Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

High Service Motor Removal and Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Athens-Clarke County Government involves the removal of a failing motor and the installation of a replacement 900 HP unit for water treatment projects. The scope of work includes unwiring and uncoupling the motor from the pump, as well as utilizing heavy lifting cranes or hoists to extract the existing unit from the site. The contractor is required to ensure the replacement motor is successfully installed and fully operational while adhering to safety standards 29 CFR part 1926 and 1910. This opportunity is categorized under NAICS code 238210, with a response deadline of October 6, 2026.

General Info

Subcontract for Athens-Clarke County to replace 900 HP water treatment motor by October 2026.

Agency

Georgia → Athens-clarke County GovernmentView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of 27004.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

BID 27004 - High Service Motor Rehab/ Replacement

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Athens-clarke County Government
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → Athens-clarke County Government
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs removal of a failing motor and installation of a replacement unit for prime contractors on Unified Government of Athens-Clarke County water treatment projects. Unwires motor, uncouples motor from pump, and pulls existing unit from site using heavy lifting cranes or hoists. Complies with safety standards 29 CFR part 1926 and 1910. Delivers a successfully installed and operational 900 HP motor.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 18 days
View Details
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 18 days
View Details
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 18 days
View Details
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 12 hours ago

DEADLINE

in 5 days
View Details

More opportunities from Georgia → Athens-clarke County Government

Same awarding agency

NAICS: 541620
SLED
RFQ #27009 PLANNING AND ENVIRONMENTAL SERVICES TASK ORDER CONTRACT
Solicitation # RFQ #27009
The Unified Government of Athens-Clarke County is soliciting qualifications for RFQ #27009 to establish a five-year Master Agreement for Planning and Environmental Services at the Athens-Ben Epps Airport. The scope of work encompasses a wide range of aviation planning services, including airport master planning, noise compatibility planning, environmental assessments, airfield modeling, and financial planning, all of which must comply with FAA AC 150/5100-14E and applicable Georgia statutes. Selected consultants will be engaged on an assignment-by-assignment basis through individual task orders for projects initiated within the five-year term. Proposals must be submitted electronically via OpenGov Procurement by October 5, 2026, at 10:00 A.M. ET. In accordance with FAA regulations, cost is not a selection criterion; instead, award decisions are based on a weighted evaluation of ten factors, including the capability of the engineer and subcontractors, airport construction experience, professional reputation, key personnel qualifications, and the implementation of a Disadvantaged Business Enterprise Program. The DBE goal for FY25-FY26 is set at 8.94%. Contractors must meet strict compliance and insurance requirements, including E-Verify registration and adherence to O.C.G.A. § 13-10-91. Insurance policies must be issued by a Georgia-licensed company with a minimum AM Best rating of A-, and the Unified Government of Athens-Clarke County must be named as an additional insured on general liability, automobile, and umbrella policies. Following the selection of a qualified engineer, costs for specific tasks will be negotiated between the selected firm and the government.
Environmental Consulting Services

POSTED

11 days ago

DEADLINE

in 23 days
View Details
NAICS: 541330
SLED
RFQ #27008 - ARCHITECTURAL AND ENGINEERING SERVICES TASK ORDER CONTRACT
Solicitation # RFQ #27008
The Unified Government of Athens-Clarke County is soliciting qualifications for RFQ 27008 to establish a five-year Master Agreement for Architectural and Engineering services at the Athens-Ben Epps Airport. The selected consultant will be assigned work through individual task orders covering a full project lifecycle, including preliminary planning, design, bidding, negotiation, construction administration, and project closeout. The scope encompasses a wide range of airport improvements such as airfield pavement, lighting, NAVAIDs/ILS, drainage systems, security fencing, and airport building rehabilitation, as well as the preparation of Airport Layout Plans and environmental impact studies. All services must adhere to FAA Advisory Circulars, specifically AC 150/5100-14E, and comply with 49 CFR Part 26 regarding Disadvantaged Business Enterprise (DBE) requirements, with a specific DBE goal of 8.94 percent for FY25-FY26. Applicants must be pre-qualified by the Georgia Department of Transportation in Area Class No. 2.09 Engineering and provide certifications for E-Verify compliance. Proposals are due by 10:00 A.M. ET on October 5, 2026, via the ACCGov electronic portal, following a mandatory pre-proposal conference held on September 10, 2026. Evaluation is based on a weighted 100-point system focusing on firm capability, airport construction experience, reputation, key personnel, schedule and cost performance, and geographic familiarity. Awarded contractors must maintain significant insurance coverage, including 1 million dollars in professional liability and 2 million dollars in umbrella liability, and name the Unified Government of Athens-Clarke County as an additional insured.
Engineering Services

POSTED

11 days ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS