Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on October 8, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Upgrading Traffic Control/Safety Device Systems (JOB ORDER CONTRACTING)

Closed
12JOC25001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423860
New
NRP,SON LNCH DIST V — 1680016443714 — SPRPA127QWA20
Solicitation # SPRPA127QWA20
Solicitation SPRPA127QWA20 is an emergency acquisition issued by the Department of the Navy via the DLA Aviation office in Philadelphia for the procurement of NSN 7RH 1680-01-644-3714 CB, described as NRP, SON LNH DIST V. The requirement specifies a delivery timeline of 90 days with shipping terms set as FOB Destination. Inspection and acceptance will occur at the origin. The government intends to make a single award to a technically acceptable offeror, with the evaluation prioritizing past performance over price. Risk assessments may be conducted using the DoD Supplier Performance Risk System to evaluate item, price, and supplier risks. The contract mandates strict adherence to military packaging and marking standards, including MIL-STD-2073-1 for system stock and MIL-STD-129 for labeling. Specific requirements are outlined for electrostatic discharge protection per ANSI/ESD S20.20-2021 and shelf-life markings, requiring at least 85 percent of the Navy shelf-life to remain upon receipt. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and payment requests. Compliance with the Buy American Act and safeguarding covered defense information under DFARS 252.204-7012 is required. Offerors must provide current catalogs or price lists and validate their status in the System for Award Management.
Pa DLA Aviation At Philadelphia

POSTED

5 days ago

DEADLINE

in about 16 hours
NAICS: 423860
SLED
RFQ-171-270000000015-2 | 472/23129.KMM; Woodland C.F. - Site Mechanical Underground
Solicitation # 472/23129
Solicitation 472/23129, managed by the Michigan Department of Technology, Management and Budget (DTMB), is for site mechanical underground construction at the Woodland Correctional Facility in Whitmore Lake, Michigan. The scope of work involves updates to the sanitary sewer and water main systems, requiring the contractor to manage project permits from agencies such as DLARA, MDOT, and EGLE, as well as handle utility location, hydro excavation, and dewatering. Bids are due by November 18, 2026, and require submission via the SIGMA VSS portal, including proof of State Project Registration. Due to the secure nature of the Michigan Department of Corrections facility, personnel must complete a LEIN background check request for perimeter access. The project is governed by MICHSPEC Division 0 Specifications and includes specific requirements for project restoration and the testing of existing water main piping. A construction bid addendum has introduced a material allowance to the bid schedule and clarified standards for MDOC utility and security shutdowns, as well as the handling of owner-furnished sanitary lift station equipment. Technical execution is supported by a geotechnical data report providing soil boring data and engineering recommendations for the installation of 6.0 and 8.0-inch watermains, including guidelines for trenchless crossings.
DTMB

POSTED

9 days ago

DEADLINE

in 22 days
NAICS: 423860
SLED
Locomotive Overhaul Kit
Solicitation # 195772A
Metra is soliciting bids under solicitation number 195772A for the procurement of Locomotive Overhaul Kits to support the in-house rehabilitation and modernization of F40PH-3 locomotives. This indefinite quantity contract is established for a five year period with a total value not to exceed 19 million dollars. The award will be granted to the lowest responsive and responsible bidder based on gross individual unit prices or the gross bid total. Key requirements for responsiveness include bidding on all items, providing a signed contract signature page, acknowledging all addenda, and submitting a correctly executed Buy America Certificate for FTA funded procurements exceeding 150,000 dollars. The scope includes the provision of materials and overhaul kits delivered F.O.B. Destination within the Chicagoland Six County Area, specifically to the 47th Street Maintenance Facility. Pricing must be all inclusive of packaging, transport, handling, and remanufactured costs. The contract mandates a one year warranty period and requires compliance with various federal and state regulations, including 49 CFR Part 26 for Disadvantaged Business Enterprises, the Americans with Disabilities Act, and FTA Circular 4220.1G. Bidders must provide notarized non collusion affidavits and certifications regarding debarment and suspension. The successful contractor is responsible for performing all inspection and acceptance testing of items prior to delivery.
Metra

POSTED

15 days ago

DEADLINE

in 13 days
NAICS: 423860
International
Multiple Victoria-Class Spares - Anti- Flash Device, Cooler,Fluid,Industrial, Cartridge,Check Valve, Parts Kit, Fluid Pressure Filter, Valve, Safety Relief
Solicitation # W8482-275589/A
The Department of National Defence is soliciting proposals under solicitation number W8482-275589/A for the procurement of various Victoria-Class spares. The required items include anti-flash devices, industrial fluid coolers, check valve cartridges, fluid pressure filter parts kits, and safety relief valves. These components are to be delivered in equal quantities to CFB Esquimalt and CFB Halifax. All goods must be new and delivered Free Carrier (FCA) per Incoterms 2020. Bids are due by November 9, 2026, at 14:00 EST, with the Department of National Defence reserving the right to negotiate delivery dates around March 31, 2027. The contract mandates strict quality and packaging standards, including specific marking requirements for manufacturer names and part numbers, and the use of PDF417 bar code symbols for unique identification. Certain items require permanent stamping or etching and must adhere to specific shelf-life requirements, ensuring at least 75 percent of the authorized shelf life remains upon delivery. Bidders proposing equivalent or substitute products must provide comprehensive technical specifications and compliance statements to prove full interchangeability. Payment for undisputed invoices will be issued within 30 days of receipt.
Department of National Defence

POSTED

about 1 month ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The contract involves a Job Order Contracting (JOC) initiative led by the California Department of Transportation to upgrade traffic control and safety device systems along several key routes in Orange County, including Routes 22, 73, 133, 405, and 605. The project focuses on enhancing roadway safety through activities such as replacing pavement markings and installing rumble strips at various locations. The procurement process is initiated via an Invitation for Bid (IFB) with a posting date of October 8, 2025, and a response deadline of November 20, 2025. Bidders are required to hold either a Class A or a Class C-32 license, and the contract is structured as a master agreement with an initial term of 12 months, with the possibility of two additional extensions of 12 months each, depending on performance and need. The contract size is estimated to range between 2 million and 2.2 million dollars, and the award will be granted to the lowest responsive and responsible bidder. The bidding process includes mandatory pre-bid meetings, detailed instructions on bid submission, and provisions for protests. The contract emphasizes compliance with labor policies, insurance, and bonding requirements, ensuring that safety and quality standards are maintained throughout the project. The scope of work primarily involves highway maintenance activities aimed at improving traffic safety and roadway conditions across multiple locations within Orange County. The overall goal is to implement efficient, cost-effective upgrades to traffic control systems that will enhance safety for all roadway users, with the project managed under the guidelines and procedures established by the California Department of Transportation.

Documents

1

IFB 12JOC25001 Upgrading Traffic Control/Safety Device Systems

PDF, High priority: read this first206 pages · ifb
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
ORANGE COUNTY ON ROUTES 22, 73, 133, 405, and 605 AT VARIOUS LOCATIONS

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Los Angeles County At Various Locations On Route 10 From 0.2 Mile West Of Francisquito Avenue Undercrossing To Fairplex Drive Overcrossing And On Route 57 From 0.3 Mile South Of Brea Canyon Road Undercrossing To Gladstone
Solicitation # 07-379904
Solicitation 07-379904 is a unit price construction contract issued by the California Department of Transportation for highway improvements in Los Angeles County. The project scope involves construction on State Highway Route 10, from 0.2 mile west of the Francisquito Avenue undercrossing to the Fairplex Drive overcrossing, and on Route 57, from 0.3 mile south of the Brea Canyon Road undercrossing to Gladstone. With an estimated project cost of 7.4 million dollars, the work encompasses roadway excavation, concrete removal, clearing and grubbing, and the implementation of drainage, utilities, and electrical systems. Key deliverables include pavement structural work and comprehensive traffic management, requiring the use of special portable freeway detour signs and changeable message signs to ensure the traveled way remains open when construction is not active. The contract mandates strict adherence to 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Bidders must submit responses by December 8, 2026. Compliance requirements include following Buy America/Build America standards for manufactured products, providing environmental product declarations for concrete and asphalt, and adhering to prevailing wage rates as determined by the California Department of Industrial Relations or the U.S. Secretary of Labor, whichever is higher. Quality control is emphasized through mandatory ACI Concrete Field-Testing Technician Grade 1 certification for personnel and rigorous testing of materials at METS. Additionally, the project requires a lead compliance plan and specific marking and labeling standards for steel barriers, connection bolts, and pavement markings.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS