This Combined Synopsis/Solicitation opportunity from Department Of Veterans Affairs was posted on December 10, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

H244- Boiler Plant Testing and Inspections for Steam & Electric Boilers -Base Plus Four (4)

Awarded
36C26225Q0047Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238290
New
Centennial JCC Panic Hardware Services (Electrical Room Egress Doors)
Solicitation # Panic Hardware (Electrical Room Egress Doors)
Management & Training Corporation (MTC) is soliciting bids for the installation of commercial-grade panic hardware on electrical room egress doors at the Centennial Job Corps Center in Nampa, Idaho. The scope of work includes conducting site surveys to verify door dimensions and fire ratings, procuring Grade I heavy-duty panic bars, exterior trim, rim cylinders, strikes, and door closers, and performing installation and testing. All work must adhere to NEC 2023 Article 110.26(C)(3), NFPA 101 Life Safety Code, and ADA standards. To ensure fail-safe operation, contractors must perform at least 10 consecutive cycle tests on all installed hardware. This is a fee-for-service subcontracting opportunity open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities under NAICS code 238290. Bidders must be licensed in the State of Idaho and provide three references for similar projects. Required submission documents include a completed bid sheet with lump sum and individual deficiency pricing, a W-9, a self-certification form, and acceptance of terms and conditions. All bids must be submitted via email to Sandra Clore by December 1, 2026, at 3:00pm MST. The contract is subject to various federal regulations, including the Davis-Bacon Act for prevailing wage rates and fringe benefits, as well as FAR clauses regarding Buy American preferences and combating trafficking in persons. Contractors are required to comply with DOL records management, mandatory training, and privacy breach notification requirements. Payment will be issued upon the submission of invoices for materials and services that have been delivered and accepted by MTC. Final inspection and acceptance will occur at the MTC designated point of delivery.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 238290
New
SLED
Kitchen Elevator Upgrade and Repair Service - NHSP-M
Solicitation # RFP NHDOC 2027-07
The New Hampshire Department of Corrections is soliciting proposals for a firm fixed price or not-to-exceed contract to provide comprehensive upgrades and repairs for a 1985 Dover Corporation passenger elevator at the New Hampshire State Prison for Men. The elevator, which serves two floors of the kitchen and has a 4,000-pound capacity, requires a new power unit including the motor, hydraulic valve, pump, oil reservoir, and muffler, as well as the installation of four security key switches and eight keys. All work must be performed by New Hampshire licensed professionals and comply with all local, state, and federal elevator codes, with final safety test results submitted to the New Hampshire Department of Labor. The project is expected to start in January, with a final completion deadline of June 30, 2027. Proposals are due by 2:00 PM EST on November 13, 2026, and must be submitted as separate sealed technical and cost proposals. Evaluation is based on a combined score of the technical proposal, which focuses on organizational experience, correctional facility expertise, and approach, and the cost proposal. Award selection may involve a Best and Final Offer process. Selected vendors must maintain significant insurance coverages, including commercial general liability of at least 1 million dollars per occurrence, and adhere to strict correctional facility security protocols, including tool inventories and compliance with PPD 371. Payment will be issued within 30 days of receiving approved monthly itemized invoices.
Department Of Corrections

POSTED

about 9 hours ago

DEADLINE

in 15 days
NAICS: 238290
New
Federal
Vertical Transportation Equipment (VTE) Maintenance, Repair, & Inspection Services
Solicitation # FA446027Q0005
Solicitation FA446027Q0005 is a non-personal services contract for the comprehensive management, maintenance, repair, and inspection of real property vertical transportation equipment (VTE) at Little Rock Air Force Base, Arkansas. The scope of work covers freight and passenger elevators, escalators, and potentially wheelchair lifts, dock levelers, and dumbwaiters. The contractor is required to maintain a VTE availability rate of 95 percent and adhere to strict response times, including in-person arrival for emergency calls within two hours and commencement of routine work within 24 hours. All services must comply with ASME A17.1, ANSI/ASME A17.2, and other applicable safety and fire protection standards. A written Maintenance Control Program must be delivered within 30 calendar days of the award. This is a total small business set-aside under NAICS code 238290. The government will award the contract to the responsible offeror based on a lowest-price technically acceptable sequence, where the lowest-priced offer is selected if they possess an acceptable past performance rating, defined as at least two years of similar experience within the last four years. Proposals are due by November 18, 2026, and must be submitted via email to the designated points of contact. Payment and invoicing will be processed through Wide Area WorkFlow (WAWF) by the 10th of each month. Access to the base requires a valid REAL ID, and a single site visit is scheduled for October 26, 2026, requiring an RSVP by October 22, 2026.
FA4460 19 Cons Pka

POSTED

about 12 hours ago

DEADLINE

in 20 days
NAICS: 238290
New
Federal
N099--JLM Roll Up Door Replacement
Solicitation # 36C25627Q0092
Solicitation 36C25627Q0092 is a combined synopsis and request for quote issued by the Department of Veterans Affairs for the replacement of a motorized roll-up door at the John L. McClellan Veterans Hospital. This is a 100% set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238290. The project requires the contractor to provide all labor, tools, and equipment, including a scissor lift and forklift, to remove and dispose of the existing door and install one grey 7 by 9 foot motorized rolling steel rapid slat door with insulated slats and an obstruction safety device. The award will be a firm-fixed-price contract with a performance period of 30 days from the Notice to Proceed and includes a one-year warranty. The government will utilize the Lowest Price Technically Acceptable (LPTA) evaluation process, focusing on technical capability, price reasonableness, and the completion of the VA Notice of Limitations on Subcontracting. Interested offerors must submit a three-volume quote package consisting of technical capabilities, a completed price schedule, and the required VAAR certification. Quotes must be emailed to Joseph Warren by 3:00 PM CST on November 18, 2026. A site visit is scheduled for November 6, 2026, at 10:00 AM, and all inquiries must be submitted by November 10, 2026. Performance will take place at the Central Arkansas Veterans Healthcare System in North Little Rock, Arkansas, and contractors must comply with all OSHA, ANSI, CAN, and UL standards.
256-NETWORK Contract Office 16 (36C256)

POSTED

about 12 hours ago

DEADLINE

in 20 days
NAICS: 238290
New
Federal
J039--561A4-25-500 Elevator Repair Building 6 and 53
Solicitation # 36C24226R0097
Solicitation 36C24226R0097 is a Request for Proposal issued by the Department of Veterans Affairs for the emergency upgrade and modernization of four elevators at the VA New Jersey Healthcare System Lyons Campus, specifically targeting one passenger elevator in Building 6 and one service and two passenger elevators in Building 53. The scope of work requires the contractor to provide all labor, materials, and supervision to install non-proprietary microprocessor-based control systems, new geared machines, car operating panels with braille markings, hall fixtures at ADA compliant heights, and complete shaft wiring. All work must adhere to current safety codes, including fire recall features and door lock monitoring, and comply with the Davis-Bacon Act for prevailing wage rates. This procurement is a Service-Disabled Veteran-Owned Small Business set-aside under NAICS code 238290. To be eligible, the prime contractor must be a licensed elevator maintenance company with a full-time mechanic on staff and a clean safety record, certifying no more than three serious, one repeat, or one willful OSHA or EPA violation in the last three years. Proposals are evaluated based on technical capability, past performance, and price, with a requirement to submit a current Experience Modification Rate (EMR) and certifications for the Buy American Act and limitations on subcontracting. Following several extensions to accommodate requests for information, the final deadline for proposal submission is 1:00 PM on Thursday, October 29, 2026.
242-NETWORK Contract Office 02 (36C242)

POSTED

about 12 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

This contract involves comprehensive testing and inspection services for the boiler plant at the VA Northern Arizona VA Medical Healthcare System in Prescott, AZ. It covers both high-pressure steam boilers and electric boilers, requiring qualified technicians to perform semi-annual and annual inspections, safety device testing, calibration, and combustion tuning to ensure compliance with industry standards such as NFPA 85, ASME codes, and VA directives. The scope includes detailed internal and external inspections, non-destructive testing of pressure vessels, and calibration of control systems, with a focus on maintaining safety, reliability, efficiency, and longevity of the equipment. The contract spans a base period from November 1, 2024, through October 31, 2025, with four optional renewal periods extending up to October 31, 2029, and emphasizes strict adherence to safety, documentation, and reporting requirements, including detailed inspection reports submitted within one week of each service. The procurement is set aside exclusively for small businesses under NAICS code 238290, with a total small business set-aside designation, and the solicitation deadline is October 25, 2024.

General Info

Service agreement for boiler inspections at Northern Arizona VA Medical Healthcare System, 2024-2025.

Contract Value

$0

NAICS

238290 - Other Building Equipment Contractors

Place of Performance

Department of Veterans Affairs Northern Arizona Medical Healthcare System 500 N. Hwy 89 Bldg 111 and 162, Prescott,, AZ, 86313, USA

Set-Aside

SBA

Award Issued Date

Documents

5

#36C26225Q0047 Addendum to FAR 52.212-1 Instructions to Offerors

PDF, High priority: read this first6 pages · rfq-addendum
High

36C26225Q0047 Boiler Plant Testing and Inspections RFQ

DOCX, High priority: read this first20 pages · rfq
High

Amendment 0001 to RFQ 36C26225Q0047 - Boiler Plant Testing, Inspections and Repairs

PDF, High priority: read this first2 pages · amendment
High

VAAR 852.219-75 SDVOSB Certification

PDF, Medium priority3 pages · special-notice
Medium

RFQ 36C26225Q0047 Award Notice

PDF, Low priority1 page · award
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline changed from Oct 23, 2024 to Oct 9, 2024. The notice title changed.

Notice updated

Response deadline changed from Oct 9, 2024 to Oct 25, 2024. The notice title changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 262-NETWORK Contract Office 22 (36C262)
Contacts1 person available
OfficeGilbert, AZ, 85297, USA
Office AddressGilbert, AZ, 85297, USA
Contacts
Marco RamosContract Specialist

Full Description

Show more
Attachment 1: Combined Synopsis-Solicitation for Commercial Products and Commercial Services Effective Date: 03/15/2023 Revision: 01 Description This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2024-05 Dated 05/22/2024. This solicitation is Service-Disabled Veteran Owned Small Business (SDVOSB) and Small Business. The associated North American Industrial Classification System (NAICS) code for this procurement is 238290, with a small business size standard of $22 Million. The FSC/PSC is H244. The VA Northern Arizona VA Medical Healthcare System 500 N. Hwy. 89, Bldg 111 and 162, Prescott, AZ 86313 is seeking for Boiler Plant Testing. Price and Other Factors: See Attachment 2, FAR 52.212-2 Evaluation FAR Clause 52.219-75 Certificate of Compliance for Services and Construction is REQUIRED to be submitted at time of quote submission. Statement of Work for Boiler Plant Testing and Inspections for Steam & Electric Boilers This Statement of Work (SOW) describes the requirements for boiler and feedwater deaerator inspections, the inspection, testing and calibration of the boiler plant burners, controls, and instruments by qualified technicians. This also covers the requirements for the electric boilers within the Sterile Processing Service department. Boiler Plant inspections, safety device testing and calibrations are required to maintain compliance in accordance with (IAW) VHA Directive 1810, VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition, NFPA 85 Boiler & Combustion Systems Hazards Code, and ASME Boiler & Pressure Vessel Code. General Overview The services described in this SOW are required to maintain compliance with the VHA Directive 1810 Boiler and Boiler Plant Operations, VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition, NFPA 85 Boiler and Combustion Systems Hazards Code, and ASME Boiler and Pressure Vessel Code. NAVAHCS have a central high-pressure boiler plant to provide steam for heating and air conditioning, domestic hot water, kitchens, and sterilization. NAVAHCS also has electric boilers (also known as sterilizers) in our SPS Department which are also to be in compliance and are required to be inspected and tested. Boiler plant safety, reliability, efficiency, and equipment longevity are paramount concerns of NAVAHCS management. Boilers and feedwater deaerators are pressurized devices containing steam and hot water. They can fail catastrophically causing injuries and death and massive property damage. Regular inspections by experts are an essential part of a program to address these concerns. Definitions and Acronyms ASME American Society of Mechanical Engineers IAW In Accordance With VHA Veterans Health Administration NFPA National Fire Protection Association ANSI American National Standards Institute ASNT American Society for Non-Destructive Testing BEI Boiler Efficiency Institute CSD Controls & Safety Devices NB National Board NEC National Electrical Code NOx Nitrogen Oxides UT Ultrasonic Testing WFMT Wet Fluorescent Magnetic Particle Testing LOTO Lockout & Tagout M&O Maintenance & Operations FMS Facilities Management Service VAMC VA Medical Center PSI Pounds per Square Inch PSIG Pounds per Square Inch Guage EPA Environmental Protection Agency OSHA Occupational Safety & Health Administration ADOSH Arizona Division of Occupational Safety & Health ADEQ Arizona Department of Environmental Quality kW Kilo Watt PM Preventative Maintenance VA Veterans Affairs NAVAHCS Northern Arizona VA Healthcare System SPS Sterile Processing Service HTM Healthcare Technology Management Bldg Building Rm Room LB Pound HR Hour HP - Horsepower S/N Serial Number NLT No Later Than 3. Place of Performance NAVAHCS, 500 N Hwy 89, Bldg 111 (Boiler Plant), Prescott, AZ 86313 NAVAHCS, 500 N Hwy 89, Bldg 162 (SPS 2nd Floor), Prescott, AZ 86313 4. Period of Performance and Schedule Contract period of performance dates: Base Period: 11/1/2024 to 10/31/2025 Option Period I: 11/1/2025 to 10/31/2026 Option Period II: 11/1/2026 to 10/31/2027 Option Period III: 11/1/2027 to 10/31/2028 Option Period IV: 11/1/2028 to 10/31/2029 When will the services be performed (i.e. during business hours, after-hours, weekends, etc.). Work is to be done between the hours of 8:00 a.m. and 4:00 p.m. Monday thru Fridays, Requests for weekend work must be submitted in writing. At what frequency will services be performed (i.e. annually, quarterly, monthly, weekly, etc.)? Steam Boiler Inspections & Testing will be performed or provided Semi-Annually (2 times per year). 1st service will be required by NLT June 30th and the 2nd service will be required NLT December 31st. During the 1st inspection, combustion tuning will be provided, internal inspections, and safety device testing of all boilers will be completed. During the 2nd inspection, combustion tuning will be provided, external inspections, and safety device testing of all boilers will be completed. Electric Boiler Inspections & Testing will be performed or provided Annually (once per year). These will be performed NLT January 31st. During the inspection, the internal chamber will be inspected, safety devices, and the boiler will be required to be place into operation and programmed to perform safety faults as part of the required safety inspections and testing. Will services be provided on Federal Holidays? No services will be performed during holidays. 5. Equipment List List the equipment to be serviced with the make, model, description, location, and serial numbers. Keeler, 350 hp Watertube Boiler with 12,000 lb/hr Faber Burner, Bldg 111 Rm 100, S/N: 16031-1 Keeler, 350 hp Watertube Boiler with 12,000 lb/hr Faber Burner, Bldg 111 Rm 100, S/N: 16031-2 Keeler, 350 hp Watertube Boiler with 12,000 lb/hr Faber Burner, Bldg 111 Rm 100, S/N: 16031-3 Belimed AG, MST-V 600 Series, 45kW Electric Boiler, Bldg 162 Rm 230A, S/N: 3027399 Belimed AG, MST-V 600 Series, 45kW Electric Boiler, Bldg 162 Rm 230A, S/N: 3027398 Ace Tank & Heater Co, HS54-8, 1100 Gallon DA Tank, Bldg 111 Rm 100, S/N: 44583 Penway, 700 Gallon Condensate Tank, Bldg 111 Rm 100, S/N: A25957 6. Contractor Requirements NAVAHCS requires inspection of electric and steam boilers, safety device testing and calibration of SPS boilers and boiler plant burners, controls, instruments, data management and feedwater deaerators to be performed on the facility site location in Prescott, AZ. Contractor will provide the following services for the inspection of electric and steam boilers, safety device testing and calibration of SPS boilers and boiler plant burners, controls, instruments, data management and feedwater deaerators. Inspection Requirements Inspection, Testing, and Calibration Requirements Inspection Process of the Electric Boilers Steam Boiler Inspections & Testing will be performed or provided Semi-Annually (2 times per year). 1st service will be required by NLT June 30th and the 2nd service will be required NLT December 31st. During the 1st inspection, combustion tuning will be provided, internal inspections, and safety device testing of all boilers will be completed. During the 2nd inspection, combustion tuning will be provided, external inspections, and safety device testing of all boilers will be completed. Electric Boiler Inspections & Testing will be performed or provided Annually (once per year). These will be performed NLT January 31st. During the inspection, the internal chamber will be inspected, safety devices, and the boiler will be required to be place into operation and programmed to perform safety faults as part of the required safety inspections and testing. Identify inspection criteria, if applicable. Inspection Requirements: Annual internal and external inspections are required for each boiler. Internal inspections of the feedwater deaerator pressure vessel are required every six years (or more frequently if welding repairs have been performed). At least two weeks notice to NAVAHCS is required prior to an inspection. Also, the inspection must be scheduled for periods when NAVAHCS determines that the boilers that will be inspected internally will not be needed for steam supply and when the Contracting Officer s Representative (COR) or his/her designate is available on site to monitor the inspections. To maintain steam service, typically only one boiler at a time will be scheduled for internal inspections per inspection visit. Thus, multiple visits per VAMC facility will be necessary every year to inspect all the boilers internally. Feedwater deaerator pressure vessel inspections must be scheduled during periods of low steam demand. Coordinate the inspection schedule with the COR so that NAVAHCS can prepare the boilers and feedwater deaerator for the inspections in advance and have personnel available to monitor the inspections. Boilers scheduled for internal inspection will be prepared for the inspection by NAVAHCS prior to the scheduled arrival of the inspector. This includes cooling the boilers to near ambient temperature and having all manways, handholes and furnace access doors open; the boilers cleaned of loose materials waterside and fireside; electrical lock-out, tag-out in place; connecting piping isolated; proper illumination provided; compliance with confined space access requirements including having safety personnel present in the boiler plant. Similar advance preparations will be made to the feedwater deaerator when it is scheduled for internal inspection. NAVAHCS will comply with any other requirements of the inspector that are considered reasonable by NAVAHCS and have been presented in writing at least two weeks prior to the scheduled inspection. The boiler and feedwater deaerator inspections shall comply with the guidelines in the current issue of the NATIONAL BOARD INSPECTION CODE, Part RB, Inservice Inspection of Pressure- Retaining Items, and ASME Boiler and Pressure Vessel Code, Section VI or VII as applicable. In addition to those guidelines, the inspections shall comply with all NAVAHCS requirements as listed in this document. The inspector must completely enter the internal spaces of the boiler or feedwater deaerator and visually inspect all internal surfaces that can be accessed. Methods for testing safety devices shall comply with VHA Boiler and Associated Plant Safety Device Testing Manual, 8th Edition. Summary of the minimum inspection requirements for boilers: Review the boiler history including: operating conditions, date of last inspection, current inspection certificate, ASME stamping on boiler, National Board registration number, history of repairs and modifications. Review boiler logs, water test reports, and reports on tests performed on the burner controls and interlocks. Assess the external parts of the boilers and boiler accessories and piping and valves for safety, accessibility, proper maintenance and operation, cleanliness, and compliance with codes. Inspect for evidence of leakage of combustion gases or fluids, externally and internally, including all gaskets. Inspect foundations for signs of stress such as cracking or movement. Inspect boilers externally and internally for defects including bulges, blisters, cracks, wasted or eroded material, warping, general corrosion, grooving and pitting, damaged insulation. Inspect all accessible internal surfaces for waterside and fireside deposits, including scaling, sediment, debris, carbon deposits. Examine all stays and stayed plates. Inspect gas side baffles. Inspect internal drum surfaces and steam separating internals. Inspect soot blowers and verify proper alignment. Inspect tubes, tube ends and tube alignment. Check for sagging tubes. Verify that all nozzles of internal piping such as feedwater admission and bottom blowoff collection are clear with no obstructions. Inspect seating surfaces of manways and handholes. Check that boiler structure is plumb and level with no excessive deformations. Check for missing items such as bolts and nuts. Examine all valve and pipe connections to the pressure vessel. Inspect refractory including burner throat, expansion joint, bull ring, furnace seals, furnace walls and floor. Verify proper alignment of boiler assembly. Inspect furnace for evidence of flame impingement. Perform mechanical and electrical inspection of disassembled low water cutouts (disassembly by VA). Inspect piping connected to the boilers for evidence of leakage, provision for expansion, provision of adequate support, proper alignment, evidence of detrimental conditions. Inspect piping to the water column, low water cutoffs and alarms, gage glass. Verify that interior of piping is clear of obstructions. Provide recommendations for non-destructive testing when the inspections indicate that this is necessary to assure continued safety and reliability under current operating conditions. Summary of the minimum inspection requirements for feedwater deaerators: Review the feedwater deaerator history including: operating conditions, date of last inspection, current inspection certificate, ASME stamping, National Board registration number, materials of construction, extent of postweld heat treatment, history of repairs and modifications. Assess the external parts of the feedwater deaerator and accessories and piping for safety, accessibility, cleanliness. proper operation, and compliance with codes. Inspect for evidence of leakage. Verify that non-condensable gas vent line is open and proper orifice is provided to permit venting of gases. Inspect support structures for proper integrity and allowance for thermal expansion. Internal inspections (6-year intervals unless otherwise recommended because of welding repairs): Visually inspect all visible pressure vessel surfaces for corrosion, material thinning, deposits, and weld cracking. Inspect spray nozzles and trays. Certified American Society for Non-Destructive Testing (ASNT) Level II technicians shall perform non-destructive tests using the wet fluorescent magnetic particle (WFMT), ultrasonic testing (UT), and any other necessary non-destructive tests. Completely examine all accessible welds utilizing the WFMT test method. Properly prepare the surfaces before testing. Determine pressure vessel material thickness by UT. Thickness measurement locations shall be selected by dividing the storage tank heads into quadrants and taking measurements at each quadrant on two imaginary rings in each head (eight measurements total) . Measurement locations on the shell shall be on each of the quadrants, on four to six locations along the length of the shell (16 to 24 measurements total). The technician may recommend fewer or more tests to the owner, providing justification. Typically, the pressure vessel section containing the deaerator trays and sprays is not accessible for non-destructive testing. The experience is that this section, which is mainly exposed to steam, is less vulnerable to weld failures and material thinning than the storage section which contains condensate and make-up water. Calculate maximum allowable working pressure rating of vessel based on thickness measurements. Calculate depletion rate of material thickness. Inspection, Testing, and Calibration Requirements: Technicians shall provide all tools and labor necessary to perform inspection, tuning, testing, calibrating, and adjustments of burners and boiler and boiler plant controls as specified below. This shall be done every 12 months in accordance with a schedule provided by VAMC. VAMC may extend the schedule for burners in limited service. Instrumentation, monitoring and data management systems as listed below shall be calibrated every 12 months. Provide at least two-weeks notice to the Contracting Officer s Representative (COR) prior to performing the work. Work cannot be scheduled during heavy steam load periods. Only one boiler at a time can be out of service for the inspection, testing and calibration procedures. Work must be conducted when the COR or his/her designate is available on site to monitor the work. VAMC will have the boilers that are to be serviced prepared for the technicians upon their scheduled arrival. This includes having the boilers clean of soot and loose scale; fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner and fuel train pressure gages and thermometers calibrated; fuel meters in accurate operation (pressure/temperature correction factors provided, if applicable; boiler steam flow, stack temperature and flue gas oxygen instruments operating. VAMC will comply with any other requirements of the test personnel that are considered reasonable by VAMC and have been presented in writing at least two weeks prior to the scheduled testing. The inspections, testing and calibrations shall comply with: The recommendations and requirements of VHA Boiler and Associated Plant Safety Devices Testing Manual, 8th Edition. The written recommendations of the equipment manufacturers. The requirements and recommendations of NFPA 85 Boiler and Combustion Systems Hazards Code including applicable appendices. Burner performance requirements in this document. A summary of the work is as follows: Review boiler plant log sheets and alarm and trouble reports. Review records that show combustion performance (flue gas oxygen and carbon monoxide). Perform overall visual inspection of systems. Verify that systems comply with referenced codes and VAMC requirements stated in this contract. Operate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output. Compare the combustion performance data with VAMC requirements (see below) and previous readings. If necessary, adjust the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data. Verify accuracy of instrumentation listed below. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, code approval. Calibrate all instruments that are not within manufacturer s specifications for accuracy. Immediately inform COR of any recommended repairs or modifications. All of interlocks and safety devices to be inspected and tested on each boiler/burner/equipment, are contained in the VHA Boiler and Associated Plant Safety Devices Testing Manual,8th Edition, along with testing procedures. Required burner performance (natural gas and fuel oil): Turndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification). Achieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates. Maximum carbon monoxide: 200 parts per million (ppm). Maximum NOx: ______ (Refer to original burner specification). Flue gas oxygen: 2.5 4.2% (Up to 5.2% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing on single-point positioning systems). Flue gas oxygen (low excess air burners): 1.0 2.0% (Up to 2.5% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing on single point positioning systems). No visible smoke, except on heavy oil fuel maximum opacity is 20%. Comply with local emissions regulations. Flames shall be stable with no pulsations, shall be retained near burner, no blow-off or flashbacks, no constant flame impingement on refractory or waterwalls. List of instrumentation and controls to be inspected and calibrated: Steam flow transmitters (all). Steam flow recorders/computer readout. Flue gas oxygen sampling, analyzing and recorder/computer readout. Boiler and economizer stack temperature transmitters and recorder/computer readout. Master steam pressure and combustion controllers. All pressure and temperature sensors and transmitters. All signal processing and readout devices. Inspection Process of the Electric Boilers: Internal Inspection Process Turn off the sterilizer and the breaker and let it cool. Open the Sterilizer Steam Generator and clean for internal inspection. Check for the condition of the inside shell of the steam generator. Check for the condition of the electric resistance heaters. External Inspection Process Sterilizer closed and filled by technician for operation. Check for water leaks. Check for steam leaks. Check for pressure control operation. Check for high pressure manual reset control operation. Check sight glass and water level. Check main current terminals and heating elements. Check pressure gauge response. Check temperature sensor. Check safety valve and safety relieve valve operation. Check for low water manual reset operation. Check for ASME stamp on the steam generator. Check for Manufacturer Data Report on file. Check for the ASME Control and Safety Devices (CSD-1 Report) on file. Check sterilizer supports, piping, electrical, steam piping, feedwater piping, floor drain, and other components. Test the E-Stop Button at each exit which should be located at the entry to the sterilizer room with a sign that says sterilizer shutdown button. The expected result upon successful completion of each inspection will be a comprehensive report that clearly identifies all of the above inspection requirements and can be handed to a compliance inspector as requested during inspection intervals. 7. Reporting Requirements Contractor (or Representative) shall sign-in upon arrival at the M&O Supervisor Office, Bldg 167, Rm 001, at the beginning of each visit. All documentation for installation, inspection, and certifications shall be provided to NAVAHCS facilities personnel during the contract period. Documentation shall be provided in an electronic format (pdf). Thumb drives and/or CD s will not be accepted. Define the level of effort the reports should meet such as to what level of detail. Provide complete written report of the inspection fully describing all tests performed, all findings, and recommendations. The report shall have two sections the first section will be in a table form that with four columns: The first column labeled FUNCTION did the device pass or fail. The second column labeled DEVICE list the device number and description in accordance with the VHA Boiler and Associated Plant Safety Devices Testing Manual, 8th Edition. The third column labeled DEFICIENCIES-RECOMMENDATIONS . The fourth column labeled CORRECTIVE ACTIONS list any corrective actions taken during the inspection. Furnish report within one week of each facility inspection in Microsoft Word format by email to the COR. Provide hard copies of data sheets and flue gas analyzer strip printouts to the COR within one week of visit. All safety-related deficiencies shall be immediately reported to the COR, Boiler Plant Supervisor and/or Chief Engineer during the inspection visit. Provide complete written report fully describing all inspections and tests performed, findings, and recommendations. The condition of all items inspected shall be stated whether acceptable or deficient. All deficiencies shall be fully described along with recommendations for methods of correction. Utilize National Board Forms NB-6 and NB-7, or other similar forms acceptable to owner. Provide sketches and photographs as necessary and as requested by owner to show areas identified as not acceptable for continued service or requiring repair. Include test data and calculations. Show locations and extent of all non-destructive testing by sketches. Furnish report within one week of each facility inspection in Microsoft Word format by email to the COR. Provide recommendations on need for re-inspections after correction of deficiencies. Cost of re- inspections shall be extra cost negotiated with VA Contracting Officer. Contractor will provide performance review with closeout documents on UPS maintenance, Inspection, testing, and recommended repairs to NAVAHCS Facilities personnel & M&O Supervisor. 8. Applicable Documents The Contractor shall comply with the following requirements. Testing, inspection, and certification shall be accomplished by certified inspectors. Certificates shall be provided upon arrival prior to the certification process. Qualified Professional Inspectors as defined below shall perform internal and external inspections on high pressure (over 15 psig) steam and electric boilers and internal inspections on feedwater deaerators and other pressure vessels. Non-destructive testing of feedwater deaerator pressure vessels shall be performed by certified non-destructive testing technicians as defined below under the guidance of the Qualified Professional Inspector. Qualified Professional Inspector is defined as any one or combination of: A boiler inspector who has a valid commission from the National Board of Boiler and Pressure Vessel Inspectors (NB). A boiler inspector who has qualified by passing a written examination under the laws, rules and regulations of a jurisdiction of a state. A boiler inspector who is currently employed with a company that is on the ADOSH List of Authorized Boiler Inspection Companies - ADOSH - List of Authorized Companies for Boiler Inspections | Industrial Commission of Arizona (azica.gov) A boiler inspector who is regularly employed as a boiler inspector by a jurisdiction which has adopted and administers one or more sections of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code as a legal requirement, and has a representative serving as a member of the ASME Conference Committee. A boiler inspector who is regularly employed by an insurance company which has been licensed or registered by the appropriate authority of a State of the United States to write boiler or pressure vessel insurance. Qualifications for Non-Destructive Testing Technicians: The technicians shall be certified as being qualified Level II technicians in the non-destructive testing methods to be utilized. The certification shall be in accordance with the requirements of the American Society for Non-Destructive Testing (ASNT). Technician Qualifications: Technicians shall have completed at least a one-year trade school and have five years successful experience in this field. The experience shall be largely with institutional and industrial boiler plants similar in design to the VAMC plant. The VAMC facility manager/engineer may define and accept equivalent qualifications. Technicians shall demonstrate familiarity with and ready access to the current versions of the following references: NFPA 85, Boiler and Combustion Systems Hazard Code. VHA Boiler and Associated Plant Safety Device Testing Manual, 8th Edition. Technicians shall be equipped with portable electronic flue gas analyzers and other test instruments necessary for the required tests and calibrations, all calibrated within one month of the site visits. At facilities with programmable digital controls, the technicians must be capable of programming the controls and have the appropriate hardware and software for this. If Lockout Tagout procedures are required during or prior to inspection, that will be coordinated with the contractor or representative and the facility Boiler Plant Shop, Boiler Plant Supervisor, and M&O Supervisor prior to working on or access to equipment in accordance with VHA Directive 1028, VHA Directive 1810, NFPA 70E, and facility LOTO Program. If Confined Space Permit will be needed, that request will be coordinated prior to inspection with the contractor or representative and the facility Boiler Plant, Safety Department, Boiler Plant Supervisor, and the M&O Supervisor prior to performing any confined space entry IAW facility Confined Space program. For the Belimed Electric Boilers (Sterilizers) Coordination will be required to be made well in advanced to coordinate the Belimed Technician and Belimed Controls Technician to be onsite and available prior to performing inspections and safety device testing on the electric boilers. Coordination must also be planned with both SPS Department and Healthcare Technology Management (HTM). For this, we request that at minimum, we receive at least 30 days notice to provide proper coordination prior to scheduled inspections. Identify all applicable documents, regulations, industry standards, VA requirements, etc. If the regulation/standard/statute is not readily available for all potential offerors, provide a copy of it so it can be included in the solicitation and contract. The Qualified Professional Inspector shall demonstrate familiarity with and ready access to the current versions of the following codes and manuals: VHA Boiler and Associated Plant Safety Device Testing Manual, 8th Edition - VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition | Healthcare Environment and Facilities Programs (va.gov) VHA Directive 1810 Boilers and Boiler Operations Boiler and Boiler Plant Operations | Healthcare Environment and Facilities Programs (va.gov) VHA Directive 1028 Facility Electrical Power Systems Electrical Power Systems (Facility) | Healthcare Environment and Facilities Programs (va.gov) NFPA 70 National Electrical Code (NEC) NFPA 70E Electrical Safety in the Workplace NFPA 85 Boiler and Combustion Systems Hazards Code ASME Boiler and Pressure Vessel Code Section 1 Power Boilers Section 2 Heating Boilers Section 3 Care and Operation of Heating Boilers Section 4 Care of Power Boilers ASME CSD-1 Controls and Safety Devices for Automatically Fired Boilers ASME B31.1 Power Piping Code ANSI/NB-23 National Board Inspection Code Steam, Heating Hot Water, & Outside Distribution Systems Design Manuals - DESIGN MANUALS (PG-18-10) - Office of Construction & Facilities Management (va.gov) VA Steam Boilers Design Manual - dmSm01.pdf (va.gov) 9. General Requirements It shall be understood that, throughout performance of the contract, the Contractor s personnel, while on VA property, shall adhere to all requirements and regulations that govern the VA Health Care System and its property. Among all other requirements, the VA Health Care System and its property is now entirely smoke-free. 10. National Archives and Records Administration (NARA) Records Management Language for Contracts Citations to pertinent laws, codes and regulations such as 44 U.S.C. Chapter 21, 29, 31 and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act. Contractor shall not create...

More opportunities from Department Of Veterans Affairs → 262-NETWORK Contract Office 22 (36C262)

Same awarding agency

NAICS: 325120
New
Federal
AN11--501 - Dry Ice - Base 4
Solicitation # 36C26227Q0076
The Department of Veterans Affairs, through Network Contracting Office 22, has issued this Request for Information and Sources Sought Notice to identify qualified sources for the weekly delivery of 5/8-inch dry ice pellets. The requirement supports the Cooperative Studies Program Clinical Research Pharmacy Coordinating Center's Biorepository in Albuquerque, New Mexico. The anticipated scope involves the delivery of 600 pounds of dry ice pellets every Monday, totaling 31,200 pounds annually. The intended period of performance consists of one base year with four optional extension years. The government requires the vendor to provide specialized storage containers that are insulated with walls at least 2.5 inches thick, feature a hinged lid with a closing mechanism, and are equipped with at least four casters to support a minimum weight of 700 pounds. A critical performance standard is that the containers must limit sublimation loss to less than 8 percent of the total mass every 24 hours. This notice is issued for planning and market research purposes only and does not constitute a formal solicitation. Interested respondents must provide their business size status relative to NAICS 32510, SAM.gov entity details, and information regarding their capabilities, lead times, and compliance with the Buy American Act and the Non-Manufacturer Rule. Responses are due by November 4, 2026.
Industrial Gas Manufacturing

POSTED

about 12 hours ago

DEADLINE

in 6 days
View Details
NAICS: 811310
New
Federal
J041--PMI ICE Machine Service Contract -w/wd, B+4, POP 1/1/2027 - 12/31/2027
Solicitation # 36C26227Q0030
Solicitation 36C26227Q0030 is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside for comprehensive preventive maintenance, sanitation, and performance verification services for a fleet of 62 Follett ice machines and water dispensers. The services will support the Phoenix VA Healthcare System, covering the main campus and nine Community-Based Outpatient Clinics, including a location in Show Low, Arizona. The period of performance is scheduled from January 1, 2027, to December 31, 2027, with options to extend services. Maintenance frequencies are set at four preventive maintenance visits per year for the main campus and two per year for the clinics, encompassing refrigeration checks, descaling, electrical inspections, and deep cleaning in accordance with OEM specifications and healthcare facility standards. Award will be determined based on the most advantageous offer using a best-value comparative evaluation method rather than lowest price technically acceptable. Evaluation factors include the technical approach to meeting the statement of work, the offeror's specific experience in commercial refrigeration support over the past three years, price reasonableness, and past performance via CPARS. The successful contractor must provide all approved cleaning materials and safety data sheets, maintain specific insurance coverages for general, automobile, and employer liability, and adhere to strict personnel vetting and credentialing requirements. Invoices must be itemized by service date and contract obligation number to ensure payment processing.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

about 12 hours ago

DEADLINE

in 12 days
View Details
NAICS: 562211
New
Federal
F999--Hazardous Material & Waste Disposal
Solicitation # 36C26227Q0071
The Department of Veterans Affairs, through Network Contracting Office 22, has issued a sources sought announcement under solicitation number 36C26227Q0071 to identify qualified contractors for hazardous material and waste management services. This is a market research effort and not a formal solicitation for award. The scope of work involves providing all labor, materials, equipment, and transportation for hazardous waste disposal, collection, and emergency response services. Performance will take place at the Greater Los Angeles VA Healthcare System West LA Main Campus and various Community Based Outpatient Clinics, including locations in San Gabriel Valley, Santa Barbara, Santa Maria, San Luis Obispo, Bakersfield, and the Captain Rosemary Bryant Mariner clinic. The acquisition is classified under NAICS code 562211 for Hazardous Waste Treatment and Disposal, with a size standard of 47.0 million dollars. In accordance with Public Law 109-461, the government is considering a total set-aside for Service-Disabled Veteran Owned Small Businesses, though it may opt for alternate set-asides or full and open competition based on the responses received. Interested firms must be registered in the System for Award Management and, if applicable, the SBA VetCert system. To be considered, respondents must submit a capability statement detailing their qualifications and past performance from the last five years, along with a completed price schedule for market research purposes. All submissions must be emailed to the contract specialist by November 6, 2026.
Hazardous Waste Treatment and Disposal

POSTED

1 day ago

DEADLINE

in 8 days
View Details
NAICS: 811111
New
Federal
Yuma Mobile Vet Center (MVC) Repair
Solicitation # 36C26227Q0055
The Department of Veterans Affairs, through the Southern Arizona Health Care System, is soliciting quotes for a firm-fixed-price service contract to perform non-mechanical body repairs on Mobile Vet Center 0828. The scope of work involves repairing cosmetic and potential structural damage to the driver's rear side, including the removal and replacement of damaged body panels, decals, and the body wrap. The selected contractor will be responsible for repainting repaired surfaces to match the existing finish and providing a craftsmanship warranty on all work. Performance will take place in Tucson, Arizona, with a base period of performance from December 1, 2026, to November 30, 2027. This opportunity is a total Small Business Set Aside, and the government will evaluate offerors based on their service-disabled Veteran-owned or Veteran-owned small business certification status and their intent to use such entities as subcontractors. Proposals must be submitted by November 9, 2026, at 11:00 am. A site visit is scheduled for November 3, 2026, in Tucson. To be eligible for award, offerors must provide a signed certification regarding limitations on subcontracting and represent compliance with FASCSA and telecommunications prohibitions. Payments will be processed via Electronic Funds Transfer through the System for Award Management.
General Automotive Repair

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 335910
New
Federal
6135--UPS Battery Replacement
Solicitation # 36C26227Q0064
Solicitation 36C26227Q0064 is a firm-fixed-price request for quotes issued by the Department of Veterans Affairs, NCO 22, for the one-time replacement of 60 batteries for the Main Server Uninterrupted Power Supply (UPS) at the San Diego VA Medical Center. This procurement is a total small business set-aside under NAICS code 335910, with a small business size standard of 1,250 employees. The scope of work requires a certified technician to remove and replace 60 C&D UPS12-545PLP batteries across two cabinets in Building 1, Room BB100-1. The contractor is responsible for all freight, installation, testing, removal, and recycling costs, and must ensure the work is completed during one coordinated event within 365 days after receipt of order. The award will be based on price only. Offerors must submit a completed and signed SF 1449 via email to the contracting officer by 15:00 Pacific Local Time on November 10, 2026. Required submission elements include the vendor's SAM UEI number, acknowledgement of amendments, specific manufacturer and model numbers, and a certificate of compliance regarding limitations on subcontracting. Performance requires strict adherence to safety protocols, including Lock out/Tag out procedures on the primary feed and tightening terminals to manufacturer torque specifications. The contractor must maintain all necessary licenses and insurance, and comply with Buy American and other federal regulatory clauses.
Battery Manufacturing

POSTED

1 day ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS