Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Gunnison Ranger District Soap Creek Stream Repairs

Closed
1240LT26Q0171Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 12 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 12 hours ago

DEADLINE

in about 18 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 12 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 17 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

Solicitation 1240LT26Q0171 is a Request for Quotation for the Soap Creek West Bank Repair project within the Gunnison Ranger District, Colorado. This total small business set-aside under NAICS 237990 involves repairing approximately 200 feet of the west bank of Soap Creek adjacent to sites 11 and 12 in the Soap Creek Campground. The scope of work includes hardening the banks with imported riprap, installing one rock stream barb, placing five root wads, and planting 100 willow plugs and 500 onsite willow cuttings. The project must adhere to USFS design standards and the NRCS Stream Restoration and Design Field Guide. The performance period is restricted to low-water conditions between August 15th and October 15th. Award will be based on the best value, evaluating the price and a submitted construction schedule, such as a Gantt chart. The contract is a firm-fixed-price agreement subject to Davis-Bacon Act wage determinations. Key requirements include the submission of a resume for the onsite supervisor and the provision of payment bonds or an irrevocable letter of credit for 100 percent of the contract price within 10 days of award. Final acceptance of the work must be conducted by the USFS Project Manager prior to demobilization and before snowfall closes campground access.

General Info

Small business set-aside for Soap Creek West Bank repair project in Colorado.

Contract Value

$66,264

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Gunnison, CO, 81230, USA

Set-Aside

SBA

Award Issued Date

Documents

11

1240LT26Q0171 Amendment 0001 - Soap Creek West Bank Repair

PDF, High priority: read this firstamendment
High

1240LT26Q0171 Soap Creek West Bank Repair RFQ

PDF, High priority: read this first24 pages · rfq
High

C05_Attach+1_SOI_Revised - Schedule of Items

XLSX, High priority: read this first2 pages · specifications
High

C05_Attach+1_SOI - Schedule of Items

XLSX, High priority: read this first2 pages · sow
High

CO20260003 Wage Determination for Colorado Heavy Construction

PDF, High priority: read this firstwage-determination
High

Soap Creek CG Streambank Rehab Drawings and Scope of Work

PDF, High priority: read this first11 pages · sow
High

Soap Creek CG Streambank Rehabilitation SOW

PDF, High priority: read this firstsow
High

Soap Creek West Bank Repair - Amendment 0001 Q&A

PDF, High priority: read this firstq-and-a
High

USDA Soap Creek CG Streambank Rehabilitation SOW

PDF, High priority: read this first5 pages · sow
High

C05 Attachment 3 - Soap Creek CG Streambank Stabilization Aerial Map

PDF, Low priorityother
Low

Soap Creek CG Streambank Stabilization - Location Map

PDF, Low priorityspecifications
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Deadline changed

Response deadline changed from Sep 17, 2026 to Sep 18, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 8 Usda-Fs
Contacts2 people available
OfficeOgden, UT, 844012310, USA
Office AddressOgden, UT, 844012310, USA

Full Description

Show more

Description



This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12.  This announcement constitutes the only solicitation.  Quotations are being requested and separate written solicitation will not be issued. 


Solicitation number 1240LT26Q0171 is issued as a Request for Quotation (RFQ) for Soap Creek West Bank, Gunnison Ranger District Repairs.  This project involves repairing approximately 200 ft. of the west bank of Soap Creek adjacent to sites #11 and #12 in Soap Creek Campground on the Gunnison Ranger District. The stream work will include hardening the banks with imported riprap, installing one rock stream barb, five root wads, and planting willows.  See attached for further details.  


This acquisition  is set-aside for small business concerns.  The applicable North American Industry Classification Standard Code is 237990.  The small business size standard is $45 million dollars.  This acquisition is a Total Small Business Set-Aside.  All responsible sources may submit a quotation which will be considered by the agency. 

More opportunities from Department Of Agriculture → Csa Intermountain 8 Usda-Fs

Same awarding agency

NAICS: 238990
New
Federal
Big Springs Horse Corral Replacement
Solicitation # 1240LT26Q0179
Solicitation 1240LT26Q0179 is a total small business set-aside for the Big Springs Horse Corral Replacement project located in the Westside Ranger District of the Caribou-Targhee National Forest in Caribou County, Idaho. The project requires the supply and installation of a 20 by 60 foot four-rail divided steel oil pipe corral with concrete post embedment. The contractor is responsible for all mobilization, clearing and grubbing, and the implementation of temporary traffic control measures, including closing local traffic and posting public notices for the duration of the work. There are two optional award items: the construction of one additional 20 by 60 foot corral and the installation of a hitching rail. The contract is a firm fixed price agreement with an estimated performance period from June 1, 2027, through July 31, 2027, allowing for 61 calendar days for completion. Award will be made to the lowest technically rated offeror with fair and reasonable pricing and acceptable or neutral past performance, evaluated via an experience questionnaire focusing on general construction and concrete work. Payment bonds are required for contracts exceeding 35,000 dollars. The project is subject to the Davis-Bacon Act, requiring prevailing wage rates and specific paid sick leave and minimum wage standards. Bids must be submitted to the USDA Forest Service by October 29, 2026.
All Other Specialty Trade Contractors

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 562910
New
Federal
Bunkhouse Asbestos Mitigation
Solicitation # 1240LT27Q0010
Solicitation 1240LT27Q0010 is a total small business set-aside for the removal and replacement of approximately 2,900 square feet of asbestos-containing building materials at three facility locations within the Rio Grande National Forest in Colorado. The scope of work includes the abatement of asbestos from ceilings, walls, windows, and flooring, followed by the installation of new materials such as drywall and wood flooring, and finishing the interior walls and ceilings with paint. Performance is scheduled to occur between October 30 and December 30, 2026. The project is estimated to have a value between 100,000 and 250,000 dollars. Award will be based on the best value to the government, with cost and price serving as the most important evaluation factor. Other critical requirements include the submission of a technical narrative and a record of past performance within the last three years. Contractors must provide 100 percent payment and performance bonds, as well as a bid bond equal to 20 percent of the total offer price. Additionally, the contractor is required to hire an independent third party for air clearance testing before renovation begins and must adhere to all applicable asbestos laws, OSHA regulations, and Davis-Bacon Act wage requirements. Quotations must be submitted via the specified Excel pricing format by the deadline of October 28, 2026.
Remediation Services

POSTED

7 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS