Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Illinois was posted on September 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hazardous Material Sampling and Abatement

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was necessitated by a sprinkler system failure and requires the remediation of mold throughout the entire building, including the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA and OSHA regulations, and the Micro Air Inc. Mold Testing report dated April 11, 2024. The contractor is required to provide a Certified Industrial Hygienist to verify materials and perform the final clearance walkthrough, as well as a detailed remediation plan covering containment, filtration, and waste handling. This is a single lump sum contract set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Award decisions are based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). A mandatory site visit was scheduled for October 27, 2026, with proposals due by November 10, 2026. Successful bidders must provide proof of an Indiana Contractor's License, Davis-Bacon Act wage rate compliance, and specific automobile and workers compensation insurance. Work must commence within 14 days of the Notice to Proceed, and all workmanship is guaranteed for one year. Payment terms are Net 30.
Atterbury Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in about 12 hours
NAICS: 562910
New
SLED
C5613679-D - ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES
Solicitation # C5613679-D
This Master Agreement establishes a contract for the California Department of Corrections and Rehabilitation (CDCR) to obtain as-needed services for the cleaning, removal, transport, and disposal of hazardous materials, including asbestos-containing construction materials, lead-based paint, lead-containing materials, and mold-contaminated materials. The scope of work covers various CDCR institutions and facilities, such as High Desert State Prison, Ironwood State Prison, and Kern Valley State Prison. The contractor is responsible for all associated costs, including labor, equipment, personal protective equipment, and disposal fees, with compensation based on the Public Works Rate Sheet. Key performance requirements include a four-hour response time for emergency abatement and a strict submittal process that must be completed five business days before site work begins. The contract is awarded to the lowest responsive bidder, with preferences granted to California-based companies and certified Small, Micro, or Disabled Veteran Business Enterprises. Compliance with Federal, State, and local laws is mandatory, specifically Title 17 of the California Code of Regulations for lead abatement and Senate Bill 854 for prevailing wage requirements. Contractors must provide proof of pollution liability insurance and a payment bond upon award. Work is generally performed Monday through Friday from 6:30 AM to 3:00 PM, and the CCM Site Supervisor serves as the sole authority for determining the acceptance and satisfactory completion of all work.
California Department of Corrections & Rehabilitation

POSTED

1 day ago

DEADLINE

in 26 days

AI Contract Overview

Show more

This subcontract for Hazardous Material Sampling and Abatement involves the sampling and removal of asbestos-containing building materials for prime contractors on City of Aurora projects. The scope of work includes the removal of both friable and non-friable asbestos using containment barriers and HEPA vacuums, ensuring strict adherence to USEPA NESHAPS, OSHA, and IDPH regulations. The selected provider is responsible for delivering comprehensive sampling reports and certified clearance. To qualify for this engagement, the contractor must be a Licensed IDPH Abatement Contractor and employ a Licensed IDPH Inspector. The opportunity is categorized under NAICS code 562910 and is managed by the Engineering agency in Illinois. Interested parties must submit their responses by the deadline of October 14, 2026.

General Info

IDPH licensed contractor for asbestos sampling and abatement on City of Aurora projects.

Place of Performance

IL, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-078.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Demolition of Structure at 512 N. Broadway

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois → Engineering
ContactsNo contacts available
OfficeN/A
Organization / AgencyIllinois → Engineering
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs sampling and removal of asbestos-containing building materials (ACBM) for prime contractors on City of Aurora projects. Samples suspect materials and removes friable/non-friable asbestos using HEPA vacuums and containment barriers per USEPA NESHAPS, OSHA, and IDPH regulations. Requires Licensed IDPH Inspector and Licensed I.D.P.H. Abatement Contractor. Delivers sampling reports and certified clearance.

More opportunities from Illinois → Engineering

Same awarding agency

NAICS: 237110
New
SLED
Lead Service Replacement - Street Resurfacing Blocks
Solicitation # 26-118
The City of Aurora, Illinois, has issued solicitation number 26-118 for the full replacement of lead water service lines from the water main to the water meter. This project is designed to be executed on a block-by-block basis, specifically coordinating replacements with the city's planned roadway resurfacing activities. The scope of work includes the removal and plugging of abandoned services, installation of new lines, and comprehensive surface restoration. Contractors must adhere to strict compaction standards, with sub-grade and backfill reaching 95 percent maximum density for pavements and 85 to 90 percent for unpaved areas. The project requires the use of GPS shots to record the locations of removed services and installed plugs. The contract will be awarded to the lowest responsive and responsible bidder, with an emphasis on price, capacity, and qualifications. Bidders must submit their proposals electronically via the OpenGov portal by November 18, 2026. Required submission documents include a bid guarantee of at least 5 percent of the total bid, a compliant Certificate of Insurance, an IDOT Prequalification Form, and evidence of participation in registered apprenticeship and training programs for contracts exceeding 25,000 dollars. The successful contractor must provide a performance and payment bond for 100 percent of the contract sum and maintain a one-year performance guarantee after final payment. The project must reach substantial and final completion within 365 calendar days. Notably, underground utility installation is generally prohibited between October 31 and April 1, unless directed by the Engineer, and any restoration for utilities installed before October 31 must be completed by November 15 of the same year. The contract is subject to the Illinois Non-Appropriation Clause, allowing the city to cancel the service with a 30-day notice if funds are not approved. Contractors are also required to comply with Illinois prevailing wage laws, ADA accessibility requirements for sidewalks, and the Illinois Toxic Substances Disclosure to Employees Act by providing necessary Safety Data Sheets.
Water and Sewer Line and Related Structures Construction

POSTED

4 days ago

DEADLINE

in 10 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS