Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on July 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Head Start Modular Building Relocation Project At Nuffer Elementary School

Closed
20260702031State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541310
New
Federal
C1DA--NRM A/E - 528A8-CSI-806 Renovate A214-A217 for New MRI
Solicitation # 36C24226R0116
The Department of Veterans Affairs is seeking a qualified Architect-Engineering (A/E) firm to provide design and construction period services for the renovation of rooms A214 through A217 at the Stratton VA Medical Center in Albany, New York. The primary objective is to install a new Philips large-bore 1.5T helium-free MRI unit. This project requires specialized expertise in MRI suite integration, including RF shielding, Class III ICRA protocols, and the management of noise and vibration to avoid disrupting adjacent medical activities. The anticipated contract will be a firm-fixed-price award, with an estimated construction cost range between 1 million and 5 million dollars. Design costs are capped at six percent of the estimated construction cost per VAAR 836.606-71. This procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 541310, with a size standard of 12.5 million dollars. Eligible firms must be certified in the SBA database and comply with strict limitations on subcontracting, ensuring no more than 50% of the service performance is paid to non-SDVOSB entities. The evaluation process is based on seven criteria: professional qualifications, specialized experience, capacity, past performance, geographical location (within 400 miles of the site), construction period service experience, and the use of small business subcontractors. Key personnel must include licensed professionals across multiple engineering disciplines, a Project Manager with at least 10 years of experience and specific Philips MRI project history, a certified Industrial Hygienist, and a PE-licensed RF Shielding Designer. Submissions must be electronic via SF-330 and received by September 14, 2026, with an anticipated award date on or before December 24, 2026.
242-NETWORK Contract Office 02 (36C242)

POSTED

2 days ago

DEADLINE

in 16 days
NAICS: 541310
New
SLED
2027 A&E Prequalification
Solicitation # https://dam.assets.ohio.gov/image/upload/ofcc.ohio.gov/Project_Opportunities/RFQs/2026/RFQ-SCC-270001-AE.pdf
Sinclair Community College is seeking to establish a prequalified pool of architecture and engineering vendors for professional design services under project number SCC-270001. The scope includes a variety of tasks such as small to moderate renovations, deferred maintenance, utility systems, feasibility studies, and construction projects. Qualified firms must be located within a 70 mile driving distance of the college and must be familiar with OFCC documents, local codes, and state regulations. Services are divided into four categories: full architectural services, civil/structural emphasis, mechanical/electrical emphasis, and consulting for master planning and landscape design. Interested firms must submit their qualifications via email to the Purchasing Department by September 24, 2026, at 2:00pm, with written questions due by September 10, 2026. Selection for the prequalified list does not guarantee a contract award, as specific projects will be assigned via purchase orders based on expertise and need. The required scope of services spans from program verification and schematic design to construction administration and post-construction. Evaluation will prioritize experience in higher education, high-level technology, multi-phase projects, and interior and exterior renovations.
Sinclair Community College

POSTED

2 days ago

DEADLINE

in 26 days

General Info

Agency

California → Norwalk-La Mirada Unified School DistrictView Agency

NAICS

541310 - Architectural ServicesView NAICS

Place of Performance

Norwalk, CA, 90650, USA

Set-Aside

NONE

Documents

(3)

FAC2602-22-0501-260701-RFP-F.pdf

PDF

FAC2602-22-0501-260708-RFP-ADDM1-F_1783536173095.pdf

PDF

FAC2602-22-0501-260715-RFP-ADDM2-F_1784227941891.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Norwalk-La Mirada Unified School District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Norwalk-La Mirada Unified School District
View Agency Profile
Office AddressN/A
Contacts
Bomee YoonFacilities Coordinator

Full Description

Show more
Bid #FC-2526-19: The project requires a qualified firm to provide comprehensive architectural and engineering services for the relocation and conversion of a modular classroom building for a new Head Start program at Nuffer Elementary School. The work is divided into two phases: Phase One involves a feasibility study, conceptual design, cost estimating, and support for a LACOE 1303 funding application. Phase Two, contingent on funding approval, covers full design development, construction documents, DSA approval management, and construction administration. The scope includes converting a 40'x120' modular building into a 40'x60' facility on a new foundation, and extensive site development including new playgrounds, shade structures, a 33-space parking lot, new utility connections (water, sewer, fire), landscaping, fencing, and integration of fire alarm, security, and energy management systems.