Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Virtual Industry Day for FY27 USACE National Dredging Procurement Strategies

Closed
W912PM27DREDGFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 14 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 14 hours ago

DEADLINE

in about 16 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 14 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 19 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

The USACE National Dredging Center is hosting a Virtual Industry Day on September 9, 2026, to discuss three planned national contract acquisition strategies for FY27. The first strategy involves Hopper Contracts, where maintenance dredging and beach renourishment projects will be awarded as consolidated packages. The second strategy, Scope Dredge to Budget, focuses on the Galveston/Houston Area of Responsibility and utilizes a two-phase selection process. Phase One involves a technical qualifications-based evaluation of bonding capacity, past performance, and proposed plant, leading to a down-select of up to five offerors. Phase Two will then use a best-value determination based on channel maintenance duration, beneficial use of material, schedule, and management approach. This strategy covers various Texas harbors and waterways, including the Houston Ship Channel and Corpus Christi Ship Channel. The third strategy is a National Small Business Multiple Award Task Order Contract (MATOC) for recurring and emergency dredging requirements across the United States. This five-year contract will cover activities such as maintenance and new work dredging, material placement, and facility maintenance. To qualify, offerors must provide documentation for owned dredges meeting specific minimum requirements, such as a cutter suction dredge with at least a 10-inch discharge diameter or a mechanical dredge with at least a 5 cubic yard bucket. Evaluation factors for the MATOC include technical capability and three examples of relevant past performance from the last six years. Interested parties must RSVP by 10 AM ET on September 8, 2026.

General Info

USACE Virtual Industry Day on September 9, 2026, discussing three national dredging strategies.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Wilmington, NC, 28403, USA

Set-Aside

NONE

Documents

6

FY27 SWG Dredging Project Descriptions

PDF, High priority: read this first11 pages · sow
High

Enterprise Dredge Delivery Center Virtual Industry Day Transcript

PDF, Low priorityindustry-day
Low

Enterprise Dredging Delivery Center (EDDC) Industry Day

PPTX, Low priority7 pages · industry-day
Low

FY27 Hopper Groupings Industry Day

XLSX, Low priority4 pages · industry-day
Low

FY27 Hopper Groupings Industry Day Revised 8-28-26

XLSX, Low priority4 pages · industry-day
Low

Group Email Address for Further Questions

PDF, Low priorityq-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

event

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The point of contact changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Wilmington
Contacts2 people available
OfficeWILMINGTON, NC, 28403-1343, USA
Office AddressWILMINGTON, NC, 28403-1343, USA
Contacts
Rosalind Shoemaker

Full Description

Show more

The Virtual Industry Day Meeting for the USACE National Dredging Center will occur on 09 Sept 2026 at 13:00 PM EST via Teams.  All interested dredging companies are encouraged to attend. 




During the meeting, we will be discussing three potential planned national contract acquisition strategies.



1. Hopper Contracts: The National Dredging Center anticipates awarding multiple maintenance dredging and beach renourishment projects as consolidated contracts.  See the attached spreadsheet Attachment 2 for proposed pairings for consolidated procurement packages. We anticipate the pairings of the attached projects and encourage feedback from industry on any of our projected pairings.




2. Scope Dredge to Budget: Optimize the Budget in terms of quality, scope, durability with innovative betterments and betterments within the budget.  The goal of the scope-dredge to budget is maximizing achievable scope within a target budget that will be provided in the solicitation.  The National Dredging Team intends to issue 1 solicitation for the Galveston/Houston Area of Responsibility.



  • Phase One

-A technical qualifications-based evaluation of initial proposals


-RFP that defines the project with functional and performance requirements, budget cap, and schedule/delivery requirements


-A statement of the maximum number of offerors that will be selected to submit Phase 2 proposals.


-RFO FAR 36.101-2(b)(4) states maximum number of offerors shall not exceed five (5)



  • Phase One proposals from vendors do not include:

-Detailed design information


-Cost or price information



  • Down-select Decision for most highly qualified offerors in accordance with the solicitation.


  • Proposed Phase 1 Qualifications

-Proof of bonding capacity


-Past Performance


-Proposed Plant



  • Proprietary Meetings (RFO FAR 15.101 Exchanges with Industry before receipt of proposals)


  • Phase Two in accordance with FAR 15 Source Selection Procedures to determine best value.

Official Phase Two RFP issued by amendment for most highly qualified offerors to submit phase-two competitive proposals that include technical proposals and cost or price information.



  • Proposed Phase 2 Evaluation Factors

-Maximum amount of time to maintain the channels at authorized dimensions


-Maximum use of beneficial use


-Schedule


-Management Approach




  • The harbors to be dredged include the Sabine-Neches Waterway, Galveston Harbor & Channel, Houston Ship Channel, Texas City Ship Channel, Freeport Harbor, Matagorda Ship Channel, Corpus Christi Ship Channel, Brazos Island Harbor, Gulf Intracoastal Waterway & Tributaries, Channel to Victoria, and Channel to Harlington. See Attachment 1 for project descriptions and map.


3. National Small Business Multiple Award Task Order Contract (MATOC):


The United States Army Corps of Engineers (USACE) executes construction contracts for regular, reoccurring, and emergency National Enterprise Dredging requirements at various coastal harbors, inland rivers, canals, and connecting channels throughout the United States. Individual projects are typically annual requirements and may utilize mechanical, hydraulic, or a combination of dredging equipment and techniques with activities to include but not limited to maintenance and new work dredging, dredged material placement, and other activities such as Confined Disposal Facility (CDF), Dredged Material Disposal Facility (DMDF), or upland containment facility maintenance, groundskeeping, other earthwork at placement sites, surveying, or other work connected with dredging and placement requirements. Task orders issued under this MATOC will require the contractor to mobilize dredge plant and support vessels to the project location, perform dredging as shown on the respective plan(s), place dredged material—which may include beach nourishment, open-water placement, CDFs, DMDFs, beneficial use, or alternative placement strategies as indicated in individual task orders—and demobilize once complete.



The maximum ordering capacity for the 5-year ordering period of the MATOC and maximum task order amounts are TBD.



Below are the draft source selection criteria proposed:



  1. FACTOR 1: Technical Capability
    1. Submission Requirements:
      1. Dredge Information: The offeror shall provide documentation for any dredges being proposed for use under this solicitation/contract, and any subsequent task orders. If the proposal does not include at least one of the identified dredges below, then Factor 1 will be rated “Unacceptable”. Proposed dredges must include a minimum of at least one of the following:


  1. Cutter Suction Dredge - employs a mechanical cutter to break up material which is then excavated hydraulically and transported to the placement site through a pipeline.
    1. Minimum Requirement: 10-inch discharge diameter or larger
    2. Mechanical Dredge - uses of some form of bucket to excavate and raise submerged material.
      1. Minimum Requirement: 5 cubic yard bucket or larger


Offeror can submit more than one dredge(s) that meets the minimum requirements above in responding to this evaluation factor. Dredges that are still under construction or are in the process of undergoing major reconstruction will not be considered.



The dredge documentation must include the following information:


  1. dredge type;
  2. certify that the dredge meets minimum requirements stated above;
  3. proof offeror owns the dredges submitted (leased dredges are not acceptable).


  1. FACTOR 2: Past Performance
    1. Submission Requirements: Offerors will be required to provide three (3) past performance examples of recent and relevant maintenance dredging projects for the type of dredge submitted under Factor 1 – Technical Capability, which demonstrate that they have experience accomplishing the following: dredging of Navigation Channels, Rivers, Harbors, Inland Waterways with depths ranging from 6 feet to 50 feet. The past performance examples must include dredging that has been performed within the last six (6) years from the date of the solicitation. 


In addition to submitted examples, the Government may review any other  sources of information for evaluation of past performance.



If the Offeror is proposing as a Joint Venture (JV), Partnership and/or Teaming Arrangement and past performance cannot be provided as such, each partner shall submit past performance information but shall not exceed the three (3) projects total for this factor.



1. Note 1: NAA: The Offeror will be required to provide documentation related to EM 385-1-1 requirements such as Floating Service Naval Architecture Analysis (NAA) with either MATOC or Task Order proposal.



2. Note 2: The Offeror may be required to submit a letter of commitment with their proposal from a surety that confirms that the offeror's bonding capacity meets a specified minimum amount.




Please RSVP no later than 10AM ET 08 September 2026 to both Ros Shoemaker and Terri Adams at Rosalind.m.shoemaker@usace.army.mil and terri.m.adams@usace.army.mil if you plan to attend the Industry Day.  A Teams calendar invite will be sent out to all RSVP’s.  Industry is also encouraged to provide any feedback on the proposed acquisition strategies or contract pairings.  Feedback can be provided via email to the contracting officer and contract specialist listed above.  If you would like to provide any questions in advance of the meeting, please provide them no later than 10AM ET, 08 September 2026.

More opportunities from Department Of Defense → W074 Endist Wilmington

Same awarding agency

NAICS: 236220
New
Federal
PN 110205 - SOS Hangar Renovation - Progressive-Design-Build OT
Solicitation # W912PM279A001
The U.S. Army Corps of Engineers is issuing a draft program solicitation for the renovation of Hangar 750 at Pope Army Airfield, Fort Bragg, North Carolina. This project supports an Air Force Special Operations Command squadron mission and involves the comprehensive architectural and MEP build-out of ground floor aircraft maintenance bays, the integration of exterior hangar doors, and the construction of second-floor administrative and high-security operational spaces. The scope includes the installation of Level 2 wet-pipe fire suppression, intrusion detection systems, electronic access control, and full furniture, fixtures, and equipment packages. This procurement is conducted as an Other Transaction Agreement under 10 USC 2808a, meaning it is not subject to the Federal Acquisition Regulation. The project follows a Progressive Design-Build approach divided into two stages: Phase 1 focuses on design and pre-construction services, while Phase 2 covers final design and construction via a Fixed Price model based on a negotiated Guaranteed Maximum Price. The government has established an affordability cap of 35 million dollars as a material requirement, and the selected firm must be capable of providing performance and payment bonds of at least 35 million dollars. Selection is based on a qualifications-based methodology involving a two-step process: an initial evaluation of White Papers followed by Pitch Presentations for a target of three highly qualified teams. All team members must be registered in the System for Award Management with a valid Unique Entity Identifier. Additionally, the successful Design-Builder must comply with Cybersecurity Maturity Model Certification (CMMC) requirements as codified in 32 CFR Part 170, including a positive self-assessment and signed attestation of security controls. Submissions must be made through the PIEE Solicitation Module.
Commercial and Institutional Building Construction

POSTED

about 14 hours ago

DEADLINE

in 17 days
View Details
NAICS: 237990
New
Federal
SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR CAPE MAY TO LOWER TOWNSHIP, NEW JERSEY, BRIGANTINE INLET TO GREAT EGG HARBOR INLET (ABSECON ISLAND), NEW JERSEY, AND BARNEGAT INLET TO LITTLE EGG, INLET
Solicitation # W912PM27BA004
The US Army Corps of Engineers is seeking industry feedback regarding the potential implementation of Project Labor Agreements for a large-scale Coastal Storm Risk Management project in New Jersey exceeding 35 million dollars. The work spans three primary regions: Cape May to Lower Township, Brigantine Inlet to Great Egg Harbor Inlet, and Barnegat Inlet to Little Egg Inlet. The scope involves extensive beachfill placement, ranging from 600,000 to 2,000,000 cubic yards per area, utilizing offshore borrow areas. Additional requirements include the construction or repair of ADA-compliant dune crossovers, planting dune grass, installing sand fencing, and managing stormwater outfalls. This current notice is a sources sought survey rather than a request for proposal, with the formal solicitation expected in fiscal year 2027. The government is requesting detailed information from the construction community concerning local labor shortages, the historical use of PLAs in the region, and the potential cost or scheduling impacts such an agreement might have on bidding. Interested parties must submit their responses and supporting documentation regarding previous project performance to the designated points of contact by November 2, 2026.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Federal
SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR BETHANY BEACH AND SOUTH BETHANY BEACH, DE (CSRM - BEACHFILL), FENWICK ISLAND, DE (CSRM – BEACHFILL), REHOBOTH BEACH & DEWEY BEACH, DE (CSRM – BEACHFILL)
Solicitation # W912PM27BA005
The US Army Corps of Engineers is seeking industry feedback regarding the potential implementation of Project Labor Agreements for a large-scale Coastal Storm Risk Management project in Delaware. With an estimated value exceeding 35 million dollars, the project involves beachfill and renourishment efforts across Bethany Beach, South Bethany Beach, Fenwick Island, Rehoboth Beach, and Dewey Beach. The scope of work includes the transport of sand from offshore borrow areas using hopper or hydraulic cutterhead dredges to restore beach berms and dunes, as well as the repair of crossovers, fencing, and dune grass. This current notice is a sources sought solicitation intended to gather market research on local labor availability, the historical use of PLAs in the region, and the potential cost or scheduling impacts such an agreement might have on bidders. The government is requesting detailed responses and data from previous similar projects to determine if a PLA would promote economy and efficiency. The formal solicitation for the construction work is expected to be available in fiscal year 2027, and responses to this specific inquiry are due by November 2, 2026.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 13 days
View Details
NAICS: 238110
New
Federal
B. Everett Jordan Concrete Pad Installation
Solicitation # W912PM26QA047
The U.S. Army Corps of Engineers, Wilmington District, is soliciting quotes for a firm-fixed-price contract to install a 24ft-10in x 34ft-4in concrete pad with column foundations for a prefabricated shelter at the B. Everett Jordan Dam Tailrace Park in Moncure, North Carolina. This small business set-aside under NAICS 238110 requires the contractor to provide all labor, materials, equipment, and quality control. Technical specifications include excavating and compacting the area to 95 percent Proctor density, installing a minimum 8 inch subbase of washed No. 57 stone, and utilizing a heavy duty 8 oz non-woven geotextile fabric vapor barrier meeting ASTM E1745. The project must commence within 30 days of award and be completed, including final cleanup, within 75 days. Award will be granted to the lowest priced technically acceptable offeror. To be eligible, vendors must be registered in SAM, provide a technical proposal demonstrating their ability to meet the Statement of Work, and identify a designated on-site Safety Competent Person or Site Superintendent knowledgeable in OSHA construction standards. Submissions must be delivered via PIEE in PDF format, consisting of separate price and technical volumes. The contract includes requirements for performance and payment bonds at 100 percent of the contract price, adherence to Buy American construction material standards, and compliance with antiterrorism and operations security protocols.
Poured Concrete Foundation and Structure Contractors

POSTED

6 days ago

DEADLINE

in 15 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS