Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on May 13, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Heat Exchangers Replacement

Closed
70Z0290P8G222500-1Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
WOJC - Multi-Building Plumbing Leak Repair Project
Solicitation # WOJC – Multi-Building Plumbing Leak Repair Project
Education and Training Resources is seeking quotes for a subcontracting opportunity to perform multi-building plumbing leak repairs at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work includes replacing leaking shower P-trap drain pipes in Rooms 123 and 213, repairing a cracked drain pipe in the pipe chase of Room 216, and replacing approximately ten linear feet of leaking heat pipe in both the Administration Building and King Hall. All work must comply with the Massachusetts State Plumbing Code, International Plumbing Code, and applicable federal, state, and local regulations. Contractors are responsible for all cutting, patching, and debris removal, ensuring that all materials used are new and of commercial quality. Interested bidders must submit a detailed quote by October 30, 2026, including a comprehensive cost breakdown of labor and materials, a proposed service schedule, and a bid valid for at least 60 days. Required documentation includes a current SAM.gov UEI number, active registration, W-9, business licenses, Massachusetts plumbing credentials, and certificates of liability insurance. The project is subject to various Federal Acquisition Regulation clauses, including the Davis-Bacon Act and Service Contract Act for prevailing wages, and requires the submission of weekly certified payroll reports. Award selection is at the sole discretion of ETR and is not based solely on the lowest bid. Performance and payment bonds are required for projects exceeding 35,000 dollars, with specific requirements increasing for projects over 150,000 dollars.
Westover Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in 9 days

General Info

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors

Place of Performance

Galveston, TX, 77550, USA

Set-Aside

SBA

Documents

8

21202908G2225_FAR_Updated.pdf

PDF

21202908G2225_OF336_Continuation+Sheet.pdf

PDF

21202908G2225_SF+18_Updated.pdf

PDF

21202908G2225_WDOL_Updated.txt

TXT

IMG_9344.jpg

JPG

IMG_9369.jpg

JPG

IMG_9371.jpg

JPG

IMG_9372.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base New ORLEANS(00029)
Contacts2 people available
OfficeNEW ORLEANS, LA, 70117, USA
Office AddressNEW ORLEANS, LA, 70117, USA

Full Description

Show more
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 and FAR 13, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. Instructions to offerors (Tailored for quotes under FAR part 13), evaluation criteria, and all applicable FAR Provisions and Clauses are attached. The solicitation number is 70Z0290P8G222500 and issued as a Request for Quotation (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2019-01. This is a small business set aside, the applicable NAICS is 238220 and small business size standard is $15M. Where Federal Acquisition Regulation clause language is inconsistent with FAR 13.004, Legal Effect of Quotations, that language is hereby tailored in accordance with FAR 12.302 to be consistent with a request for quotations. This tailoring includes, but is not limited to the following: In accordance with FAR 13.004, a quotation is not an offer, and any clause provision to the contrary is hereby modified to be consistent with FAR 13.004. Where the word "offer/offeror or a derivative of that word appears, it is changed to "quote/quoter or a derivative of that word. The associated NAICS code is 238220 and the small business size standard is $15M. USCG SFO Galveston has a requirement to purchase: Services Building Heat Exchangers Replacement. To include the following: *Work scope is to include, but not limited to flushing existing piping, cleaning existing lines from any debris; removing old oil, pumping new oil; purging system with dry nitrogen, remove and install new dryer units, install heat exchangers (provided by Coast Guard), and charging Dedicated Outdoor Air System (DOAS) unit with new refrigerant as per manufacturer's specifications. The Contractor shall not subcontract any part of this project without prior written consent of the Contracting Officer. *Inspect the DOAS unit and compare to the manufactures specification, give a detailed listing of any defects to LT John T. Waters or MAT2 Victor M. Regalado. *The contractor must remove and dispose of all hazardous material from the site caused by the heat exchangers replacement. *The contractor must be finished and DOAS unit heat exchangers operational, no later than two weeks from the start date. *Work must be in compliance with all OSHA and EPA guidelines. The evaluation factor will be Lowest Priced Technically Acceptable. FAR 52.237-1 -- Site Visit (Apr 1984). Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Principle Place of Performance: U.S Coast Guard Sector Field Office (Services Building) Galveston 3000 Fort Point Rd. Galveston, TX 77550 Period of Performance: The project shall be completed within twenty (14) calendar days after award date. All quotes are due at USCG SFO Galveston by the Close of Business 18 MAY 2020. Submit quotes to the following mailing address, e-mail address, or fax number by the offer due date and time: Primary E-Mail Address: Brandon.R.Thompson@uscg.mil Or Alternate E-Mail Address: Terry.D.Sauer@uscg.mil The Government Point of Contact (POC) for this work is Victor M. Regalado @ Victor.M.Regalado@uscg.mil or by phone @ (281) 464-4690. All work shall be coordinated through the POC. Any and all questions regarding this solicitation shall be submitted in writing to the Contract Specialist at Brandon.R.Thompson@uscg.mil no later than 18 May 2020, 4:00PM Eastern Time or the question may not be answered. Additional information: Updated: 5/13/2020 - Pictures included. Addison - Model # TRSW240CH54A Serial #130402304 Tag # DOAS-S-1.02 Date of Manufacture - June 2013 Work scope includes flushing existing pipe and cleaning existing lines from any debris, but there is no information on how much pipe (diameter & linear feet)is to be flushed and cleaned. Recommend contractor identify which specific piping requires flushing, as we do not have the technical expertise to provide accurate information. The Contractor is to remove old oil and pump new oil, but there is no information as to quantity of oil Estimated quantity 2-3 lbs The Contractor is to remove and install new dryer units but there is no information as to how many dryer units nor the dryers to be provided. Two dryers - Catch ALL HPC-305-S-HH The Contractor is to charge DOAS unit with new refrigerant as per manufacturer's specs but the specs are not provided and there is no information as to quantity and what type of refrigerant There are two circuits using 410A. Each circuit holds 27lbs No information on the quantity and types of hazardous material that the Contractor will be responsible for disposing. Freon, oil, or any byproduct needed to be disposed of properly according to state and federal regulations. No information as to size or weight of the heat exchangers to be installed. Size - approx. 1.5ft x 1.5ft ---- Weight estimated at - 150LBS each Two weeks from Date of Award seems an extraordinarily aggressive timeline given the limitations on the hours Contractor is certain to have access and - particular under present extraordinary circumstances - the uncertainty of availability of the materials necessary to perform this project on short notice. Deadline can be changed due to the circumstance, however, we would like to stick to the original request of having the work completed within two weeks if at all possible.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS