Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on May 20, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Herbicide Treatment for Sickleweed award

Awarded
AG-82X9-S-08-0075Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 4 hours ago

DEADLINE

in 2 days
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning (PCT) contracts in the McAllister Creek area. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit Sp-16-PCT-27 (13.44 acres). The scope of work involves removing competing vegetation while preserving the most vigorous trees, managing slash to ensure it is cleared from roadways and water sources, and removing all debris from the site. Specific technical standards include a maximum stump height of one-half the stump diameter and a maximum slash height of 24 inches. Bids must be submitted in a sealed envelope labeled McAllister Creek PCT 2027 and delivered to the mailbox at the Mt Tolman Complex by 4:00 PM on November 17, 2026; electronic submissions are prohibited. Required documentation includes a bid evaluation form, a detailed work plan, TERO compliance and utilization forms, and a certification regarding debarment and responsibility. While the lowest bid may not necessarily be the acceptable bid, award decisions may use previous contract close-out evaluations as tiebreakers. Contractors are required to maintain liability insurance and a valid Trader License, and they must comply with TERO Title X and TOSHA safety regulations. Payment is based on a bid price per acre for completed and accepted acreage, with 20 percent of each payment withheld until final acceptance. Partial payments are generally restricted to units larger than 10 acres unless weather shutdowns occur. All work is subject to inspection by a designated Contract Officer's Representative to ensure quality and compliance with thinning specifications.
Confederated Tribes of the Colville Reservation

POSTED

about 4 hours ago

DEADLINE

in 14 days
NAICS: 115310
New
SLED
25146 - Furnishing Labor and Equipment for Power Line Right of Way and Easement Clearance and Tree Trimming REBID
Solicitation # 25146
The City of Alcoa is soliciting sealed bids under RFB 25146 for the furnishing of labor, equipment, and materials to perform utility forestry services, including tree trimming, brush removal, and right-of-way and easement clearance. The contract is structured with multiple pricing models, including circuit firm prices, hourly crew rates, and unit rates for tree removal. Work is divided into two annual phases, with Phase I running from July 1st to December 31st and Phase II from January 1st to June 30th. Bids must be submitted by 2:00 p.m. on Tuesday, November 17, 2026, to the Alcoa Purchasing Agent. The scope of work requires strict adherence to ANSI A300 guidelines and safety standards, including OSHA and the National Electrical Safety Code. Key technical requirements include maintaining a 10-foot minimum clearance for distribution lines and a 25-foot clearance for transmission lines, with specific hand-cutting mandates near structures and wetlands. Contractors must possess a valid Pest Commercial Applicator's License from the Tennessee Department of Agriculture for chemical applications and provide an insurance certification. Award decisions will be based on the bid amount as well as the vendor's experience, reputation, and ability to provide future support. All work is guaranteed for one calendar year, and the City of Alcoa Electric Department retains the right to inspect and approve all completed services.
City of Alcoa

POSTED

about 5 hours ago

DEADLINE

in 15 days
NAICS: 115310
New
International
BR28TFD003 Manual Brushing 2 - Kootenay Lake
Solicitation # BR28TFD003
Solicitation BR28TFD003, titled Manual Brushing 2 - Kootenay Lake, is a request from the BC Timber Sales Branch of the Province of British Columbia for the provision of all labor, services, materials, and equipment required to perform manual brushing operations within the Kootenay Business Area. The contract is awarded as a lump sum to the lowest compliant bidder based on the Total Bid Price. In the event of a tie, the winner is determined via a draw using Random.org. Bidders must be certified in the BC Forest Safety Council SAFE Company program and may be required to demonstrate technical experience, qualifications, and possession of necessary machinery. A mandatory bid security of at least 5,000 dollars for tenders under 250,000 dollars, or 10,000 dollars for tenders 250,000 dollars or more, must accompany the submission. Successful bidders must provide a valid Tax Verification Letter from the BC Ministry of Finance for contracts valued at 100,000 dollars or more. Performance requirements include strict adherence to the BCTS Environmental Management System, the Wildfire Act, and the Wildfire Regulation. Contractors are responsible for maintaining documentation of pre-work meetings and inspections, as well as preparing an environmental emergency response plan using the BCTS template. The response deadline for this solicitation is November 25, 2026.
BC Timber Sales Branch

POSTED

3 days ago

DEADLINE

in 23 days

AI Contract Overview

Show more

This contract, awarded by the Department of Agriculture's Rocky Mountain Regional Office, requires the herbicide treatment of approximately 3200 acres of Sickleweed within the Fort Pierre National Grassland across Lyman and Stanley Counties, South Dakota. The contractor is responsible for providing all labor, equipment, transportation, and water necessary for the operation. Specifically, the contractor must supply and apply Telar XP, ensuring precision packing to meet dosage requirements and utilizing a broadcast application of 20 to 25 gallons of mix per acre for accessible areas. The project must be executed during the 2008 field season, with fieldwork starting around mid-May and concluding by June 30, 2008. Due to the growth cycle of the target plants, the entire treatment must be completed within a window of seven to ten days. Upon completion, the contractor is required to submit pesticide application records, total active ingredient measurements, and GIS-based maps with raw GPS data by July 31, 2008, while maintaining full compliance with South Dakota pesticide laws and administrative rules.

General Info

Contract Value

$35,498.4

NAICS

115310 - Support Activities for Forestry

Place of Performance

CO, USA

Set-Aside

NONE

Award Issued Date

Documents

9
PDF, High priority: read this firstaward
High
RTF, High priority: read this first1 page · past-performance
High
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this firstspecifications
High
DOC, High priority: read this first58 pages · rfp
High
DOC, High priority: read this first3 pages · wage-determination
High
DOC, Low priority1 page · q-and-a
Low
DOC, Low priority1 page · q-and-a
Low
DOC, Low priority1 page · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from May 9, 2008 to May 8, 2008. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Rocky Mountain Regional Office
Contacts1 person available
OfficeLAKEWOOD, CO, 80401, USA
Office AddressLAKEWOOD, CO, 80401, USA

Full Description

Show more
SCOPE OF CONTRACT Herbicide treatment of 3200 acres of Sickleweed (Falcaria vulgaris) on the Fort Pierre National Grassland, South Dakota, Lyman and Stanley Counties. LOCATION AND DESCRIPTION Treatment area covers portions of the Fort Pierre National Grassland south of the town Pierre, South Dakota. USGS 7.5-minute topographic maps showing sickleweed locations will be provided upon request at pre-quote conference. 1.1SCOPE OF WORK. The contractor shall be required to: - Furnish any and all labor, transportation, equipment, supplies, water, services, supervision, permits, and licenses necessary to spray herbicide on approximately 3200 acres of Sickleweed. - Contractor will provide 360 ounces of Telar XP, which will be applied at the - oz/ac. Telar XP (an exuberated paste) is made by DuPont and needs to be precision packed by the Telar distributor to match the equipment being used in order to ensure that - oz/acre is being met. - Broadcast application of Telar on the majority of the area accessible by large equipment will require approximately 20-25 gallons of water/herbicide mix per acre. Contractor will be required to provide all water. - Contractor will provide GIS based maps along with raw GPS data (datum used shall be discussed with Forest Service before collection of GPS data) of treated areas along with pesticide application records to the Forest Service at the completion of treatment. The contractor will also be required to provide the Forest Service with total pounds of active ingredient per acre applied at the conclusion of the project. (See Attachments) - Contractor will comply with all pesticide use requirements set forth under SD Law (SDCL) 38-21 and Administrative Rule (ARSD) 12:56. 1.1.2 PERIOD OF PERFORMANCE. Services covered in this solicitation and resultant contract are to be performed during the 2008 field season. Work shall occur when the target plants are actively growing and weather conditions allow them to be susceptible to herbicide effects as per label directions. Work may begin on or about the middle of May and the Contractor shall complete all fieldwork no later than June 30, 2008 and all reports no later than July 31, 2008. Once the plants are mature enough for treatment to begin, the entire treatment will need to be completed within a week to 10 days (from first signs of buds to bloom stage).

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS