Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Y--HAFE 242454, Pavement Preservation Project

Active
140P2026R0064Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of the Interior’s National Park Service, through its Denver Service Center’s Contracting Services Division, is conducting market research for a pavement preservation project at Harpers Ferry National Historical Park in West Virginia under solicitation number HAFE 242454. This effort is a Sources Sought Notice, not a solicitation for proposals, and is intended to gather information from small businesses to shape a future procurement. The project scope involves comprehensive road and bridge preservation services including asphalt pavement treatments such as street sweeping, crack sealing, chip sealing, surface sealing, and deep patching, along with pavement marking removal and installation, drainage improvements, earthwork, traffic control, and tree protection. Work must be carefully scheduled between 9:00 a.m. and 3:30 p.m. with no more than one lane closed at a time to minimize disruption to park visitors, and seasonal closures will be enforced. Protective measures are required to preserve the historical and natural environment. The estimated contract value ranges from $1 million to $5 million, and the anticipated performance period is 140 calendar days, accounting for weather-related delays. The acquisition is structured as a total small business set-aside under NAICS code 237310, with a small business size standard of $45 million in annual revenue. Interested firms must submit their company information, including UEI number, point of contact, business size status, bonding capacity statement, and evidence of relevant past experience on similar projects by May 8, 2026, via email to Contracting Officer Rachel Dyer. Formal performance and payment bonds will be required upon contract award, but not at this stage. A formal request for proposals is expected to be issued in late summer or fall of 2026, at which time detailed specifications, evaluation criteria, and submission guidelines will be provided.

General Info

Pavement preservation contract for Harpers Ferry National Park, $1M–$5M, small business set-aside, work planned for 2026.

Agency

Department Of The Interior → Dsc Contracting Services DivisionView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CO

Set-Aside

SBA

Documents

(12)

HAFE 242454 Pavement Preservation Sources Sought Notice

DOCXsources-sought

Solicitation 140P2026R0064 Harpers Ferry Pavement Preservation

PDFifb

B08 Attachment 5 General References Form

PDFgeneral-references

Solicitation 140P2026R0064 Harpers Ferry Pavement Preservation Price Schedule

XLSXprice-schedule

Harpers Ferry National Historical Park Pavement Preservation Project Specifications

PDFspecifications

Wage Determination WV20260111 for Highway Construction in Jefferson and Mineral Counties

PDFwage-determination

Solicitation 140P2026R0064 for Pavement Preservation at Harpers Ferry National Historical Park

PDFifb

Report on Limitations on Subcontracting for Contract 140P2026R0064

XLSXsubcontract-percentage-worksheet

Amendment 0001 to Solicitation 140P2026R0064

PDFamendment

B08 Attachment 2 HAFE 100 Drawing Plans - Harpers Ferry Pavement Preservation

PDFspecifications

Solicitation 140P2026R0064 Past Performance Questionnaire

DOCXpast-performance

Experience Information Form Attachment 8

DOCX1 pagepast-performance

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseSolicitation
Posted

Sources Sought

Type Changed

Sources Sought → Solicitation

Amendment 1

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts1 person available
OfficeDenver, CO, 80225, USA
Organization / Agency
Department Of The Interior → Dsc Contracting Services Division
View Agency Profile
Office AddressDenver, CO, 80225, USA

Full Description

Show more
HAFE 242454, Pavement Preservation Project

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry and Exit Paving Redevelopment Project will comprehensively upgrade the entry and exit drives along 19th Ave W, the footprint of the Downie Building (C-14), and surrounding parking areas. Damaged pavement will be milled and overlaid, while outdated stormwater infrastructure will be replaced and expanded to divert runoff from combined sewers to dedicated storm lines, with water quality treatment integrated into qualifying pavement replacements. The remaining slab of the C-14 building will be demolished and replaced with a mix of new parking spaces and green areas designed as pollinator habitats, potentially including a stormwater treatment facility. A new irrigation system will support the landscaping, which also extends to the median within the entry drive, and electric vehicle charging stations will be installed in the new parking zones. The project will enhance nonmotorized transportation by introducing a protected two-way bike lane linking the terminal to the existing West Wall bike path, improving pedestrian access to the intersection at 21st Ave W and W Emerson Pl, as well as the nearby King County Metro bus stop. Lighting will be upgraded throughout the new parking area and connecting pathways to ensure safety and visibility. Additional wayfinding signage will guide pedestrians and cyclists through the redeveloped space. The work is being managed by the Port of Seattle through its Waterfront Project Management office, with Mike Van Cleve and Terrence Moody serving as the primary point of contact and project manager respectively, under the NAICS code 237310 for sewer and water infrastructure construction. The project is forecasted with a posting date of July 24, 2026.
Waterfront Project Management

POSTED

about 3 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026The contract encompasses a broad range of pavement and infrastructure maintenance activities to be carried out across multiple sites within the Seattle-Tacoma International Airport, Maritime Properties, and adjacent areas. Work includes new asphalt paving and patching, overlays with fabric backing, crack sealing, seal coating, profile grinding, removal and disposal of grinding spoils, stripping of existing pavement markings, surface preparation for new striping, various paint striping, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, sidewalk lifting and leveling, and upgrades to road drainage systems, some of which may require permitting. All tasks must be executed with precision and in compliance with applicable standards at Port of Seattle facilities. The contract is identified as a forecast for Asphalt Paving & Striping Portwide Unit Price 2026 under NAICS code 237310 and is managed by Port Construction Services under the Port of Seattle. Primary point of contact is Heather Bowden, reachable via email and phone, with Lesley Miles serving as the Project Manager. The solicitation is posted on the Port’s official portal, though no solicitation number has been assigned yet, and the anticipated performance period aligns with the 2026 fiscal timeline. The scope is unit-priced, indicating payment will be based on measured quantities of completed work rather than a fixed lump sum, and the work locations span the Port's operational footprint, requiring coordination across diverse and active areas.
Port Construction Services

POSTED

about 3 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
Federal
MT FLAP BLACKF 12(1) & MT NP GLAC 12(2), FLAP & FLTP Rehabilitation of Two Medicine RoadThis solicitation, numbered 69056726B000005, is a sealed bid for the rehabilitation of Two Medicine Road in Montana, specifically targeting the MT FLAP BLACKF 12(1) and MT NP GLAC 12(2) segments, spanning 7.22 miles located four miles northwest of East Glacier Park. The project involves reconstruction of asphalt roadway, replacement of existing culverts, milling and overlay of two parking areas, and associated small-scale work. All work must comply with the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24, and will be executed using the Masterworks web-based system for submittals and documentation. The place of performance is in East Glacier Park, Montana, with the contract administered by the U.S. Department of Transportation, Federal Highway Administration’s Western Federal Lands Division based in Vancouver, Washington. The solicitation was issued on July 1, 2026, with bids due by July 31, 2026, and the contract award will be determined solely on price, with a 10% evaluation preference applied to bids submitted by HUBZone small business concerns. For joint ventures, the HUBZone small business partner must perform at least 40% of the total work to be eligible. The successful bidder must begin work within ten calendar days of receiving a notice to proceed and complete all construction, including final site cleanup, no later than October 15, 2027, assuming timely notice issuance. A comprehensive Quality Control Plan must be submitted 14 days prior to commencement, featuring a qualified Quality Control Manager with no conflicting responsibilities and a designated alternate. The contractor is required to provide and maintain linear control charts at the project lab and job site, documenting all testing parameters and results. All field samples must be individually labeled and logged with project, contractor, sampler, batch, sample number, date, time, installation date, and lab information. Specific materials such as culvert liners must be handled, stored, and transported per ASTM F2019 and manufacturer guidelines, with full technical data provided. The contract includes detailed line items for mobilization, surveying, quality control, testing, riprap placement, base grading, ditch reconditioning, equipment usage, pavement markings, traffic control, flagpole installation, wetland mitigation, and a mandatory $404,000 Blackfeet Impact Fee. The offeror must maintain
690567 Western Federal Lands Division

POSTED

about 10 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
Federal
Y--GOGA 319407 - Bridge PreservationThe U.S. Department of the Interior, through the National Park Service’s Denver Service Center Contracting Services Division, is conducting market research for a bridge preservation project under solicitation number 140P2026R0053, identified as GOGA 319407. The project involves preservation and repair work on ten bridge structures within the Golden Gate National Recreation Area, including Easkoot Bridge, Rodeo Lagoon Pedestrian Bridge, Point Bonita Viaduct, Crissy Field Bridge, and Point Lobos Viaduct. Work scope includes concrete repair, guardrail and steel rail painting, timber replacement and preservation, installation of stormwater management systems, removal of trees and fences, sidewalk joint repairs, and hazardous materials abatement. All work must be conducted with strict environmental and cultural resource protections due to the proximity of sites to waterways, wetlands, and high-traffic public areas, with an anticipated completion window of 200 calendar days and a planned finish date aligned with Winter 2028. The anticipated contract type is Firm-Fixed-Price, and the procurement is set aside for small businesses under NAICS Code 237310, which carries a $40.5 million size standard. Bonding capacity, including bid, performance, and payment bonds, will be required, and offerors must demonstrate relevant experience in federal bridge preservation, environmental compliance in sensitive areas, and ability to operate within constrained site conditions. The solicitation is currently in the pre-solicitation phase as a Sources Sought Notice, and formal contract terms have not yet been issued. Submissions are limited to a completed questionnaire and a capabilities statement, to be emailed by the deadline of May 5, 2026, to the Contracting Officer, Shellie Murphy. The questionnaire requires entities to provide their Unique Entity Identifier, certify their size and socioeconomic status—such as WOSB, SDVOSB, HUBZone, or other small business classifications—and confirm bonding capacity. While no formal evaluation criteria with assigned weights or a stated basis of award such as LPTA or trade-off have been defined, factors under consideration include prime contractor experience with similar projects, environmental sensitivity, and small business status. No detailed packaging, marking, or inspection standards are specified at this stage, and no financial figures, CLINs, or appropriation data are available because this is not a priced solicitation. All communication and submissions must be directed to the Denver-based
Dsc Contracting Services Division

POSTED

about 10 hours ago

DEADLINE

in 17 days
View Details
NAICS: 237310
New
Federal
Z--GAOA SOUTH PRYOR ROADSThe Department of the Interior, Bureau of Land Management Montana State Office, is soliciting proposals under solicitation number 140L3626R0001 to restore approximately 13 miles of Gyp Springs and Helt Roads in Carbon County, Montana, under a Firm Fixed Price contract designated as a Total Small Business Set-Aside under FAR 19.5. The work involves re-establishing the road’s typical section, grade, and drainage; performing excavation and embankment; placing crushed aggregate surfacing; implementing erosion and sediment controls; seeding; and topsoil placement, all in strict accordance with detailed technical specifications divided into ten divisions including earthwork, aggregate courses, incidental construction, and materials. The project requires compliance with ASTM standards for testing, adherence to approved contract drawings, and management of a Stormwater Pollution Prevention Plan. Contractors must submit a construction schedule within 14 days of notice to proceed, and no progress payments will be issued until the schedule is approved. All work must preserve public and private property, protect monuments, and maintain continuous access to surrounding roads, trails, and facilities. Site inspection is strongly encouraged, and failure to do so bars any claim after award. The contract is estimated between $500,000 and $1,000,000 and must be performed by a small business certified under the NAICS code 237310 with a size standard of $45 million in annual receipts. Proposals must be submitted electronically via email to Jorge Alvarez at jalvarez@ios.doi.gov no later than 1:00 p.m. Mountain Time on August 17, 2026, and must include company details, Unique Entity ID from SAM, socio-economic certifications, a capabilities statement, and a review of the specifications and drawings addressing potential issues. All offerors must be registered in the System for Award Management (SAM) prior to proposal submission and award. Payment must be requested electronically via the U.S. Department of the Treasury’s Invoice Processing Platform (IPP), with written waiver requests required if IPP compliance is not possible. The Contractor is responsible for obtaining all necessary permits beyond those provided by the Government, indemnifying the Government against claims arising from noncompliance with laws or regulations, and ensuring all materials meet manufacturer certifications with test data and traceability. Final acceptance is contingent on visual inspection and documented compliance, and successful completion relieves the Contractor of further maintenance obligations. All communications with government personnel are
Montana State Office

POSTED

about 10 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
Federal
CO NP BLCA 10(1) South Rim DriveThe U.S. Department of Transportation’s Central Federal Lands Division is seeking expressions of interest from qualified small business prime contractors, including HUBZone, 8(a), women-owned, and service-disabled veteran-owned businesses, for the CO NP BLCA 10(1) South Rim Drive project. This is a sources-sought notice, not a formal solicitation, aimed at determining sufficient interest to justify a small business set-aside. Interested firms must respond by August 7, 2026, via email with a statement of intent to bid, confirmation of applicable socioeconomic certifications, a bonding agent letter verifying capacity for a $2 million single project and aggregate bonding limits, and a detailed list of past projects involving selective boulder removal, site grading, specialized guardrail procurement and installation, and traffic control—specifically referencing work equivalent in scope to this project. The project requires the removal of hazardous boulders and old guardrails along a scenic corridor in Colorado’s National Park Service land, followed by grading, base preparation, and installation of 4,100 linear feet of weathered-look steel guardrail with Natina stain treatments, along with eight terminal systems and fourteen tangent terminals. Work will occur across twelve distinct locations and demands precise traffic control during seasonal operations. The estimated contract value ranges from $700,000 to $2 million, with a critical eight-week lead time for guardrail procurement influencing the schedule: notice to proceed is anticipated in mid-October 2026 so that materials can be ordered and cured over winter, with active construction set to begin in early April 2027 and conclude by late May 2027. All bidders must be registered in SAM.gov and comply with SBA affiliation and size determination rules under 13 CFR 121.103 and 121.108.
6982AF Central Federal Lands Divisi

POSTED

about 10 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237310
New
International
Ottawa River East Pathways (OREP) Rehabilitation ProjectThe National Capital Commission is soliciting proposals for the rehabilitation of the New Orchard Twin Bridge on the Kichi Zibi Mikan Parkway in Canada’s National Capital Region, a project aimed at extending the bridge’s operational life by at least 30 years through comprehensive structural and surface upgrades. The work includes partial depth concrete repairs on abutments, wing walls, bearing seats, soffits, fascia, deck, and deck ends; replacement of concrete curbs, sidewalks, and curtain walls; installation of crash-tested railings; replacement of the waterproofing system and asphalt pavements; replacement of bridge bearings and approach slabs; and repair of flagstone slope protection. Work must adhere to ASTM standards for steel pipe, zinc coatings, and stainless-steel tubing, as well as specific construction sections detailing selective demolition, cast-in-place concrete, metal fabrications, and earthwork. All materials must be delivered in original factory packaging with clear labeling identifying manufacturer details, type of coating, compliance standards, and color numbers; asbestos-containing materials must be contained in sealed metal or polyethylene bags with bilingual warning labels, and all materials must be stored off the ground in clean, dry, ventilated areas, protected from damage and replaced if defective. Proposals must be submitted by June 30, 2026, at 2:00 PM EDT via three separate encrypted emails to Bids-soumissions@ncc-ccn.ca, with mandatory submission documents, rated technical criteria, and pricing form delivered in distinct envelopes. All submissions must be in English or French, in PDF format, under 30 MB, printed on 8.5 x 11 inch paper, and use Arial 10pt, Calibri 11pt, or Times New Roman 12pt font, with numbering aligned to tender documents. Proponents must pass four non-negotiable gates: submission of the required form, pricing form, certificate of insurance verifying a minimum $5 million commercial general liability policy with NCC named as additional insured, and bonding verification. Technical evaluation is weighted at 70 points total, with 40 points allocated to approach and methodology and 30 points to the qualifications of the lead project manager and site superintendent; a minimum score of 70 is required to advance to financial evaluation, where the best evaluated price determines award. Key personnel must be assigned and meet experience criteria, and the proponent must hold a valid security clearance, designate a Company Security Representative to manage fingerprint submissions, and comply
National Capital Commission

POSTED

about 17 hours ago

DEADLINE

in 6 days
View Details

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237990
New
Federal
Y--KNRI 257081¿ Knife River Indian Village National HThe contract solicitation for Knife River Indian Village National Historic Site - Elbee Bend Bank Stabilization, identified as KNRI 257081 and solicitation number 140P2026R0086, seeks a contractor to execute riverbank stabilization work at a federally designated national historic site. The project requires comprehensive earthwork, riprap installation, erosion control, site restoration, and archaeological protection measures, all governed by strict construction specifications and environmental compliance protocols. The scope includes clearing and grubbing, excavation support, drainage installation, topsoil application, seeding, and the construction of temporary access roads and river crossings as bid alternates. The work must adhere to federal standards, utilize materials with high recycled content as defined by ASTM and EPA guidelines, and follow sustainability requirements emphasizing minimal packaging and recyclable materials. Proposals must be submitted via email by August 6, 2026, in two electronic volumes addressing technical approach, project and personnel experience, management systems, past performance, and small business participation, with separate pricing documents in compliance with FAR requirements. The evaluation follows a best value continuum tradeoff process where technical merit and price are approximately equally weighted, favoring balanced, well-documented proposals that demonstrate realistic scheduling, risk mitigation, and qualified key personnel including a project manager, safety manager, and quality control manager. The contract imposes stringent administrative conditions, including mandatory use of the Invoice Processing Platform (IPP) for payment requests, with draft invoices required seven days in advance and a signed COR cover letter needed for final submission. Failure to receive the cover letter within seven days allows submission with the draft review email to meet Prompt Payment Act timelines. Contractors must have an active SAM registration with a Unique Entity ID and provide full representations regarding small business status, WOSB eligibility, and joint venture structure if applicable. The project must commence within ten days of notice to proceed and be completed within 365 days, with liquidated damages enforceable for delays and suspension of work governed by applicable FAR clauses. All materials require manufacturer certification, ISO 9000 compliance, or an equivalent inspection system, with off-site components subject to pre-fabrication inspection. The contracting officer holds sole authority to modify terms, while a designated Contracting Officer’s Representative will handle technical oversight. Performance is tied to detailed geotechnical recommendations, permit conditions, and archaeological protection protocols, ensuring preservation of cultural resources while achieving durable bank stabilization. Subcontractor payments must be certified, final payment requires a DI-13
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 27 days
View Details
NAICS: 237310
New
Federal
Y--DEWA 310424 - Safety and Pavement Improvements to The contract pertains to safety and pavement improvements along Route 209 and McDade Trail within the Delaware Water Gap National Recreation Area, identified by PMIS numbers 310424, 325752, and 324741, with an estimated value exceeding $10 million and a performance period of 544 calendar days following the notice to proceed. The scope encompasses pavement preservation, slope stabilization using percussion-driven earth anchors, culvert repairs, guardrail replacement with Natina-coated materials, boardwalk construction featuring steel H-piles and concrete structures, erosion and sedimentation control, stormwater management via HDPE piping and regenerative conveyance systems, and installation of wayfinding signage not compliant with MUTCD standards. The project requires strict adherence to construction standards across multiple divisions including earthwork, concrete, transportation, utilities, and pollution control, with all work subject to visual inspection and testing per AASHTO, ASTM, or designated agency procedures, and results must be reported to the Contracting Officer within 24 hours of sampling. The solicitation is structured as a negotiated Request for Proposal under FAR Part 15, utilizing the Best Value Continuum Tradeoff Process, where non-price factors—project experience, technical approach, key personnel, and other criteria—are significantly more important than price, and the government may select a higher-priced proposal based on superior technical merit. All proposals must be submitted via email to specified NPS addresses with strict formatting rules, including separate technical and business volumes with specific naming conventions and file size limits not exceeding 38 MB per attachment or 100 MB per email. Compliance with SAM registration, UEI, and small business representation requirements is mandatory, with the procurement designated as a Small Business Set-Aside. Key personnel including a Project Manager, Safety Manager, Environmental Specialist, and others must be assigned with restrictions on substitutions during the first 30 days of performance. The contractor is required to use the Invoice Processing Platform (IPP) for payment submissions, following a two-step process requiring a draft package sent to the COR and CMR at least seven days in advance, with final invoice upload contingent upon a signed cover letter, or alternatively upon confirmation of the draft email if the letter is not received within the timeframe. Materials must be delivered undamaged in original manufacturer packaging with full labeling, including lot numbers, expiration dates, and safety information for pavement marking products, and must utilize biodegradable or recyclable packaging to the greatest extent possible. The
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 4 days
View Details
NAICS: 237110
New
Federal
Y--GRCA 318719_Temporary WWTP at North RimThe U.S. Department of the Interior, through its Denver Service Center Contracting Services Division, is preparing to procure the installation of a temporary wastewater treatment plant at the North Rim of Grand Canyon National Park under solicitation number 140P2026R0075. This project, identified as GRCA 318719, is designed to provide interim wastewater treatment capacity for campgrounds and visitor facilities while the permanent system undergoes upgrades. The work is to be performed at the North Rim, Arizona, a remote, high-elevation location with seasonal access limited to May through October and restricted road and staging areas. The facility must meet effluent standards set by the Arizona Department of Environmental Quality and will be constructed without requiring helicopter transport of materials or equipment. The estimated contract value exceeds $10 million, with a projected performance period of 420 calendar days following notice to proceed. The requirement is currently unfunded but has a high expectation of future funding availability. This procurement is structured as a total small business set aside under NAICS code 237110, which carries a size standard of $45 million in annual revenue, with the government actively seeking to maximize participation by small businesses, veteran-owned small businesses, small disadvantaged businesses, and women-owned small businesses. Prospective offerors must hold an active registration in the System for Award Management and possess a DUNS number to be eligible. The solicitation is scheduled to be issued in June 2026, with proposals due by July 29, 2026. While the pre-solicitation notice outlines the overall scope, performance requirements, and set-aside status, detailed specifications, drawings, evaluation criteria, contract clauses, and submission instructions will be provided in the official solicitation documents, which have not yet been released. All award-related information and contract administration details remain pending the formal release of the solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 5 days
View Details
NAICS: 237310
New
Federal
SC Multi Parks (CONG, COWP, KIMO, NISI) - PavementThe Department of the Interior, through its DSC Contracting Services Division, is conducting market research for a pavement preservation project encompassing four national park sites in South Carolina: Congeree National Park, Cowpens National Battlefield, Kings Mountain National Military Park, and Ninety Six National Historic Site. This presolicitation action, identified by solicitation number 140P2026R0054 and classified under NAICS code 237310, aims to gather industry input to determine the feasibility of a potential small business or socio-economic set-aside and to inform the structure of a future competitive Request for Proposals expected to be issued in fall 2026. The project will involve pavement preservation activities across 11.48 roadway miles and 0.71 parking miles, with the goal of extending pavement life and deferring more costly rehabilitation. The anticipated contract, if solicited, will be awarded as a Firm-Fixed-Price (FFP) with an estimated performance period of 132 calendar days following the Notice to Proceed, inclusive of weather-related delays. Critical performance constraints require that all parks remain fully operational during construction, with particular emphasis on maintaining public access to roads and parking areas during the week of July 4th. Construction at Kings Mountain National Military Park must conclude before October 1, while no work is permitted at Congeree National Park during the Synchronized Firefly Festival (mid-May to early-June) or between October 15 and 18. Winter construction may be necessary, and staging areas are limited, requiring approval from the Contracting Officer’s Representative. Bonding and insurance requirements are anticipated to include bid, performance, and payment bonds. Respondents are asked to provide company details including UEI, contact information, and socio-economic certifications such as HUBZone, WOSB, SDVOSB, or other veteran- or Native American-owned business status to assist the government in determining appropriate set-aside options. No technical specifications, drawings, or formal proposal packages are available at this stage, as this is strictly a market research tool with no proposals being accepted.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 27 days
View Details