000,000.00. The work of this project consists of repairing a 150 foot section of the east jetty at Green Harbor in Marshfield Massachusetts. The east jetty was damaged during Winter Storm Juno in 2015 and subsequent storms. Approximately 1,200 tons of new armor stone will be required to make repairs to the landward section of the jetty. The new armor stones will vary in size from 4-7 tons. The work includes excavating, removing, stockpiling, installing and reworking existing armor stone as well as acquiring and installing new armor in the jetty repair area. The repaired area must be properly interlocked and be within specified design tolerances. The excavation and stone placement may be performed from land or water; however, new armor stones will need to be delivered via waterborne plant. Under this contract, that will include Definitive Responsibility Criterion (DRC), the successful offeror will be required to provide the equipment, personnel and materials required for the repairs to the east jetty feature of the FNP as described herein and demonstrate (per the DRC) completion of two (2) projects within the last six (6) years that involved construction or repair of a jetty, breakwater, or other stone work requiring the placement and interlocking of 7 ton stones or larger in a tidally influenced marine environment where work had to be coordinated around tide cycles. Please note this solicitation is set aside for small businesses, which means that only small business firms can submit a bid.

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS