Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

HAZEL AVENUE/U.S. 50 INTERCHANGE PROJECT

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Hazel Avenue/U.S. 50 Interchange Project is a forecast infrastructure initiative managed by Sacramento County, located within the cities of Rancho Cordova and Folsom. The scope of work involves modifying the existing interchange and implementing the extension and grade-separation of Hazel Avenue over Folsom Boulevard and the Sacramento Placerville Transportation Corridor Joint Powers Authority rail corridor. Additionally, Hazel Avenue will be extended south to a proposed intersection with the future Atlanta Street, and the project includes roadway and pedestrian improvements spanning 2,300 feet of Folsom Boulevard. The project was approved by the California Transportation Commission on December 4-5, 2025, following the preparation of a Final Environmental Impact Report in accordance with CEQA provisions. This report confirmed that the project will not have a significant environmental effect, supported by adopted mitigation measures and a monitoring plan. Administrative oversight is provided by the Sacramento County Department of Transportation, with Anastasia Shippey serving as the lead agency contact person. The project is categorized under NAICS code 237310 for highway, street, and bridge construction.

General Info

Sacramento County upgrades Hazel Ave/U.S. 50 interchange with environmental compliance, no contract value or terms specified.

Agency

California → Sacramento County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for Hazel Avenue/U.S. 50 Interchange Project

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Sacramento County
Office AddressN/A
Contacts
Brigitte DrillerAssociate Deputy Director
Anastasia ShippeySenior Planner

Full Description

Show more
The project would modify the existing interchange and extend and grade-separate Hazel Avenue over Folsom Boulevard and the Sacramento Placerville Transportation Corridor -Joint Powers Authority rail corridor. Hazel Avenue would be extended south to a proposed intersection with the future Atlanta Street. The project includes roadway and pedestrian improvements along 2,300 feet of Folsom Boulevard.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California, under solicitation number HD-S3135. The scope of work is extensive, covering civil and infrastructure activities such as site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, and electrical and telecommunications installations. The project is partially funded by several grants, including those from the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with the California Labor Code and DBE Program requirements. Qualified SBE, VSBE, and DBE firms are encouraged to apply, with SBE and VSBE firms requiring certification from the Department of General Services and the Port of Long Beach PlanetBids portal. Bidders must hold a valid California Contractor license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement and prevailing wage rates, requiring onsite workers to be signatory to collective bargaining agreements with various trade unions. Interested firms must contact the lead estimator to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in about 3 hours
View Details
NAICS: 237310
New
Federal
Repair Taxiway Shoulders
Solicitation # W50S8A26BA011
Solicitation W50S8A26BA011 is a sealed bid construction project for the repair of a taxiway shoulder at Pease Air National Guard Base in Newington, New Hampshire. The project, which is 100 percent set aside for small businesses under NAICS code 237310, has an estimated magnitude between $250,000 and $500,000. The scope of work involves constructing approximately 830 square yards of bituminous concrete pavement on the southerly side of the apron to ensure safe wingtip clearance for KC-46A aircraft, as well as installing a snow storage and melting depression integrated with a new catch basin connected to the existing stormwater system. The contract duration is 120 calendar days from the notice to proceed, with performance required to begin within 30 calendar days of the award. The award will be granted to the responsible bidder offering the most advantageous price. Bidders are required to submit hard copy bids via mail or hand delivery to the Portsmouth Armory, as electronic submissions through PIEE are not accepted. Mandatory requirements include a bid bond on SF 24, performance and payment bonds, and attendance at a site visit. Contractors must adhere to strict airfield safety and Foreign Object Debris controls and provide specific insurance coverages, including comprehensive general liability of $500,000 per occurrence. Invoicing is managed through the Wide Area Workflow system following pre-approval from the contracting officer.
W7NN Uspfo Activity Nhang 157

POSTED

about 6 hours ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS