This Solicitation opportunity from California was posted on October 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Hd-S3194 Portwide Trash Full Capture Screens Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the comprehensive installation of port-wide trash full capture screens at multiple piers within the Port of Long Beach, California, including Piers A, B, C, D, F, G, J, S, and T. The work encompasses installing connector pipe screens across these locations, with the contractor responsible for providing traffic control during installation. The project is scheduled for a performance period of 365 days for substantial completion, with final completion expected within 445 days from the issuance of the Notice to Proceed. The scope emphasizes environmental improvements, requiring adherence to California prevailing wage laws, a minimum of 30% self-performance by the contractor, and a 20% participation goal for Small Business Enterprises (SBE) and Very Small Business Enterprises (VSBE). The contractor must hold a valid Class A California Contractor’s License, submit performance and payment bonds equal to 100% of the contract value, and comply with labor standards, including DIR registration and certified payroll reporting. The procurement is conducted through a formal solicitation process, with bids due electronically via the Port of Long Beach PlanetBids System by December 2, 2025. A mandatory pre-bid meeting is scheduled for October 29, 2025, at the Port’s Maintenance Facility, and attendance is required for bid eligibility. The evaluation is primarily based on responsiveness to mandatory requirements and lowest responsive bid, indicating a Lowest Price Technically Acceptable (LPTA) award basis. The contract clauses specify bid security of 5%, bonds, and liquidated damages of $1,000 per day for late completion. The contract also mandates that at least 30% of the work be performed by the contractor’s own personnel, with specific participation and substitution procedures for materials and products. Overall, the project aims to enhance environmental performance at the port through environmentally compliant, timely, and responsible installation of trash capture infrastructure, governed by detailed contractual and technical specifications.
General Info
Place of Performance
CA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from California → Port of Long Beach
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
